TxDOT contract A00214716 bid tabulation
ACP OVERLAY, SH0130 (VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES). Let by Texas DOT on August 8, 2025, Williamson, Austin District. 5 bids received; low bid $13,801,280 by Allen Keller Company, -38% against the engineer's estimate of $22,291,642.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 82
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allen Keller Company | $13,801,280 | Low | -38% |
| 2 | Texas Materials Group, Inc. | $14,979,475 | +9.0% | -33% |
| 3 | Lone Star Paving Company | $15,280,361 | +11% | -31% |
| 4 | Hunter Industries, LTD. | $15,348,400 | +11% | -31% |
| 5 | Clark Construction of Texas, Inc. | $23,766,904 | +72% | +7.0% |
Engineer's estimate: $22,291,642.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Allen Keller Company | 2. Texas Materials Group, Inc. | 3. Lone Star Paving Company | 4. Hunter Industries, LTD. | 5. Clark Construction of Texas, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A) (134-7001) | STA | 133 | $121.00 | $121.11 | $190.00 | $265.00 | $156.80 | $996.95 |
| 2 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 43,614 | $150.00 | $100.81 | $120.00 | $127.00 | $111.90 | $176.79 |
| 3 | PFC-C PG76-22 sac-A (342-7001) | TON | 670 | $184.00 | $95.88 | $175.00 | $156.00 | $165.88 | $234.90 |
| 4 | Tom-C PG76-22 sac-A (347-7001) | TON | 45,282 | $180.00 | $128.58 | $136.00 | $135.00 | $137.20 | $212.65 |
| 5 | Flexible pavement structure repair(6") (351-7005) | SY | 2,155 | $51.25 | $29.21 | $56.00 | $65.00 | $57.76 | $125.57 |
| 6 | Plane & text asphalt concrete pavement(2") (354-7019) | SY | 709,875 | $2.75 | $0.54 | $1.50 | $2.40 | $2.03 | $3.07 |
| 7 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 7,389 | $6.00 | $3.56 | $4.00 | $2.65 | $2.21 | $3.60 |
| 8 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 1,243 | $76.25 | $44.28 | $78.00 | $78.00 | $81.90 | $88.00 |
| 9 | Mobilization (500-7001) | LS | 1 | $2,026,490 | $1,311,000 | $470,000 | $71,000 | $815,244 | $1,000,000 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $5,173.81 | $6,162.03 | $7,000.00 | $3,600.00 | $3,622.65 | $3,000.00 |
| 11 | Portable changeable message sign (503-7001) | DAY | 570 | $350.00 | $74.29 | $55.00 | $10.00 | $54.12 | $100.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 256 | $250.00 | $161.99 | $192.00 | $150.00 | $135.31 | $100.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 256 | $1,000.00 | $516.06 | $50.00 | $100.00 | $162.37 | $100.00 |
| 14 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 10,000 | $4.25 | $2.43 | $7.00 | $1.03 | $3.45 | $3.50 |
| 15 | Biodegradable erosion control logs (remove) (506-7046) | LF | 10,000 | $2.25 | $0.70 | $4.50 | $0.25 | $1.00 | $1.07 |
| 16 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $700.00 | $643.50 | $550.00 | $925.00 | $915.60 | $915.60 |
| 17 | Install delineator assembly (D-DW)SZ 1(WFLX)SRF (658-7047) | EACH | 165 | $150.00 | $60.83 | $86.50 | $87.25 | $86.55 | $86.55 |
| 18 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 31,280 | $1.50 | $0.16 | $0.23 | $0.25 | $0.25 | $0.85 |
| 19 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 216 | $1.00 | $0.17 | $0.25 | $0.52 | $0.52 | $0.85 |
| 20 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 183,566 | $1.00 | $0.15 | $0.22 | $0.25 | $0.25 | $0.85 |
| 21 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 549 | $1.25 | $0.35 | $0.50 | $0.34 | $0.34 | $2.25 |
| 22 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 45,118 | $1.00 | $0.21 | $0.30 | $0.34 | $0.34 | $1.10 |
| 23 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 4,110 | $2.50 | $0.70 | $1.00 | $1.51 | $1.51 | $3.50 |
| 24 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 3,035 | $6.75 | $0.70 | $1.00 | $2.42 | $2.42 | $7.00 |
| 25 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 124 | $113.75 | $11.95 | $17.00 | $43.00 | $43.00 | $200.00 |
| 26 | Work zone pavement marking non-removing (W)(double arrow) (662-7019) | EACH | 24 | $156.50 | $14.06 | $20.00 | $61.00 | $61.00 | $300.00 |
| 27 | Work zone pavement marking non-removing (W)(uturn arrow) (662-7027) | EACH | 8 | $241.00 | $14.06 | $20.00 | $61.00 | $61.00 | $350.00 |
| 28 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 118 | $133.25 | $11.95 | $17.00 | $43.00 | $43.00 | $225.00 |
| 29 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 101 | $27.50 | $3.52 | $5.00 | $16.00 | $16.00 | $25.00 |
| 30 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 195,109 | $1.00 | $0.15 | $0.22 | $0.25 | $0.25 | $0.85 |
| 31 | Work zone pavement marking non-removing (Y)12"(solid) (662-7040) | LF | 3,760 | $1.50 | $0.25 | $0.35 | $0.25 | $0.25 | $3.50 |
| 32 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 1,025 | $4.25 | $1.23 | $1.75 | $2.42 | $2.42 | $7.00 |
| 33 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 22,437 | $1.50 | $2.16 | $1.02 | $1.50 | $1.63 | $1.00 |
| 34 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 10,040 | $1.75 | $2.19 | $1.02 | $1.50 | $1.63 | $1.00 |
| 35 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 216 | $2.00 | $0.52 | $0.75 | $1.00 | $1.00 | $2.50 |
| 36 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 549 | $2.50 | $0.78 | $1.10 | $1.00 | $1.00 | $3.50 |
| 37 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 47,451 | $2.25 | $0.56 | $0.80 | $0.58 | $0.58 | $1.25 |
| 38 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 5,567 | $10.00 | $1.93 | $2.75 | $3.39 | $3.39 | $3.50 |
| 39 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 3,084 | $14.75 | $4.22 | $6.00 | $6.09 | $6.09 | $7.00 |
| 40 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 138 | $371.75 | $91.36 | $130.00 | $120.00 | $120.00 | $220.00 |
| 41 | Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044) | EACH | 24 | $265.00 | $112.45 | $160.00 | $155.00 | $155.00 | $320.00 |
| 42 | Reflectorized pavement marking type I(W)(uturn arrow)(090MIL) (666-7050) | EACH | 8 | $350.00 | $154.62 | $220.00 | $245.00 | $245.00 | $350.00 |
| 43 | Reflectorized pavement marking type I(W)(lane drop arrow)(090MIL) (666-7059) | EACH | 3 | $327.50 | $210.85 | $300.00 | $425.00 | $425.00 | $225.00 |
| 44 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 137 | $426.00 | $105.42 | $150.00 | $160.00 | $160.00 | $225.00 |
| 45 | Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089) | EACH | 103 | $57.75 | $28.11 | $40.00 | $39.50 | $39.50 | $25.00 |
| 46 | Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116) | LF | 3,760 | $11.75 | $1.93 | $2.75 | $3.39 | $3.39 | $3.50 |
| 47 | Reflectorized pavement marking type I (Y)24"(solid)(090MIL) (666-7122) | LF | 1,025 | $9.25 | $4.22 | $6.00 | $6.09 | $6.09 | $7.00 |
| 48 | Reflectorized pavement marking type II (W) (LN reduct arrow) (666-7192) | EACH | 3 | $180.00 | $52.71 | $75.00 | $248.50 | $248.50 | $150.00 |
| 49 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 180,505 | $1.25 | $0.46 | $0.65 | $0.65 | $0.65 | $1.35 |
| 50 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 192,856 | $1.75 | $0.46 | $0.65 | $0.65 | $0.65 | $1.35 |
| 51 | Pavement sler 6" (callout) (666-7374) | LF | 8,753 | $0.75 | $0.12 | $0.17 | $0.70 | $0.70 | $2.00 |
| 52 | Pavement sler 8" (callout) (666-7375) | LF | 2,127 | $1.00 | $0.19 | $0.27 | $0.70 | $0.70 | $3.00 |
| 53 | Pavement sler 10" (callout) (666-7376) | LF | 890 | $1.25 | $0.28 | $0.40 | $0.70 | $0.70 | $3.50 |
| 54 | Pavement sler 12" (callout) (666-7377) | LF | 1,478 | $1.50 | $0.29 | $0.42 | $0.70 | $0.70 | $4.00 |
| 55 | Pavement sler 24" (callout) (666-7379) | LF | 49 | $3.00 | $0.52 | $0.75 | $0.70 | $0.70 | $8.00 |
| 56 | Pavement sler (arrow)(callout) (666-7380) | EACH | 14 | $55.00 | $10.54 | $15.00 | $7.00 | $7.00 | $200.00 |
| 57 | Pavement sler (word)(callout) (666-7381) | EACH | 19 | $55.00 | $10.54 | $15.00 | $7.00 | $7.00 | $220.00 |
| 58 | Pavement sler (double arrow)(callout) (666-7383) | EACH | 2 | $70.00 | $17.57 | $25.00 | $7.00 | $7.00 | $300.00 |
| 59 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 31,280 | $1.00 | $0.38 | $0.54 | $0.50 | $0.50 | $1.10 |
| 60 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 7,026 | $1.25 | $0.38 | $0.54 | $0.40 | $0.40 | $1.10 |
| 61 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 7,041 | $1.00 | $0.38 | $0.54 | $0.40 | $0.40 | $1.10 |
| 62 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 840 | $23.50 | $10.54 | $15.00 | $17.76 | $17.76 | $25.00 |
| 63 | Reflectorized pavement marker type I-C (672-7002) | EACH | 632 | $9.50 | $2.81 | $4.00 | $4.30 | $4.30 | $7.00 |
| 64 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,431 | $10.25 | $2.67 | $3.80 | $4.30 | $4.30 | $7.00 |
| 65 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 3,663 | $9.25 | $2.67 | $3.80 | $4.30 | $4.30 | $7.00 |
| 66 | Eliminating existing PM & markers (6") (677-7002) | LF | 10,149 | $2.25 | $0.69 | $0.98 | $0.52 | $0.52 | $5.00 |
| 67 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,170 | $7.75 | $0.56 | $0.80 | $0.52 | $0.52 | $7.50 |
| 68 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,488 | $17.00 | $0.88 | $1.25 | $0.52 | $0.52 | $4.00 |
| 69 | Eliminating existing PM & markers (24") (677-7008) | LF | 61 | $10.50 | $1.41 | $2.00 | $0.52 | $0.52 | $8.00 |
| 70 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 18 | $200.50 | $35.14 | $50.00 | $20.50 | $20.50 | $150.00 |
| 71 | Eliminating existing PM & markers (word) (677-7015) | EACH | 21 | $235.50 | $35.14 | $50.00 | $20.50 | $20.50 | $175.00 |
| 72 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 2 | $15.00 | $10.54 | $15.00 | $10.60 | $10.60 | $20.00 |
| 73 | Pavement surface preparation for marking (6") (678-7002) | LF | 10,149 | $0.50 | $0.07 | $0.10 | $0.07 | $0.07 | $0.01 |
| 74 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,170 | $0.50 | $0.14 | $0.20 | $0.07 | $0.07 | $0.02 |
| 75 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,488 | $1.00 | $0.20 | $0.28 | $0.07 | $0.07 | $0.03 |
| 76 | Pavement surface preparation for marking (24") (678-7008) | LF | 61 | $3.25 | $0.35 | $0.50 | $0.07 | $0.07 | $0.06 |
| 77 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 18 | $29.50 | $7.03 | $10.00 | $0.07 | $0.07 | $10.00 |
| 78 | Pavement surface preparation for marking (word) (678-7016) | EACH | 21 | $33.75 | $7.03 | $10.00 | $0.07 | $0.07 | $15.00 |
| 79 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 2 | $110.00 | $1.41 | $2.00 | $0.07 | $0.07 | $1.00 |
| 80 | JT / CRCK seal (rubber - asphalt) (712-7001) | LMI | 6.80 | $768.25 | $5,369.46 | $2,100.00 | $2,950.00 | $2,205.00 | $5,300.00 |
| 81 | Underseal course (3006-7001) | GAL | 18,940 | $3.75 | $3.70 | $4.10 | $3.30 | $4.41 | $4.50 |
| 82 | Bonding course (3007-7001) | GAL | 189,358 | $3.50 | $3.70 | $3.15 | $2.90 | $3.31 | $3.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.