TxDOT letting results, February 4, 2026
38 contracts let by Texas DOT on February 4, 2026, $239,180,568 in low bids, a median of 5 bidders per contract. On the 38 with an engineer's estimate, the low bid came in under it 30 times; median low bid -13% against the estimate.
- Owner
- Texas DOT
- Contracts
- 38
- Low bids, total
- $239,180,568
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00121975 | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | Houston District | 10 | Harper Brothers Construction LLC | $74,036,475 | $78,783,439 | +6.0% | -6.0% | TxDOT |
| A00045441 | Widen Road - Add Lanes, FM 549 (SH 205 to SH 276) | Dallas District | 12 | Urban Infraconstruction LLC | $29,812,034 | $31,956,749 | +7.0% | -14% | TxDOT |
| A00205634 | Construct New Road, SS 394 (IH 35E to FM 877) | Dallas District | 11 | Mario Sinacola & Sons Excavating, Inc. | $18,932,077 | $20,400,001 | +8.0% | -25% | TxDOT |
| A00217225 | Construct Rest Area, IH 10 (2 MI E OF SS 148 to 4.8 MI E OF SS 148) | El Paso District | 2 | Ragle Construction, Inc. | $18,198,405 | $24,800,000 | +36% | +2.0% | TxDOT |
| A00063678 | Resurface Roadway, IH 35 (IH 410 to W. Mayfield Drive) | San Antonio District | 4 | Lone Star Paving Company | $15,028,560 | $15,980,512 | +6.0% | -19% | TxDOT |
| A00186267 | Resurface Roadway, US 59 (0.9 mi N of Piney Creek to Angelina County Line) | Lufkin District | 3 | Texas Materials Group, Inc. | $8,993,704 | $9,927,776 | +10% | -22% | TxDOT |
| A00211983 | Bridge Maintenance, IH 20 (Bonnie View Road to IH 635) | Dallas District | 4 | Ragle Construction, Inc. | $7,984,023 | $8,089,135 | +1.0% | -14% | TxDOT |
| A00210422 | Surfacing/Roadway Restoration, SL 375 (0.87 MI E OF US 54 to 0.11 MI W OF PARK STREET) | El Paso District | 2 | Dan Williams Company | $7,195,638 | $7,992,693 | +11% | -7.0% | TxDOT |
| A00216989 | Resurface Roadway, US 281 (FM 1937 to Bexar/Atascosa County Line) | San Antonio District | 3 | Cactus Transport II, LLC | $7,153,062 | $8,054,632 | +13% | -11% | TxDOT |
| A00207610 | Hazard Elimination & Safety, FM 372 (0.25 mi W of CR 294 to FM 3496) | Wichita Falls District | 7 | Overland Corporation | $5,255,697 | $6,499,041 | +24% | -12% | TxDOT |
| A00188781 | Surfacing/Roadway Restoration, FM 529 (Brazos River to FM 362) | Houston District | 7 | Durwood Greene Construction Co. | $3,274,774 | $3,720,352 | +14% | -26% | TxDOT |
| A00213638 | Rehabilitate Existing Roadway, SS 63 (US 80 to SL 281) | Tyler District | 4 | Madden Contracting Company, LLC. | $3,172,923 | $3,282,823 | +3.0% | -10% | TxDOT |
| A00127774 | Install/Rehabilitate Its, IH 37 (AT INTERS. IH37/SH 286 to 1.7 MI S OF SH358/IH37 INTERCHANGE) | Corpus Christi District | 6 | Traf-Tex, Inc. | $3,168,237 | $3,305,561 | +4.0% | +8.0% | TxDOT |
| A00063498 | Rehabilitate Existing Roadway, US 281 (IH 20 to UPRR) | Fort Worth District | 8 | Texas Materials Group, Inc. | $2,945,709 | $3,086,687 | +5.0% | -38% | TxDOT |
| A00209803 | Preventive Maintenance, SH 29 (0.7 MI E of PR 4 to 0.46 MI W of RM 3509) | Austin District | 6 | Lone Star Paving Company | $2,897,632 | $2,975,898 | +3.0% | -10% | TxDOT |
| A00134679 | Bridge Replacement, HOPKINS RD (Hopkins Rd (CR 209) at Turkey Creek to .) | Houston District | 13 | Trevway, Inc. | $2,787,245 | $2,855,406 | +2.0% | -18% | TxDOT |
| A00196530 | Surfacing/Roadway Restoration, FM 1069 (Hahn St to SH 361) | Corpus Christi District | 4 | Anderson Columbia Co., Inc. | $2,477,701 | $2,513,036 | +1.0% | -1.0% | TxDOT |
| A00063484 | Traffic Control Devices, Various (VARIOUS LOCATIONS IN to THE TYLER DISTRICT) | Tyler District | 3 | Stripe-A-Zone, LLC | $2,466,733 | $2,746,486 | +11% | -28% | TxDOT |
| A00203603 | Bridge Maintenance, Various (DISTRICTWIDE to ALL COUNTIES) | Yoakum District | 12 | BK Field Operations LLC | $2,343,182 | $2,415,455 | +3.0% | +1.0% | TxDOT |
| A00209818 | Preventive Maintenance, SL 275 (Braker Lane to Morrow St.) | Austin District | 5 | Allen Keller Company | $2,185,903 | $2,253,646 | +3.0% | +1.0% | TxDOT |
| A00188551 | Bridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .) | Amarillo District | 7 | L A Fuller & Sons Construction, LTD. | $1,996,761 | $2,154,519 | +8.0% | -19% | TxDOT |
| A00196734 | Intersection Improvement, SH 17 (At County Road 131 to .) | Odessa District | 4 | A. L. Helmcamp, Inc. | $1,752,100 | $1,839,247 | +5.0% | +1.0% | TxDOT |
| A00217976 | PAVEMENT MARKINGS, IH0002 (DISTRICT WIDE to VARIOUS ROADWAYS) | Pharr District | 5 | Pavement Markings Inc. | $1,685,138 | $1,863,087 | +11% | -23% | TxDOT |
| A00196408 | Traffic Signal Improvements, Various (Districtwide Traffic Control FY 2026 to Project 1) | San Antonio District | 4 | E-Z Bel Construction, LLC | $1,489,271 | $1,730,730 | +16% | -1.0% | TxDOT |
| A00214997 | ASPHALT, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 1 | Ergon Asphalt & Emulsions, Inc. | $1,478,920 | -24% | TxDOT | ||
| A00193290 | Install Illumination, SH 8 (at SH 11 to .) | Atlanta District | 7 | Striping Technology, L.P. | $1,297,722 | $1,463,896 | +13% | -11% | TxDOT |
| A00123516 | Advanced Traffic Management System, FM 1960 (SH 249 to IH 45) | Houston District | 4 | Third Coast Services LLC | $1,278,951 | $1,455,497 | +14% | -25% | TxDOT |
| A00218348 | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County) | Houston District | 10 | BK Field Operations LLC | $1,198,560 | $1,351,475 | +13% | +4.0% | TxDOT |
| A00217990 | CLEANING AND SWEEPING HIGHWAYS, US 59 (Various Highways in Fort Bend County to Various Highways in Fort Bend County) | Houston District | 4 | T & M Lawn-Fence Service, LLC | $1,096,900 | $1,218,868 | +11% | -27% | TxDOT |
| A00036817 | Bridge Replacement, COUNTY ROAD 218 (CR 218 OVER DUFFAU CREEK to .) | Fort Worth District | 9 | THK Construction LLC | $976,095 | $1,003,230 | +3.0% | -20% | TxDOT |
| A00032669 | Bridge Replacement, CR 6010 (ROBERTS RD. AT PANTHER CREEK to .) | Fort Worth District | 9 | THK Construction LLC | $875,772 | $875,953 | 0.0% | -14% | TxDOT |
| A00214224 | Highway/Railroad Improvement, Various (Various Locations in Travis and Wilco to Various Locations in Travis and Wilco) | Austin District | 5 | Stripe-A-Zone, LLC | $797,816 | $913,084 | +14% | -4.0% | TxDOT |
| A00206947 | Install Illumination, US 77 (@ SH 320 to @ SH 320) | Waco District | 4 | E-Z Bel Construction, LLC | $773,917 | $832,000 | +8.0% | +6.0% | TxDOT |
| A00198028 | Construct Pedestrian Infrastructure, BU 271B (E Price St to MLK Dr) | Paris District | 13 | Highway 19 Construction LLC | $727,153 | $753,594 | +4.0% | -19% | TxDOT |
| A00216465 | Landscape Development, SH 66 (Nona Street to East City Limits) | Dallas District | 5 | Garret Shields Infrastructure | $714,400 | $758,848 | +6.0% | -14% | TxDOT |
| A00101674 | State Park Improvements, EPWORTH PL (MISSION LAKE ROAD to GUADALUPE DELTA WMA) | Yoakum District | 11 | Garret Shields Infrastructure | $342,250 | $398,935 | +17% | -22% | TxDOT |
| A00211035 | Hazard Elimination & Safety, FM 608 (S of CR 147 to SH 70) | Abilene District | 6 | Flat Line, Inc. | $198,180 | $211,580 | +7.0% | -12% | TxDOT |
| A00043255 | State Park Improvements, ALMA DR (VILLAGE CREEK STATE PARK (PR 74) to .) | Beaumont District | 2 | Texas Materials Group, Inc. | $190,948 | $258,152 | +35% | +58% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way