| 1 | Removing concrete (riprap) (104-7006) | SY | 1,659 | $40.00 | $23.00 | $30.00 |
| 2 | Excavation (special) (110-7003) | CY | 170 | $315.00 | $10.00 | $300.00 |
| 3 | Embankment (final)(OC)(type A) (132-7001) | CY | 700 | $50.00 | $14.00 | $120.00 |
| 4 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 480 | $315.00 | $200.00 | $190.00 |
| 5 | Tack coat (341-7082) | GAL | 1,325 | $4.30 | $8.00 | $8.00 |
| 6 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 9,730 | $160.00 | $151.15 | $151.00 |
| 7 | Flexible pavement structure repair(6") (351-7005) | SY | 48,350 | $45.00 | $48.00 | $56.00 |
| 8 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 7,050 | $4.75 | $6.00 | $3.00 |
| 9 | Planing asphalt concrete pavement(0" to 0.5" micro) (354-7044) | SY | 2,546 | $7.00 | $9.00 | $3.50 |
| 10 | Planing asphalt concrete pavement(2") (354-7051) | SY | 142,685 | $2.00 | $2.00 | $2.75 |
| 11 | Riprap (concrete)(CL B) (432-7005) | CY | 315 | $450.00 | $525.00 | $500.00 |
| 12 | Riprap (mow strip)(4 in) (432-7013) | CY | 334 | $645.00 | $600.00 | $580.00 |
| 13 | Adjusting manholes (479-7001) | EACH | 1 | $1,465.00 | $1,500.00 | $8,000.00 |
| 14 | Adjusting inlets (479-7002) | EACH | 6 | $1,630.00 | $2,100.00 | $6,000.00 |
| 15 | Adjusting manholes (utility box) (479-7004) | EACH | 12 | $930.00 | $915.00 | $2,000.00 |
| 16 | Mobilization (500-7001) | LS | 1 | $694,658 | $150,000 | $400,000 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $9,000.00 | $15,000 | $15,000 |
| 18 | Portable changeable message sign (503-7001) | DAY | 56 | $150.00 | $150.00 | $200.00 |
| 19 | Portable changeable message sign (503-7002) | EACH | 6 | $9,000.00 | $12,000 | $14,000 |
| 20 | TMA (stationary) (505-7001) | DAY | 138 | $225.00 | $225.00 | $300.00 |
| 21 | TMA (mobile operation) (505-7002) | HR | 480 | $60.00 | $65.00 | $75.00 |
| 22 | Construction exits (install) (type 1) (506-7020) | SY | 156 | $45.00 | $24.00 | $50.00 |
| 23 | Construction exits (remove) (506-7024) | SY | 156 | $20.00 | $10.00 | $20.00 |
| 24 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 283 | $13.00 | $16.50 | $20.00 |
| 25 | Biodegradable erosion control logs (remove) (506-7046) | LF | 283 | $2.50 | $4.75 | $1.00 |
| 26 | Metal W-beam guard fence (steel post) (540-7002) | LF | 13,005 | $32.00 | $28.00 | $31.00 |
| 27 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 17 | $2,200.00 | $3,000.00 | $3,000.00 |
| 28 | Downstream anchor terminal section (540-7015) | EACH | 9 | $1,530.00 | $1,500.00 | $2,000.00 |
| 29 | Metal beam guard fence (long span system) (540-7027) | EACH | 1 | $675.00 | $1,500.00 | $2,000.00 |
| 30 | Connector plate for thrie beam (540-7030) | EACH | 12 | $500.00 | $1,200.00 | $1,500.00 |
| 31 | Remove metal beam guard fence (542-7001) | LF | 13,160 | $2.30 | $2.00 | $2.00 |
| 32 | Remove downstream anchor terminal (542-7003) | EACH | 9 | $275.00 | $425.00 | $850.00 |
| 33 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 9 | $280.00 | $425.00 | $850.00 |
| 34 | Guardrail end treatment (install) (544-7001) | EACH | 14 | $3,150.00 | $4,000.00 | $3,800.00 |
| 35 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $270.00 | $425.00 | $1,000.00 |
| 36 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 226 | $21.25 | $25.00 | $10.00 |
| 37 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 414 | $32.00 | $45.00 | $10.00 |
| 38 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 776 | $20.60 | $25.00 | $10.00 |
| 39 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 388 | $13.20 | $30.00 | $10.00 |
| 40 | Remove delin & object marker assms (658-7078) | EACH | 7 | $20.00 | $30.00 | $100.00 |
| 41 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 10,693 | $1.40 | $2.55 | $3.20 |
| 42 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 24,396 | $0.50 | $2.55 | $3.20 |
| 43 | Work zone pavement marking removing (W)12"(lane drop) (662-7074) | LF | 4,948 | $5.20 | $5.00 | $6.25 |
| 44 | Work zone pavement marking removing (W)(entr gore) (662-7084) | EACH | 3 | $545.00 | $4,900.00 | $6,125.00 |
| 45 | Work zone pavement marking removing (W)(exit gore) (662-7085) | EACH | 4 | $500.00 | $5,800.00 | $7,250.00 |
| 46 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 24,396 | $0.50 | $2.55 | $3.20 |
| 47 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 206 | $1.70 | $2.25 | $6.25 |
| 48 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 445 | $1.60 | $0.75 | $0.94 |
| 49 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 2,989 | $2.75 | $3.00 | $3.75 |
| 50 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 2 | $350.00 | $145.00 | $181.25 |
| 51 | Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044) | EACH | 6 | $190.00 | $195.00 | $245.00 |
| 52 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 6 | $390.00 | $185.00 | $230.00 |
| 53 | Reflectorized pavement marking type I(W)(entr gore)(090MIL) (666-7068) | EACH | 4 | $595.00 | $1,000.00 | $1,250.00 |
| 54 | Reflectorized pavement marking type I(W)(exit gore)(090MIL) (666-7071) | EACH | 5 | $830.00 | $1,700.00 | $2,125.00 |
| 55 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 9,175 | $0.41 | $0.23 | $0.29 |
| 56 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 445 | $0.95 | $0.23 | $0.29 |
| 57 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 35,586 | $0.58 | $0.23 | $0.29 |
| 58 | Reflectorized pavement marking type II (W) 12" (DOT) (666-7180) | LF | 2,807 | $0.75 | $1.55 | $1.94 |
| 59 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 2,989 | $2.50 | $1.55 | $1.94 |
| 60 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 2 | $103.00 | $90.00 | $115.00 |
| 61 | Reflectorized pavement marking type II (W) (double arrow) (666-7187) | EACH | 6 | $100.00 | $110.00 | $140.00 |
| 62 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 6 | $125.00 | $120.00 | $150.00 |
| 63 | Reflectorized pavement marking type II (W) (entr gore) (666-7195) | EACH | 4 | $1,900.00 | $320.00 | $400.00 |
| 64 | Reflectorized pavement marking type II (W) (exit gore) (666-7196) | EACH | 5 | $250.00 | $500.00 | $625.00 |
| 65 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 29,352 | $0.49 | $0.23 | $0.29 |
| 66 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 34,336 | $0.95 | $1.20 | $1.50 |
| 67 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 34,172 | $0.95 | $1.20 | $1.50 |
| 68 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 9,175 | $0.65 | $0.85 | $1.06 |
| 69 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,252 | $1.25 | $0.85 | $1.06 |
| 70 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 2,807 | $2.55 | $3.00 | $3.75 |
| 71 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 9 | $2,600.00 | $2,600.00 | $3,250.00 |
| 72 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,511 | $6.60 | $5.50 | $6.88 |
| 73 | Eliminating existing PM & markers (4") (677-7001) | LF | 15,548 | $0.70 | $0.45 | $0.56 |
| 74 | Pavement surface preparation for marking (6") (678-7002) | LF | 63,823 | $0.14 | $0.15 | $0.19 |
| 75 | Pavement surface preparation for marking (12") (678-7006) | LF | 7,904 | $0.81 | $0.50 | $0.63 |
| 76 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $30.00 | $50.00 | $80.00 |
| 77 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 6 | $50.00 | $55.00 | $80.00 |
| 78 | Pavement surface preparation for marking (word) (678-7016) | EACH | 6 | $75.00 | $85.00 | $106.00 |
| 79 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 4 | $150.00 | $140.00 | $175.00 |
| 80 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 5 | $150.00 | $200.00 | $250.00 |
| 81 | Membrane underseal (3005-7001) | GAL | 28,545 | $3.00 | $5.50 | $8.00 |
| 82 | SP-BMD SP-C sac-A PG 70-22 (3024-7001) | TON | 5,990 | $180.00 | $141.15 | $90.00 |