Urban Infraconstruction LLC: TxDOT bid record

Urban Infraconstruction LLC submitted 18 bids on Texas DOT contracts in the data, from 01 MAY 2025 to 06 AUG 2026, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +26% above the low bid.

Owner
Texas DOT
Low bid volume
$99,662,033
Latest bid
06 AUG 2026
Data through
19 NOV 2026
18Bids
2Low bids
11Win rate, percent
+26%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
20251400%
20264250%
Urban Infraconstruction LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District5120%
Fort Worth District400%
San Antonio District200%
Laredo District11100%
Childress District100%
Abilene District100%
Corpus Christi District100%
Yoakum District100%
Waco District100%
Austin District100%
Urban Infraconstruction LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF166 (38%)$1.05$1.00
Pavement surface preparation for marking (6")678-7002LF156 (40%)$0.40$0.18
Pavement sler 6"666-7347LF115 (45%)$0.42$0.40
Install small roadside sign support and assembly type 10BWG(1)SA(T)644-7004EACH74 (57%)$775.00$825.00
Barricades, signs and traffic handling502-7001MO183 (17%)$7,150.00$5,000.00
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH133 (23%)$798.00$710.00
Reflectorized pavement marker type II-A-A672-7004EACH123 (25%)$7.07$5.00
Reflectorized pavement marking type I (Y)6"(solid)(100MIL)666-7423LF113 (27%)$1.45$0.76
Reflectorized pavement marking type I (W)6"(solid)(100MIL)666-7411LF103 (30%)$1.30$0.75
Constructing detours508-7001SY103 (30%)$134.58$87.00
Reinforced concrete slab (HPC)422-7002SF83 (38%)$32.00$28.00
Trench excavation protection402-7001LF73 (43%)$2.11$10.00
Urban Infraconstruction LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Urban Infraconstruction LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00062075Fort Worth DistrictConstruct Ramps, IH 20 (FM 1884 to SH 171)4 of 7$16,839,039+7.0%
02 JUN 2026A00119468Laredo DistrictConstruct Direct Connectors, IH 35 (0.187 MI SOUTH OF IH 35/US 59 INT. to 0.205 MI NORTH OF IH 35/ US 59 INT.)1 of 6$69,850,000Low, 5.0% under the second
06 MAY 2026A00059994San Antonio DistrictConstruct Ramps, IH 37 (LP 13 to IH 410)4 of 5$34,417,509+4.0%
04 FEB 2026A00045441Dallas DistrictWiden Road - Add Lanes, FM 549 (SH 205 to SH 276)1 of 12$29,812,034Low, 7.0% under the second
05 SEP 2025A00205768Abilene DistrictBridge Replacement, FM 1835 (FM 1835 to @ DOUBLE MOUNTAIN FORK BRAZOS RIVER)4 of 10$4,626,000+19%
07 AUG 2025A00135447Austin DistrictBridge Replacement, US 77 (0.10 MILES SOUTH OF N. JAEGER STREET to NORTH OF INDEPENDENCE STREET)3 of 10$14,375,000+9.0%
02 JUL 2025A00129184Dallas DistrictBridge Replacement, HARRIS (HARRIS RD AT HOG CREEK to .)9 of 10$3,248,850+28%
01 JUL 2025A00064769Dallas DistrictBridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .)11 of 13$3,835,000+23%
05 JUN 2025A00135886Childress DistrictBridge Replacement, COUNTY ROAD 20 (@ Lelia Lake Creek to .)9 of 10$1,355,000+42%
05 JUN 2025A00061098Fort Worth DistrictBridge Replacement, COUNTY ROAD 454 (CR 454 @ Bosque River to .)9 of 9$1,300,000+50%
04 JUN 2025A00187950San Antonio DistrictBridge Replacement, COUNTY ROAD 241 (CR 241 @ Borrego Creek to .)10 of 10$1,510,000+109%
04 JUN 2025A00136607Corpus Christi DistrictBridge Replacement, CR 216 (STR. (AA0156001) Salt Creek to Approx. .70 MI E of SH 72)4 of 7$6,977,000+43%
04 JUN 2025A00130805Yoakum DistrictBridge Replacement, GEBHARD RD (AT HAW CREEK to STR#AA04-89-001)9 of 10$1,868,300+60%
04 JUN 2025A00180852Waco DistrictBridge Replacement, COUNTY ROAD 203 (0.1 Mi S of Leon River to 0.1 Mi N of Leon River)6 of 11$4,604,000+10%
04 JUN 2025A00065080Fort Worth DistrictBridge Replacement, FM 4 (AT WEAVER BRANCH to .)5 of 7$3,180,000+33%
02 MAY 2025A00064833Dallas DistrictBridge Replacement, S BELTLINE RD (BELT LINE ROAD AT GOFF BRANCH to .)6 of 6$10,850,854+33%
02 MAY 2025A00139426Fort Worth DistrictIntersection Improvements With Right And/Or Left Turn Lanes, FM 156 (at Industrial Blvd to .)3 of 7$6,659,390+4.0%
01 MAY 2025A00138707Dallas DistrictBridge Replacement, BI 45F (At Post Oak Creek to .)5 of 10$4,498,921+17%
Urban Infraconstruction LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy