Urban Infraconstruction LLC: TxDOT bid record
Urban Infraconstruction LLC submitted 18 bids on Texas DOT contracts in the data, from 01 MAY 2025 to 06 AUG 2026, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $99,662,033
- Latest bid
- 06 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 14 | 0 | 0% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 5 | 1 | 20% |
| Fort Worth District | 4 | 0 | 0% |
| San Antonio District | 2 | 0 | 0% |
| Laredo District | 1 | 1 | 100% |
| Childress District | 1 | 0 | 0% |
| Abilene District | 1 | 0 | 0% |
| Corpus Christi District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Austin District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 16 | 6 (38%) | $1.05 | $1.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 15 | 6 (40%) | $0.40 | $0.18 |
| Pavement sler 6" | 666-7347 | LF | 11 | 5 (45%) | $0.42 | $0.40 |
| Install small roadside sign support and assembly type 10BWG(1)SA(T) | 644-7004 | EACH | 7 | 4 (57%) | $775.00 | $825.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 18 | 3 (17%) | $7,150.00 | $5,000.00 |
| Install small roadside sign support and assembly type 10BWG(1)SA(P) | 644-7001 | EACH | 13 | 3 (23%) | $798.00 | $710.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 12 | 3 (25%) | $7.07 | $5.00 |
| Reflectorized pavement marking type I (Y)6"(solid)(100MIL) | 666-7423 | LF | 11 | 3 (27%) | $1.45 | $0.76 |
| Reflectorized pavement marking type I (W)6"(solid)(100MIL) | 666-7411 | LF | 10 | 3 (30%) | $1.30 | $0.75 |
| Constructing detours | 508-7001 | SY | 10 | 3 (30%) | $134.58 | $87.00 |
| Reinforced concrete slab (HPC) | 422-7002 | SF | 8 | 3 (38%) | $32.00 | $28.00 |
| Trench excavation protection | 402-7001 | LF | 7 | 3 (43%) | $2.11 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 9 | 7 of 9 |
| C. E. Barker, LTD. | 8 | 4 of 8 |
| STX Civil | 7 | 7 of 7 |
| Grey Sky Construction LLC | 6 | 3 of 6 |
| Talbert Companies LLC | 6 | 6 of 6 |
| Coppell Construction Co., Inc. | 6 | 3 of 6 |
| Altus Construction LLC | 6 | 5 of 6 |
| Ed Bell Construction Company | 5 | 1 of 5 |
| Ragle Construction, Inc. | 5 | 2 of 5 |
| Knife River Corporation - South | 5 | 4 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 AUG 2026 | A00062075 | Fort Worth District | Construct Ramps, IH 20 (FM 1884 to SH 171) | 4 of 7 | $16,839,039 | +7.0% |
| 02 JUN 2026 | A00119468 | Laredo District | Construct Direct Connectors, IH 35 (0.187 MI SOUTH OF IH 35/US 59 INT. to 0.205 MI NORTH OF IH 35/ US 59 INT.) | 1 of 6 | $69,850,000 | Low, 5.0% under the second |
| 06 MAY 2026 | A00059994 | San Antonio District | Construct Ramps, IH 37 (LP 13 to IH 410) | 4 of 5 | $34,417,509 | +4.0% |
| 04 FEB 2026 | A00045441 | Dallas District | Widen Road - Add Lanes, FM 549 (SH 205 to SH 276) | 1 of 12 | $29,812,034 | Low, 7.0% under the second |
| 05 SEP 2025 | A00205768 | Abilene District | Bridge Replacement, FM 1835 (FM 1835 to @ DOUBLE MOUNTAIN FORK BRAZOS RIVER) | 4 of 10 | $4,626,000 | +19% |
| 07 AUG 2025 | A00135447 | Austin District | Bridge Replacement, US 77 (0.10 MILES SOUTH OF N. JAEGER STREET to NORTH OF INDEPENDENCE STREET) | 3 of 10 | $14,375,000 | +9.0% |
| 02 JUL 2025 | A00129184 | Dallas District | Bridge Replacement, HARRIS (HARRIS RD AT HOG CREEK to .) | 9 of 10 | $3,248,850 | +28% |
| 01 JUL 2025 | A00064769 | Dallas District | Bridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .) | 11 of 13 | $3,835,000 | +23% |
| 05 JUN 2025 | A00135886 | Childress District | Bridge Replacement, COUNTY ROAD 20 (@ Lelia Lake Creek to .) | 9 of 10 | $1,355,000 | +42% |
| 05 JUN 2025 | A00061098 | Fort Worth District | Bridge Replacement, COUNTY ROAD 454 (CR 454 @ Bosque River to .) | 9 of 9 | $1,300,000 | +50% |
| 04 JUN 2025 | A00187950 | San Antonio District | Bridge Replacement, COUNTY ROAD 241 (CR 241 @ Borrego Creek to .) | 10 of 10 | $1,510,000 | +109% |
| 04 JUN 2025 | A00136607 | Corpus Christi District | Bridge Replacement, CR 216 (STR. (AA0156001) Salt Creek to Approx. .70 MI E of SH 72) | 4 of 7 | $6,977,000 | +43% |
| 04 JUN 2025 | A00130805 | Yoakum District | Bridge Replacement, GEBHARD RD (AT HAW CREEK to STR#AA04-89-001) | 9 of 10 | $1,868,300 | +60% |
| 04 JUN 2025 | A00180852 | Waco District | Bridge Replacement, COUNTY ROAD 203 (0.1 Mi S of Leon River to 0.1 Mi N of Leon River) | 6 of 11 | $4,604,000 | +10% |
| 04 JUN 2025 | A00065080 | Fort Worth District | Bridge Replacement, FM 4 (AT WEAVER BRANCH to .) | 5 of 7 | $3,180,000 | +33% |
| 02 MAY 2025 | A00064833 | Dallas District | Bridge Replacement, S BELTLINE RD (BELT LINE ROAD AT GOFF BRANCH to .) | 6 of 6 | $10,850,854 | +33% |
| 02 MAY 2025 | A00139426 | Fort Worth District | Intersection Improvements With Right And/Or Left Turn Lanes, FM 156 (at Industrial Blvd to .) | 3 of 7 | $6,659,390 | +4.0% |
| 01 MAY 2025 | A00138707 | Dallas District | Bridge Replacement, BI 45F (At Post Oak Creek to .) | 5 of 10 | $4,498,921 | +17% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.