TxDOT contract A00059994 bid tabulation

Construct Ramps, IH 37 (LP 13 to IH 410). Let by Texas DOT on May 6, 2026, Bexar, San Antonio District. 5 bids received; low bid $33,122,615 by Hunter Industries, LTD., -3.5% against the engineer's estimate of $34,315,721.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
385
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hunter Industries, LTD.$33,122,615Low-3.0%
2Jordan Foster Construction, LLC$33,402,427+1.0%-3.0%
3Capital Excavation Company$34,315,676+4.0%0.0%
4Urban Infraconstruction LLC$34,417,509+4.0%0.0%
5J3 Company, LLC$35,211,397+6.0%+3.0%
TxDOT contract A00059994: bids by rank

Engineer's estimate: $34,315,721.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hunter Industries, LTD.2. Jordan Foster Construction, LLC3. Capital Excavation Company4. Urban Infraconstruction LLC5. J3 Company, LLC
1Preparing row (100-7002)STA112$10,000$4,070.00$7,455.89$2,800.00$6,000.00$8,000.00
2Removing concrete (mowstrip) (104-7003)SY1,388$30.00$19.80$10.20$19.00$19.44$15.00
3Removing concrete (riprap) (104-7006)SY1,676$12.00$23.10$10.20$16.30$19.18$20.00
4Removing concrete (medians) (104-7008)SY5,783$18.00$23.10$6.00$12.95$13.79$20.00
5Removing concrete (driveways) (104-7011)SY215$20.00$26.40$14.00$41.70$19.10$25.00
6Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY1,403$18.00$19.80$8.00$16.30$16.21$15.00
7Removing concrete (curb) (104-7016)LF4,789$5.00$16.50$3.00$14.35$3.86$6.00
8Removing concrete (traffic barrier) (104-7035)LF175$10.00$60.50$25.00$51.45$74.97$25.00
9Remove (18"-22") TRT/untrt base & asphalt pavement (105-7018)SY19,952$10.00$14.55$7.00$10.00$12.88$15.00
10Remove (15") TRT/untrt base & asphalt pavement (105-7035)SY873$8.00$10.99$24.00$39.60$27.58$30.00
11Excavation (roadway) (110-7001)CY28,142$18.00$24.20$21.00$9.00$15.00$30.00
12Embankment (final)(DC)(type C1) (132-7008)CY5,090$16.00$37.47$29.00$54.00$40.00$60.00
13Embankment (final)(OC)(type C2) (132-7009)CY13,729$8.00$37.02$29.00$23.00$45.00$35.00
14Embankment (final)(OC)(type C2)(DS) (132-7039)CY7,348$40.00$65.12$46.00$130.00$58.00$115.00
15Furn & place topsoil (4") (160-7002)SY77,020$1.50$1.93$2.50$3.20$2.20$3.00
16Drill seed (permanent_urban_clay) (164-7012)SY77,020$0.22$0.25$0.25$0.19$0.25$0.25
17Drill seed (temporary_warm_cool) (164-7015)SY75,524$0.20$0.22$0.15$0.19$0.19$0.15
18Vegetative watering (168-7001)TGL2,400$25.00$29.70$30.00$41.05$30.00$20.14
19Soil ret BLKT(SL_mod_clay_long_roll) (169-7010)SY149,838$3.00$2.75$1.50$1.29$2.98$1.45
20Irrigation system (170-7001)LS1$35,000$72,541$75,000$152,535$180,520$145,000
21Mulch (192-7001)CY1,394$85.00$75.36$78.00$53.70$103.00$60.00
22Plant bed preparation (192-7009)SY12,557$9.50$6.14$6.35$6.45$4.00$8.00
23Plant material (15 gal) (tree) (192-7037)EACH498$150.00$224.96$230.00$177.00$315.00$212.00
24Plant material (min 4' TRNK HT)(palm) (192-7063)EACH39$700.00$1,284.13$1,330.00$810.00$1,293.00$767.00
25Landscape establish (193-7001)MO9$3,500.00$5,775.84$6,000.00$7,000.00$3,125.00$5,230.00
26Irrig sys oper and maintenance (193-7007)MO9$3,500.00$3,491.28$3,600.00$4,830.00$2,083.00$2,090.00
27Proof rolling (216-7001)HR19$100.00$121.00$142.00$96.20$328.57$200.00
28FL BS(cip)(type D, GR 1-2 or 5)(final pos) (247-7192)CY8,341$60.00$68.84$85.00$70.00$60.00$65.00
29Lime (com or QK)(slurry) or QK(dry) (260-7001)TON285$350.00$385.00$312.00$370.00$308.00$360.00
30Lime TRT (existing material)(6") (260-7006)SY18,923$4.40$4.40$6.15$5.60$10.31$10.00
31Prime coat(MC-30 or AE-P) (310-7013)GAL8,853$4.50$7.70$3.95$4.05$4.16$5.00
32D-GR HMA type-B PG64-22 (341-7001)TON21,800$95.00$101.20$83.00$85.90$68.63$92.00
33D-GR HMA type D PG70-22 (341-7048)TON1,165$115.00$117.70$84.00$86.65$97.10$105.00
34SP mixes SP-C sac-B PG76-22 (344-7031)TON9,610$95.00$113.30$100.00$104.00$90.49$110.00
35Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001)TON15,182$150.00$169.40$136.00$141.00$127.60$145.00
36Flexible pavement structure repair(6") (351-7005)SY1,172$50.00$55.19$61.00$63.40$35.08$70.00
37Planing asphalt concrete pavement(2") (354-7051)SY50,431$1.80$2.20$1.70$1.74$3.00$2.25
38Planing asphalt concrete pavement (1" to 2") (354-7076)SY3,512$2.10$2.20$3.05$3.15$1.50$4.00
39Planing asphalt concrete pavement (2.5") (354-7082)SY84,987$3.00$2.20$1.80$1.85$2.00$2.50
40Cut & restoring pavement (400-7006)SY99$175.00$238.60$220.00$134.00$69.14$200.00
41Flowable backfill (401-7001)CY194$185.00$326.45$198.00$228.00$200.00$220.00
42Trench excavation protection (402-7001)LF1,800$9.00$45.18$2.30$10.00$2.10$5.00
43Temporary special shoring (403-7001)SF21,393$25.00$1.99$28.00$1.70$29.76$20.00
44Drilled shaft (24 in) (416-7004)LF60$260.00$275.00$220.00$215.00$230.00$240.00
45Drilled shaft (30 in) (416-7005)LF1,980$320.00$218.82$180.00$210.00$179.01$150.00
46Drilled shaft (36 in) (416-7006)LF672$250.00$291.20$290.00$290.00$350.59$180.00
47Drilled shaft (48 in) (416-7008)LF438$270.00$583.89$600.00$530.00$489.66$340.00
48Drilled shaft (non - reinforced) (12 in) (416-7024)LF7$140.00$165.00$165.00$177.00$150.00$185.00
49Drilled shaft (sign mounts) (24 in) (416-7028)LF22$280.00$200.00$220.00$215.00$260.00$300.00
50Drilled shaft (sign mounts) (42 in) (416-7031)LF1,000$360.00$390.00$470.00$480.00$420.00$460.00
51Drilled shaft (high mast pole) (60 in) (416-7037)LF108$900.00$700.00$830.00$750.00$830.00$900.00
52Drilled shaft (traffic signal pole) (24 in) (416-7042)LF24$240.00$200.00$280.00$215.00$270.00$300.00
53Drilled shaft (traffic signal pole) (36 in) (416-7044)LF91$420.00$305.00$390.00$330.00$330.00$410.00
54Drilled shaft (traffic signal pole) (48 in) (416-7046)LF88$570.00$415.00$520.00$450.00$490.00$550.00
55Sound wall (419-7001)SF13,720$55.00$50.65$53.00$52.25$70.00$60.00
56Class C concrete (abutment) (420-7012)CY22.20$1,100.00$1,600.00$2,100.00$2,270.00$1,700.00$1,250.00
57Class C concrete (cap) (420-7022)CY84.90$1,000.00$1,600.00$2,100.00$1,990.00$2,000.00$1,500.00
58Class C concrete (column) (420-7038)CY92.70$1,550.00$1,600.00$2,000.00$1,880.00$1,500.00$1,500.00
59Class C concrete (footing) (420-7044)CY124$1,400.00$1,600.00$1,450.00$2,120.00$1,400.00$1,250.00
60Class C concrete (rail foundation) (420-7052)CY84$500.00$525.66$600.00$900.00$350.00$750.00
61Class C concrete (sign column) (420-7057)CY467$1,200.00$1,800.00$1,350.00$1,100.00$1,000.00$1,400.00
62Class C concrete (collar) (420-7061)EACH14$1,000.00$750.00$1,400.00$980.00$400.00$2,500.00
63Class C concrete (vehicle defl wall) (420-7062)CY217.80$500.00$1,400.00$1,200.00$1,350.00$1,200.00$1,250.00
64Reinforced concrete slab (422-7001)SF7,000$20.00$36.50$36.00$34.75$30.00$45.00
65Approach slab (422-7013)CY51$750.00$800.00$780.00$960.00$600.00$750.00
66Retaining wall (MSE) (423-7001)SF31,007$73.00$53.50$65.00$60.00$63.00$65.00
67Prestressed concrete girder (TX28) (425-7001)LF992$200.00$220.00$210.00$260.00$230.91$250.00
68Riprap (concrete)(4 in) (432-7001)CY169.10$575.00$485.09$500.00$870.00$510.32$550.00
69Riprap (concrete)(CL B) (432-7005)CY24$600.00$520.26$920.00$1,070.00$924.94$600.00
70Riprap (mow strip)(4 in) (432-7013)CY273.60$605.00$583.90$600.00$900.00$963.66$700.00
71Riprap (stone protection)(18 in) (432-7043)CY59$250.00$202.82$450.00$242.00$262.78$275.00
72Cleaning and sealing existing joints (438-7001)LF160$70.00$48.52$39.00$23.70$50.00$55.00
73Rail (type SSTR) (450-7024)LF3,061$70.00$100.00$73.00$90.15$55.00$110.00
74Rail (type C223) (450-7034)LF83$250.00$300.00$340.00$360.00$255.00$300.00
75Rail (handrail)(type E) (450-7062)LF50$200.00$195.15$290.00$246.00$185.86$300.00
76Rail (type SSTR)(mod) (450-7066)LF500$150.00$350.00$188.00$208.00$280.00$200.00
77Retrofit rail (type SSTR) (451-7024)LF1,126$250.00$350.00$380.00$270.00$125.00$220.00
78Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF85$200.00$225.00$300.00$320.00$249.18$220.00
79Header type expansion joint (454-7009)CF34$500.00$492.79$390.00$490.00$300.00$500.00
80Joint sealant (454-7010)LF160$20.00$30.33$24.00$19.20$20.00$40.00
81Concrete box culvert (4 FT X 2 FT)(extend) (462-7058)LF24$700.00$446.18$1,410.00$570.00$489.35$1,500.00
82Concrete box culvert (5 FT X 3 FT)(extend) (462-7062)LF654$900.00$491.37$550.00$600.00$457.80$600.00
83Concrete box culvert (8 FT X 4 FT)(extend) (462-7076)LF838$1,105.00$734.22$750.00$840.00$754.84$800.00
84Concrete box culvert (10 FT X 6 FT)(extend) (462-7089)LF86$1,600.00$1,005.32$1,300.00$1,360.00$977.81$1,800.00
85RC pipe (CL III)(18 in) (464-7003)LF938$90.00$110.70$105.00$117.00$183.76$110.00
86RC pipe (CL III)(24 in) (464-7005)LF473$120.00$129.90$110.00$185.00$179.16$135.00
87Inlet (complete)(pco)(3FT)(left) (465-7014)EACH4$7,500.00$5,083.10$10,000$8,200.00$8,776.27$8,000.00
88Inlet (complete)(pco)(3FT)(right) (465-7015)EACH4$8,500.00$5,083.10$10,000$8,100.00$8,776.27$8,000.00
89Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH1$8,000.00$6,325.63$13,000$5,500.00$6,407.02$8,000.00
90Inlet (complete)(armor curb slot) (465-7335)EACH8$3,000.00$4,758.08$8,000.00$4,840.00$7,280.55$7,500.00
91Inlet(complete)(type MSE1) (465-7362)EACH4$5,000.00$9,079.05$11,000$8,300.00$4,852.02$10,000
92Inlet (complete)(type sidewalk bridge)(mod) (465-7374)EACH15$20,000$21,432$19,000$19,000$23,472$22,500
93Wingwall (FW - 0) (HW=5 FT) (466-7147)EACH1$18,000$11,296$45,000$21,800$44,445$30,000
94Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH1$25,000$33,887$50,000$7,000.00$25,218$30,000
95Wingwall (SW - 0) (HW=10 FT) (mod) (466-7228)EACH1$70,000$46,256$85,000$47,700$88,676$80,000
96Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(C) (467-7069)EACH1$12,000$6,061.31$13,500$18,600$12,717$11,500
97Set (type I)(S= 4 FT)(HW= 4 FT)(4:1)(C) (467-7072)EACH1$13,500$6,569.62$13,500$18,500$12,683$13,500
98Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH5$1,357.00$1,355.49$1,370.00$2,540.00$1,911.00$2,000.00
99Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH1$1,400.00$1,637.89$1,510.00$2,970.00$2,054.90$2,000.00
100Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH2$1,300.00$1,637.89$1,510.00$2,970.00$2,054.88$2,000.00
101Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH1$2,000.00$1,807.32$1,700.00$3,320.00$2,084.92$2,000.00
102Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH4$2,100.00$1,807.32$1,880.00$3,380.00$2,252.45$2,000.00
103Thermoplastic pipe (HDPE) (18") (468-7007)LF42$60.00$110.70$102.00$430.00$215.60$105.00
104Adjusting inlets (cap) (479-7006)EACH4$3,000.00$3,671.12$4,800.00$3,220.00$2,736.07$3,000.00
105Clean existing culverts (480-7001)EACH8$3,700.00$2,823.94$2,600.00$5,300.00$3,424.08$5,000.00
106Pipe (PVC) (schedule 80) (12 in) (481-7030)LF150$150.00$97.14$77.00$155.00$181.97$50.00
107Removing structure (inlet) (496-7002)EACH10$1,000.00$2,823.94$1,580.00$2,090.00$2,035.55$1,000.00
108Removing structure (set) (496-7004)EACH4$800.00$1,411.97$900.00$1,080.00$2,518.19$1,000.00
109Removing structure (wingwall) (496-7005)EACH3$5,000.00$1,411.97$3,100.00$17,100$9,223.02$3,000.00
110Removing structure (headwall) (496-7006)EACH2$5,000.00$1,411.97$2,800.00$5,900.00$4,629.01$3,000.00
111Removing structure (pipe) (496-7007)LF100$20.00$32.76$45.00$21.65$125.00$75.00
112Remove STR (rail) (496-7017)LF129$20.00$25.65$21.00$45.70$63.91$75.00
113Mobilization (500-7001)LS1$3,176,905$2,749,227$3,306,840$2,775,000$2,578,955$3,000,000
114Barricades, signs and traffic handling (502-7001)MO27$15,000$8,382.88$20,500$38,000$29,388$28,000
115Portable changeable message sign (503-7001)DAY12$75.00$150.00$114.00$260.00$144.95$250.00
116Portable changeable message sign (503-7002)EACH3$7,500.00$5,000.00$7,000.00$25,700$12,807$10,000
117TMA (stationary) (505-7001)DAY710$200.00$150.00$360.00$340.00$541.25$150.00
118TMA (mobile operation) (505-7003)DAY14$120.00$750.00$780.00$940.00$1,434.31$1,000.00
119Rock filter dams (install) (type 2) (506-7002)LF1,210$40.00$49.59$43.00$38.65$42.00$40.00
120Rock filter dams (remove) (506-7011)LF1,210$12.00$20.80$7.75$12.90$8.00$8.00
121Construction exits (install) (type 1) (506-7020)SY720$25.00$40.16$20.00$26.85$25.00$20.00
122Construction exits (remove) (506-7024)SY720$5.00$13.10$4.90$12.90$6.00$8.00
123Temporary sediment control fence (install) (506-7039)LF9,050$4.00$4.09$3.25$3.45$3.30$3.25
124Temporary sediment control fence (remove) (506-7041)LF9,050$1.00$1.05$0.25$1.05$0.80$0.75
125Biodegradable erosion control logs (install) (12") (506-7044)LF640$5.30$6.99$6.90$6.45$6.00$5.00
126Biodegradable erosion control logs (remove) (506-7046)LF640$1.00$1.05$1.00$1.05$4.00$0.75
127Constructing detours (508-7001)SY9,261$78.00$105.19$106.00$120.00$121.19$128.00
128Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF11,610$30.00$25.00$35.00$74.50$49.39$25.00
129Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF3,340$20.00$30.00$25.00$18.90$43.41$25.00
130Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF240$35.00$30.00$70.00$18.90$48.65$30.00
131Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF12,260$7.00$11.00$5.85$14.20$11.36$8.00
132Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033)LF6,120$6.00$14.00$10.00$10.30$7.89$8.00
133Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034)LF280$20.00$14.00$20.00$10.30$14.06$10.00
134Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF11,610$10.00$10.00$8.55$31.00$14.52$12.00
135Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF3,340$8.00$10.00$9.30$18.90$20.09$12.00
136Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF240$10.00$10.00$29.00$18.90$29.15$12.00
137Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF50$95.00$350.00$260.00$167.00$245.00$250.00
138Permanent CTB (single slope) (type 3) (42 ) (514-7002)LF125$250.00$350.00$310.00$246.00$265.00$250.00
139Colored textured concrete (4") (527-7001)SY5,595$95.00$83.16$84.00$110.00$154.50$80.00
140Concrete curb (type I) (529-7001)LF12,202$16.00$14.38$14.50$17.05$44.62$15.00
141Intersections (concrete) (530-7001)SY214$140.00$102.68$160.00$206.00$142.90$140.00
142Intersections (ACP) (530-7002)SY205$70.00$72.60$133.00$132.00$82.90$125.00
143Concrete sidewalks (5") (531-7002)SY5,289$75.00$72.76$68.00$86.85$106.53$70.00
144Curb ramps (type 1) (531-7005)EACH10$2,800.00$2,966.00$3,200.00$1,990.00$3,917.29$2,500.00
145Curb ramps (type 2) (531-7006)EACH1$3,200.00$2,656.47$3,200.00$2,940.00$3,919.01$2,500.00
146Curb ramps (type 7) (531-7010)EACH6$2,800.00$2,945.21$3,200.00$1,970.00$3,917.25$2,500.00
147Curb ramps (type 21) (531-7023)SY531$250.00$202.12$108.00$310.00$245.53$200.00
148Metal W-beam guard fence (timber post) (540-7001)LF3,075$25.00$25.80$26.00$27.70$25.80$25.80
149Metal beam guard fence trans (thrie-beam) (540-7005)EACH16$2,250.00$2,406.00$1,910.00$2,050.00$1,906.00$1,906.00
150Downstream anchor terminal section (540-7015)EACH6$1,200.00$1,234.00$1,230.00$1,330.00$1,234.00$1,234.00
151Metal beam guard fence (long span system) (540-7027)EACH1$1,000.00$1,174.00$1,170.00$1,260.00$1,174.00$1,174.00
152Remove metal beam guard fence (542-7001)LF4,029$3.00$2.75$2.75$2.95$2.75$2.75
153Remove terminal anchor section (542-7002)EACH6$220.00$265.00$270.00$280.00$265.00$265.00
154RM metal beam guard fence trans (thrie-beam) (542-7004)EACH12$300.00$234.00$230.00$250.00$234.00$234.00
155Guardrail end treatment (install) (544-7001)EACH9$3,200.00$3,459.00$3,500.00$3,720.00$3,459.00$3,459.00
156Guardrail end treatment (remove) (544-7003)EACH7$300.00$266.00$270.00$290.00$266.00$266.00
157Crash cushion attenuator (move & reset) (545-7002)EACH11$1,500.00$724.00$720.00$780.00$724.00$724.00
158Crash cushion attenuator (remove) (545-7004)EACH5$850.00$677.00$680.00$730.00$677.00$677.00
159Cca (install)(N)(TL3)(work zone) (545-7018)EACH5$7,000.00$7,695.00$7,700.00$8,300.00$7,695.00$7,695.00
160Pipe underdrains (type 6) (6") (556-7006)LF2,701$25.00$37.65$21.00$32.80$51.57$25.00
161Pipe underdrains (type 8) (6") (556-7008)LF6,448$35.00$41.51$22.00$31.65$34.00$25.00
162Remove RD IL asm (trans-base) (610-7009)EACH19$1,000.00$365.00$550.00$390.00$320.00$333.67
163Replace luminaire W/(150W EQ) LED (610-7011)EACH12$600.00$500.00$550.00$540.00$470.00$490.08
164Replace luminaire W/(250W EQ) LED (610-7012)EACH17$700.00$515.00$660.00$550.00$450.00$469.23
165In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH6$1,900.00$1,540.00$2,000.00$1,650.00$1,900.00$1,981.18
166HI MST IL pole (150 FT)( 80 MPH) (613-7005)EACH3$60,000$47,500$56,000$51,024$52,900$55,160
167LED HI MST IL asm(6 fixt) (type A)SHLD (614-7009)EACH3$40,000$43,500$45,000$46,700$47,600$49,634
168Conduit (PVC) (schedule 40) (2") (618-7030)LF8,800$12.00$11.00$9.35$11.80$8.30$8.65
169Conduit (PVC) (schedule 40) (3") (618-7036)LF1,560$20.00$12.00$12.00$12.90$11.00$11.47
170Conduit (PVC) (schedule 40) (3") (concrete encse) (618-7038)LF15,330$25.00$21.00$15.00$22.55$24.00$25.03
171Conduit (PVC) (schedule 80) (2") (618-7054)LF2,315$17.90$11.00$10.50$11.80$14.00$14.60
172Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF4,395$30.00$20.00$31.00$21.50$22.00$22.94
173Conduit (PVC) (schedule 80) (3") (618-7060)LF1,905$22.50$12.00$15.50$12.90$16.00$16.68
174Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF3,945$32.00$23.00$35.00$24.70$27.50$28.68
175Conduit (PVC) (schedule 80) (3") (concrete encse) (618-7063)LF4,030$50.00$22.00$16.50$23.65$26.00$27.11
176Conduit (RM) (2") (618-7078)LF140$50.00$27.00$57.00$29.00$68.00$70.91
177Conduit (RM) (3") (618-7082)LF440$60.00$55.00$61.00$59.10$52.00$54.22
178Conduit (prepare) (618-7090)LF4,530$3.00$1.65$1.10$1.75$1.60$1.67
179Electrical conductor (no.14) insulated (620-7002)LF11,325$1.10$0.95$1.10$1.00$0.90$0.94
180Electrical conductor (no.8) bare (620-7007)LF1,115$1.90$1.75$1.65$1.90$1.65$1.72
181Electrical conductor (no.8) insulated (620-7008)LF3,840$2.10$1.55$1.80$1.65$1.55$1.62
182Electrical conductor (no.6) bare (620-7009)LF6,825$2.30$1.75$2.20$1.90$1.70$1.77
183Electrical conductor (no.6) insulated (620-7010)LF5,125$2.50$1.95$2.30$2.10$2.15$2.24
184Electrical conductor (no.4) bare (620-7011)LF6,780$2.80$2.60$3.30$2.80$2.85$2.97
185Electrical conductor (no.4) insulated (620-7012)LF17,050$3.10$2.80$3.45$3.00$2.90$3.02
186Electrical conductor (no.2) insulated (620-7016)LF7,760$4.90$4.25$4.80$4.55$4.50$4.69
187Tray cable (3 conductor) (12 AWG) (621-7002)LF2,485$3.00$2.35$2.75$2.50$2.55$2.66
188Tray cable (4 conductor) (14 AWG) (621-7005)LF4,900$3.25$3.20$3.70$3.45$3.55$3.70
189ITS GND box(pcast) type 1 (243636)W/aprn (623-7002)EACH31$5,400.00$5,500.00$4,700.00$5,900.00$4,800.00$5,005.10
190ITS GND box(pcast) type 2 (366036)W/aprn (623-7008)EACH2$8,500.00$7,200.00$8,000.00$7,700.00$7,600.00$7,924.74
191Ground box type A (122311) (624-7001)EACH14$1,200.00$965.00$1,100.00$1,040.00$1,000.00$1,042.73
192Ground box type A (122311)W/apron (624-7002)EACH12$1,500.00$965.00$1,570.00$1,040.00$1,300.00$1,355.55
193Ground box type D (162922) (624-7007)EACH1$1,500.00$1,025.00$1,320.00$1,100.00$1,200.00$1,251.27
194Ground box type D (162922)W/apron (624-7008)EACH24$1,800.00$1,100.00$1,960.00$1,180.00$1,600.00$1,668.37
195Remove ground box (624-7013)EACH41$440.00$245.00$880.00$260.00$780.00$813.33
196Timber pole (CL 2) 40 FT (627-7003)EACH70$4,600.00$1,425.00$2,000.00$1,530.00$2,000.00$2,085.46
197Remove electrical services (628-7002)EACH5$790.00$545.00$880.00$590.00$400.00$417.09
198Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009)EACH1$9,700.00$6,000.00$9,500.00$6,400.00$8,060.00$8,404.39
199Elc SRV type A 120/240 100(NS)SS(E)SP(O) (628-7025)EACH1$9,200.00$6,600.00$10,200$7,100.00$8,400.00$8,758.92
200Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156)EACH4$8,400.00$5,100.00$8,500.00$5,500.00$6,400.00$6,673.46
201Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH1$9,000.00$6,600.00$9,800.00$7,100.00$6,700.00$6,986.28
202Elc SRV type T 120/240 000(NS)GS(N)SP(U) (628-7327)EACH1$7,000.00$3,600.00$7,200.00$3,870.00$4,400.00$4,588.00
203Aluminum signs (type A) (636-7001)SF340$45.00$25.00$39.00$26.85$39.00$23.25
204Aluminum signs (type G) (636-7002)SF205$30.00$28.00$43.00$30.10$32.00$43.40
205Aluminum signs (type O) (636-7003)SF6,137$30.00$26.80$39.00$28.80$32.00$33.37
206Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH21$720.00$750.00$620.00$810.00$600.00$600.00
207Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH32$800.00$850.00$670.00$920.00$650.00$650.00
208Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH2$950.00$1,215.00$770.00$1,310.00$750.00$750.00
209Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH14$1,000.00$1,100.00$850.00$1,190.00$825.00$825.00
210Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH2$2,100.00$2,125.00$1,690.00$2,290.00$1,650.00$1,650.00
211In bridge MNT clearance sign assembly(type N) (644-7061)EACH2$2,200.00$2,203.82$2,800.00$2,950.00$2,500.00$2,958.81
212Install small roadside sign support and assembly (rail mount) (644-7063)EACH1$4,500.00$4,565.30$6,200.00$6,400.00$2,200.00$5,713.56
213Remove SM RD SN sup&AM (644-7073)EACH72$115.00$135.39$72.00$78.40$70.00$149.64
214Remove SM RD SN sup&AM (sign only) (644-7075)EACH4$120.00$82.61$51.00$56.00$50.00$50.00
215Install LRSS (struct steel) (647-7001)LB1,381$7.00$8.00$8.80$8.60$6.45$6.73
216Remove lrsa (647-7003)EACH5$1,200.00$500.00$880.00$540.00$530.00$552.65
217Install overhead sign support(30 FT cant)(span only) (650-7034)EACH1$20,000$23,900$25,000$25,700$26,900$28,049
218Install overhead sign support(90 FT BRDG)(span only) (650-7101)EACH1$111,000$87,300$102,000$93,777$98,600$102,813
219Install overhead sign support(100 FT BRDG)(span only) (650-7111)EACH1$115,000$99,300$120,000$106,667$113,378$118,223
220Install overhead sign support(110 FT BRDG)(span only) (650-7121)EACH3$130,000$112,500$139,000$120,847$128,196$133,673
221Install overhead sign support(130 FT BRDG)(span only) (650-7141)EACH1$135,000$142,000$172,000$152,535$157,748$164,488
222Remove overhd sign sup (650-7193)EACH1$15,000$5,500.00$10,500$5,900.00$7,700.00$8,029.01
223Remove overhd sign sup (sign only) (650-7194)EACH12$1,000.00$660.00$1,790.00$1,750.00$440.00$458.80
224Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH39$20.00$25.00$15.50$27.00$15.00$15.00
225Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH35$40.00$43.50$26.00$46.95$25.00$25.00
226Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH11$30.00$25.00$15.50$27.00$15.00$32.65
227Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH21$30.00$43.50$26.00$46.95$25.00$40.81
228Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH9$85.00$105.00$154.00$113.00$150.00$87.06
229Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH69$10.00$32.50$51.00$35.10$50.00$47.61
230Install OM SM RD sign (2-OM-PW)Y (658-7319)EACH2$20.00$32.50$51.00$35.10$50.00$47.62
231Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF6,306$0.30$0.80$0.31$0.85$0.30$0.30
232Work zone pavement marking non-removing (W)6"(DOT) (662-7006)LF387$1.10$2.10$0.31$2.25$0.30$0.30
233Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF25,905$0.25$0.43$0.31$0.45$0.30$0.30
234Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF67$0.80$2.20$1.05$2.40$1.00$1.00
235Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF16,944$0.50$0.60$0.42$0.65$0.40$0.40
236Work zone pavement marking non-removing (W)12"(DOT) (662-7013)LF782$1.79$2.25$2.10$2.45$2.00$2.00
237Work zone pavement marking non-removing (W)12"(solid) (662-7015)LF2,027$3.00$2.35$2.60$2.55$2.50$2.50
238Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF1,902$4.00$4.75$3.40$5.15$3.25$3.25
239Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH67$88.00$82.00$104.00$88.55$100.00$100.00
240Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH5$100.00$95.00$156.00$103.00$150.00$150.00
241Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH4$125.00$115.00$156.00$124.00$150.00$150.00
242Work zone pavement marking non-removing(W)(word) (662-7030)EACH45$95.00$95.00$104.00$103.00$100.00$100.00
243Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF20,375$0.30$0.30$0.37$0.30$0.35$0.35
244Work zone pavement marking removing (W)6"(broken) (662-7065)LF3,191$1.00$0.95$1.55$1.05$1.50$1.50
245Work zone pavement marking removing (W)6"(DOT) (662-7066)LF32$1.90$2.15$2.10$2.30$2.00$2.00
246Work zone pavement marking removing (W)6"(solid) (662-7068)LF26,110$0.75$0.75$0.99$0.80$0.95$0.95
247Work zone pavement marking removing (W)8"(solid) (662-7072)LF2,234$1.40$1.50$1.30$1.60$1.25$1.25
248Work zone pavement marking removing (W)12"(solid) (662-7075)LF337$5.00$3.25$6.25$3.50$6.00$6.00
249Work zone pavement marking removing (W)24"(solid) (662-7077)LF183$7.00$5.35$12.50$5.80$12.00$12.00
250Work zone pavement marking removing (W)(arrow) (662-7082)EACH10$180.00$135.00$156.00$146.00$150.00$150.00
251Work zone pavement marking removing (W)(word) (662-7092)EACH9$250.00$160.00$156.00$173.00$150.00$150.00
252Work zone pavement marking removing (W)36"(yld tri) (662-7094)EACH37$80.00$57.00$15.50$61.55$15.00$15.00
253Work zone pavement marking removing (Y)6"(solid) (662-7100)LF22,448$0.80$0.75$0.99$0.80$0.95$0.95
254Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH3,187$0.90$1.72$2.80$9.95$2.00$2.00
255Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH1,693$1.40$1.72$2.80$9.95$2.00$2.00
256Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF374$1.20$1.67$2.10$1.80$2.00$2.00
257Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF65$2.00$1.85$2.10$2.00$2.00$2.00
258Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF16,459$0.90$0.95$0.99$1.05$0.95$0.95
259Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF759$1.40$1.85$2.35$2.00$2.25$2.25
260Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF2,925$3.50$3.85$3.15$4.15$3.00$3.00
261Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,837$7.00$7.65$6.25$8.25$6.00$6.00
262Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH69$150.00$135.00$156.00$146.00$150.00$150.00
263Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH6$200.00$190.00$260.00$205.00$250.00$250.00
264Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH5$250.00$200.00$310.00$216.00$300.00$300.00
265Reflectorized pavement marking type I (W)(number)(100MIL) (666-7063)EACH3$200.00$280.00$260.00$300.00$250.00$250.00
266Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH47$190.00$160.00$210.00$173.00$200.00$200.00
267Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF113$3.00$3.85$3.15$4.15$3.00$3.00
268Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF29,789$0.65$0.93$0.94$1.00$0.90$0.90
269Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF30,014$0.65$0.93$0.94$1.00$0.90$0.90
270Pavement sler 6" (666-7347)LF73,655$0.20$0.22$0.37$0.24$0.35$0.35
271Pavement sler 8" (666-7348)LF16,524$0.40$0.37$0.47$0.40$0.45$0.45
272Pavement sler 12" (666-7350)LF3,797$1.30$0.88$1.55$0.95$1.50$1.50
273Pavement sler 24" (666-7352)LF1,837$2.50$2.60$3.15$2.80$3.00$3.00
274Pavement sler (arrow) (666-7353)EACH69$40.00$25.00$78.00$27.00$75.00$75.00
275Pavement sler (word) (666-7354)EACH47$50.00$32.00$78.00$34.55$75.00$75.00
276Pavement sler (double arrow) (666-7356)EACH6$60.00$38.00$104.00$41.05$100.00$100.00
277Pavement sler (uturn arrow) (666-7358)EACH5$60.00$40.00$104.00$43.20$100.00$100.00
278Pavement sler (symbol) (666-7363)EACH2$60.00$95.00$260.00$103.00$250.00$250.00
279Pavement sler (number) (666-7367)EACH3$100.00$11.00$78.00$11.90$75.00$75.00
280Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF8,729$0.57$0.70$0.63$0.75$0.60$0.60
281Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF4,749$0.55$0.64$0.63$0.70$0.60$0.60
282Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF4,560$0.49$0.64$0.63$0.70$0.60$0.60
283Prefabricated PM type C (multi)(shield) (668-7135)EACH2$2,500.00$3,300.00$3,100.00$3,560.00$3,000.00$3,000.00
284Reflectorized pavement marker type I-C (672-7002)EACH24$3.50$5.00$4.70$5.40$4.50$4.50
285Reflectorized pavement marker type II-A-A (672-7004)EACH6$3.50$5.00$4.70$5.40$4.50$4.50
286Reflectorized pavement marker type II-C-R (672-7006)EACH1,171$4.20$5.00$4.70$5.40$4.50$4.50
287Eliminating existing PM & markers (4") (677-7001)LF11,240$0.20$0.85$0.61$0.90$0.58$0.58
288Eliminating existing PM & markers (8") (677-7004)LF4,644$0.90$1.40$0.83$1.50$0.80$0.80
289Eliminating existing PM & markers (12") (677-7006)LF302$1.50$2.00$3.15$2.15$3.00$3.00
290Eliminating existing PM & markers (24") (677-7008)LF74$2.50$2.75$6.25$2.95$6.00$6.00
291Eliminating existing PM & markers (arrow) (677-7009)EACH3$70.00$40.00$156.00$43.20$150.00$150.00
292Eliminating existing PM & markers (word) (677-7015)EACH2$75.00$45.00$156.00$48.60$150.00$150.00
293Pavement surface preparation for marking (6") (678-7002)LF73,655$0.08$0.05$0.02$0.05$0.02$0.02
294Pavement surface preparation for marking (8") (678-7004)LF16,524$0.15$0.05$0.04$0.05$0.04$0.04
295Pavement surface preparation for marking (12") (678-7006)LF3,797$0.40$0.30$0.21$0.30$0.20$0.20
296Pavement surface preparation for marking (24") (678-7008)LF1,837$1.00$0.50$0.26$0.55$0.25$0.25
297Pavement surface preparation for marking (arrow) (678-7009)EACH69$26.00$11.00$10.50$11.90$10.00$10.00
298Pavement surface preparation for marking (double arrow) (678-7010)EACH6$30.00$15.00$21.00$16.20$20.00$20.00
299Pavement surface preparation for marking (uturn arr) (678-7012)EACH5$15.00$20.00$21.00$21.60$20.00$20.00
300Pavement surface preparation for marking (number) (678-7015)EACH3$15.00$15.00$21.00$16.20$20.00$20.00
301Pavement surface preparation for marking (word) (678-7016)EACH47$20.00$15.00$21.00$16.20$20.00$20.00
302Pavement surface preparation for marking (shield) (678-7025)EACH2$90.00$50.00$21.00$54.00$20.00$20.00
303Install highway traffic signal (system) (680-7003)EACH2$40,000$59,000$64,000$63,377$1,900.00$1,981.19
304Install highway traffic signal (upgrade) (680-7011)EACH1$7,500.00$7,200.00$13,800$7,700.00$1,900.00$1,981.18
305Removing traffic signals (diamond) (680-7012)EACH1$19,100$6,900.00$16,500$7,400.00$6,100.00$6,360.64
306Temporary traffic signals (681-7001)EACH8$77,500$31,600$28,000$33,900$47,200$49,217
307Vehicle signal section (12")LED(green) (682-7001)EACH10$325.00$265.00$360.00$280.00$310.00$323.25
308Vehicle signal section (12")LED(green arrow) (682-7002)EACH42$335.00$265.00$360.00$280.00$310.00$323.25
309Vehicle signal section (12")LED(yel) (682-7003)EACH10$325.00$265.00$360.00$280.00$310.00$323.25
310Vehicle signal section (12")LED(yel arrow) (682-7004)EACH42$335.00$265.00$360.00$280.00$310.00$323.25
311Vehicle signal section (12")LED(red) (682-7005)EACH10$325.00$265.00$360.00$280.00$310.00$323.25
312Vehicle signal section (12")LED(red arrow) (682-7006)EACH41$340.00$265.00$360.00$280.00$310.00$323.25
313Pedestrian signal section (LED)(countdown) (682-7018)EACH20$830.00$720.00$790.00$770.00$760.00$792.47
314Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH49$180.00$150.00$193.00$161.00$160.00$166.84
315Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH2$250.00$215.00$250.00$231.00$230.00$239.83
316Traffic signal CBL (type A)(12 AWG)(9 conductor) (684-7014)LF20,845$5.50$4.80$5.75$5.15$5.35$5.58
317Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029)LF8,815$2.85$1.75$2.20$1.90$1.65$1.72
318Traffic signal CBL (type A)(14 AWG)(4 conductor) (684-7030)LF760$2.20$2.00$2.40$2.15$2.10$2.19
319Ins traffic signal PL AM(S)1 arm(44')ilsn (686-7046)EACH2$19,500$15,000$17,400$16,100$15,900$16,579
320Ins traffic signal PL AM(S)1 arm(44')lum&ilsn (686-7048)EACH1$21,000$16,800$19,700$18,000$17,800$18,561
321Ins traffic signal PL AM(S)1 arm(48')ilsn (686-7050)EACH2$19,500$17,100$18,400$18,400$16,600$17,309
322Ins traffic signal PL AM(S)1 arm(48')lum&ilsn (686-7052)EACH2$20,050$18,900$20,000$20,300$18,400$19,186
323Ins traffic signal PL AM(S)1 arm(55')ilsn (686-7058)EACH1$37,000$38,100$42,000$40,900$37,600$39,207
324Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060)EACH2$50,000$39,300$43,000$42,200$38,000$39,624
325Ins traffic signal PL AM(S)1 arm(65')lum&ilsn (686-7068)EACH1$52,000$40,100$45,000$43,100$39,700$41,396
326Pedestrian pole assembly (687-7001)EACH30$3,100.00$2,300.00$1,490.00$2,470.00$1,300.00$1,355.55
327Remove pedestrian pole assembly (687-7005)EACH5$1,050.00$245.00$990.00$260.00$99.00$103.23
328Pedestrian detect push button (APS) (688-7001)EACH20$1,100.00$1,030.00$1,020.00$1,110.00$910.00$948.88
329Pedestrian detector controller unit (688-7003)EACH2$3,500.00$2,710.00$4,200.00$2,910.00$3,600.00$3,753.82
330Removal of conduit (690-7001)LF1,630$3.00$2.30$3.30$2.45$7.55$7.87
331Removal of ground boxes (690-7006)EACH16$220.00$245.00$220.00$260.00$110.00$114.70
332Removal of cables (690-7009)LF35,035$1.10$0.50$1.40$0.55$0.65$0.68
333Removal of timber poles (690-7021)EACH69$1,010.00$245.00$440.00$260.00$330.00$344.10
334Removal of signal head assembly (690-7024)EACH33$100.00$245.00$55.00$260.00$36.00$37.54
335Removal of signal related signs (690-7027)EACH14$75.00$245.00$55.00$260.00$31.00$32.32
336Removal of pedestrian push buttons (690-7030)EACH18$50.00$40.00$110.00$42.95$18.00$18.77
337Removal of traffic signal pole FND (690-7033)LF16$400.00$2,825.00$390.00$3,030.00$250.00$364.96
338Removal of control cabinet(GRND MNT) (690-7038)EACH1$1,150.00$245.00$880.00$260.00$410.00$427.52
339Removal of signal pole assembly (690-7051)EACH8$1,840.00$900.00$1,320.00$970.00$320.00$333.67
340Remove radar vehicle detection system (690-7136)EACH3$500.00$245.00$550.00$260.00$160.00$166.84
341Replace transformer base cover (690-7198)EACH17$100.00$200.00$330.00$215.00$390.00$406.66
342Replace breakaway fuse holder (690-7220)EACH17$200.00$202.00$220.00$215.00$200.00$208.55
343Full - width mowing (730-7019)CYC10$6,000.00$6,824.94$4,400.00$5,200.00$5,574.22$6,000.00
344Litter removal (734-7002)CYC54$2,900.00$2,357.37$1,260.00$530.00$2,738.92$3,250.00
345Debris removing-CNTR med/MN LNS/ramps (735-7001)MI54$150.00$589.34$3,250.00$1,030.00$2,468.29$1,500.00
346Cleaning / sweeping (outside main lane) (738-7028)CYC27$5,000.00$3,969.93$1,680.00$1,470.00$1,600.00$2,000.00
347Cleaning / sweeping (frontage road) (738-7050)CYC27$5,000.00$2,977.45$2,100.00$184.00$1,600.00$2,500.00
348Cleaning / sweeping(entrance/exit ramp) (738-7071)CYC27$2,500.00$1,984.96$1,680.00$184.00$1,600.00$2,500.00
349Anti-graffiti coating (permnent-type II) (740-7005)SF51,987$1.00$0.81$0.77$0.84$0.87$1.00
350Underseal course (3006-7001)GAL28,999$3.70$4.84$3.95$4.05$3.40$4.50
351Bonding course (3007-7001)GAL4,519$2.90$3.52$3.55$3.45$3.17$5.00
352Install bridge identification numbers (4019-7001)EACH5$500.00$549.48$350.00$280.00$300.00$500.00
353Ilsn (8D) (6001-7004)EACH11$4,250.00$5,700.00$4,700.00$217.00$3,300.00$3,441.00
354Install DMS (foundation MTD cabinet) (6004-7002)EACH2$18,020$20,000$14,300$21,500$19,200$20,020
355ITS RVSD (data collect & wwa) sys (6010-7001)EACH1$13,900$17,100$15,900$18,400$12,500$13,034
356Remove ITS RSVD (DC only) (6010-7003)EACH2$500.00$245.00$550.00$260.00$380.00$396.24
357ITS pole MNT cab (type 1)(conf 2) (6011-7017)EACH2$6,400.00$6,500.00$5,800.00$7,000.00$5,100.00$5,317.92
358Ground box (prepare) (6013-7006)EACH4$440.00$290.00$880.00$310.00$230.00$239.83
359CCTV field equipment (digital) (6018-7002)EACH2$8,000.00$8,000.00$1,650.00$8,600.00$1,700.00$1,772.64
360Remove CCTV field equipment (6018-7008)EACH2$2,000.00$245.00$550.00$260.00$430.00$448.38
361Fiber optic CBL (single-mode)(12 fiber) (6027-7001)LF9,185$4.50$4.80$2.20$5.15$3.20$3.34
362Fiber optic patch panel (12 position) (6027-7005)EACH8$1,450.00$2,752.00$940.00$2,960.00$1,000.00$1,042.73
363Fiber optic CBL(single-mode)(144 fiber) (6027-7006)LF11,080$4.00$6.20$3.85$6.65$7.65$7.98
364Fiber optic patch panel (36 positions) (6027-7007)EACH1$3,300.00$6,400.00$1,980.00$6,900.00$1,300.00$1,355.55
365Fiber optic patch panel (144 positions) (6027-7008)EACH1$8,600.00$25,000$6,300.00$26,900$2,300.00$2,398.28
366Fiber optic CBL (SNGL-mode)(48 fiber) (6027-7013)LF70$6.00$6.25$5.50$6.70$400.00$417.09
367Fiber optic CBL (48 SMF)(aerial) (6027-7016)LF9,690$20.00$6.80$4.40$7.30$10.00$10.43
368Remove fiber optic cable (6027-7018)LF48,400$1.45$3.00$1.10$3.20$0.95$0.99
369Ethernet switch (install only) (6036-7001)EACH7$1,010.00$275.00$830.00$300.00$400.00$417.09
370Install wrong way driver detection sys (6038-7001)EACH2$62,500$61,100$71,000$65,633$48,500$50,572
371Remove wrong way driver detection sys (6038-7003)EACH1$5,000.00$485.00$1,980.00$520.00$630.00$656.92
372Remove existing GND MT comm cabinet (6050-7002)EACH3$4,090.00$2,900.00$2,200.00$3,120.00$200.00$208.55
373Install GND MT comm cabinet foundation (6050-7003)EACH1$5,630.00$7,800.00$4,600.00$8,400.00$4,500.00$4,692.28
374ITS GRND MNT cab (type 4) (conf 1) (6050-7007)EACH1$19,000$7,425.00$11,700$8,000.00$40,600$42,335
375ITS GRND MNT cab (type 6)(conf 2) (6050-7009)EACH2$21,000$13,220$17,200$14,200$29,000$30,239
376Remove DMS (6054-7003)EACH2$10,000$2,500.00$6,100.00$2,690.00$4,000.00$4,170.92
377Remove existing fiber hub (6080-7002)EACH1$9,700.00$4,825.00$8,300.00$5,200.00$1,000.00$1,042.73
378LCS signal unit (remove) (6095-7001)EACH2$490.00$2,025.00$550.00$2,180.00$1,400.00$1,459.82
379Feds processor unit (6100-7001)EACH2$28,000$15,245$21,000$16,400$15,200$15,849
380Feds fish eye camera assembly (6100-7002)EACH6$5,500.00$3,965.00$6,800.00$4,260.00$3,800.00$3,962.37
381Lifetime feds data collect & reporting (6100-7004)EACH2$800.00$11,525$13,100$12,400$11,400$11,887
382Fed ethernet repeater (6100-7005)EACH2$1,500.00$1,565.00$3,000.00$1,680.00$1,500.00$1,564.10
383Feds comm cable (ethernet - CAT5E) (6100-7006)LF2,600$0.25$1.60$3.30$1.70$1.40$1.46
384Temporary travel time system (2 sys) (6105-7001)DAY191$50.00$425.00$55.00$211.00$750.00$350.00
385Existing manhole adjustments (7041-7002)EACH1$5,000.00$5,000.00$8,200.00$1,680.00$1,342.48$3,500.00
TxDOT contract A00059994: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy