TxDOT contract A00139426 bid tabulation

Intersection Improvements With Right And/Or Left Turn Lanes, FM 156 (at Industrial Blvd to .). Let by Texas DOT on May 2, 2025, Tarrant, Fort Worth District. 7 bids received; low bid $6,426,835 by Grey Sky Construction LLC, +7.1% against the engineer's estimate of $6,000,822.

Owner
Texas DOT
Letting
02 MAY 2025
Pay items
144
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Grey Sky Construction LLC$6,426,835Low+7.0%
2O. Trevino Construction, LLC$6,622,014+3.0%+10%
3Urban Infraconstruction LLC$6,659,390+4.0%+11%
4Ragle Construction, Inc.$6,687,688+4.0%+11%
5Ed Bell Construction Company$6,848,037+7.0%+14%
6Xit Paving and Construction Inc.$7,191,761+12%+20%
7Jagoe-Public Company$7,266,812+13%+21%
TxDOT contract A00139426: bids by rank

Engineer's estimate: $6,000,822.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Grey Sky Construction LLC2. O. Trevino Construction, LLC3. Urban Infraconstruction LLC4. Ragle Construction, Inc.5. Ed Bell Construction Company6. Xit Paving and Construction Inc.
1Preparing row (100-7002)STA2$24,000$250,000$10,350$20,000$291,400$100,000$68,000
2Preparation row (tree remove) (12"-24" diameter) (100-7004)EACH26$700.00$1,000.00$600.00$1,500.00$260.00$300.00$287.00
3Preparation row (tree remove) (24"-36" diameter) (100-7005)EACH2$800.00$5,000.00$3,500.00$2,500.00$1,800.00$2,250.00$1,990.00
4Removing concrete (pavement) (104-7001)SY2,580$52.00$20.00$32.00$20.00$21.00$21.00$36.00
5Removing concrete (pavers) (104-7010)SY12$100.00$50.00$50.00$90.00$96.00$75.00$67.00
6Removing concrete (driveways) (104-7011)SY1,340$22.00$20.00$27.00$22.00$16.00$21.00$31.00
7Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY81$64.00$30.00$25.00$18.00$27.00$73.50$15.00
8Removing concrete (curb) (104-7016)LF2,428$29.50$20.00$4.00$8.00$2.30$5.25$6.00
9Removing concrete (sawcut) (104-7020)LF1,039$25.00$30.00$3.00$14.00$3.20$10.50$10.00
10Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY4,805$18.50$20.00$12.50$10.00$7.40$6.30$12.00
11Excavation (roadway) (110-7001)CY6,329$58.75$20.00$35.00$53.00$41.10$21.00$38.00
12Embankment (final)(OC)(type C) (132-7005)CY215$44.50$50.00$135.00$85.00$415.00$73.50$60.00
13Block sodding (162-7002)SY7,538$22.00$10.00$6.00$5.00$12.00$4.63$5.00
14Drill seed (temporary_warm) (164-7013)SY3,769$0.15$1.00$0.50$0.60$0.37$0.58$0.50
15Drill seed (temporary_cool) (164-7014)SY3,769$0.15$1.00$0.50$0.60$0.38$0.58$0.50
16Vegetative watering (168-7001)TGL264$50.00$20.00$100.00$59.00$55.00$73.50$65.00
17Lime (com or QK)(slurry) or QK(dry) (260-7001)TON194$425.00$400.00$336.00$350.00$310.00$375.00$400.00
18Lime TRT (existing material)(8") (260-7007)SY11,593$6.80$12.00$15.00$11.50$7.80$10.00$30.00
19Prime coat (MC-30) (310-7004)GAL2,319$8.29$10.00$32.00$33.00$10.25$29.68$19.00
20D-GR HMA type-B PG64-22 (341-7001)TON3,999$133.47$170.00$186.00$182.00$119.00$178.50$201.00
21Tack coat (341-7082)GAL2,087$21.42$10.00$2.00$2.00$10.75$1.50$7.00
22Concrete pavement (CRCP) (8") (360-7002)SY7,600$147.00$110.00$120.00$100.00$79.25$125.00$135.00
23Concrete pavement (CRCP)(hes) (8") (360-7047)SY3,341$85.00$125.00$135.00$150.00$90.50$165.00$176.00
24Drilled shaft (traffic signal pole) (36 in) (416-7044)LF52$730.00$450.00$700.00$1,200.00$590.00$483.04$354.00
25RC pipe (CL III)(30 in) (464-7007)LF55$140.50$150.00$275.00$230.00$182.00$300.00$249.00
26RC pipe (CL III)(36 in) (464-7009)LF48$222.00$175.00$325.00$310.00$243.00$360.00$307.00
27Inlet (complete)(AD)(3FT X 3FT)(FTW) (465-7234)EACH3$12,500$12,500$8,500.00$110.00$6,750.00$15,750$8,846.00
28Manh (complete)(type SD)(7'X 5'-3'X 3')(FTW) (465-7271)EACH1$14,000$15,000$35,000$26,000$6,800.00$17,850$10,505
29Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH1$3,775.00$6,500.00$6,000.00$5,100.00$2,650.00$3,000.00$13,269
30Removing structure (headwall) (496-7006)EACH1$1,835.00$2,500.00$500.00$2,500.00$1,300.00$3,000.00$2,211.00
31Mobilization (500-7001)LS1$534,857$600,000$660,000$600,000$680,000$685,000$400,000
32Barricades, signs and traffic handling (502-7001)MO19$9,500.00$8,500.00$25,000$20,000$35,500$26,250$12,400
33Portable changeable message sign (503-7002)EACH4$11,000$20,000$12,500$37,000$20,000$10,000$15,480
34TMA (stationary) (505-7001)DAY330$250.00$250.00$180.00$225.00$276.00$157.50$374.00
35Rock filter dams (install) (type 2) (506-7002)LF30$42.50$30.00$45.00$84.00$53.00$74.20$82.00
36Rock filter dams (remove) (506-7011)LF30$17.00$15.00$20.00$18.00$25.00$37.10$17.00
37Construction exits (install) (type 1) (506-7020)SY116$33.00$40.00$45.00$40.00$35.00$31.80$38.00
38Construction exits (remove) (506-7024)SY116$13.10$20.00$15.00$14.00$12.00$17.49$13.00
39Temporary sediment control fence (install) (506-7039)LF985$4.00$4.00$5.00$5.00$3.50$2.92$5.00
40Temporary sediment control fence (remove) (506-7041)LF985$1.25$2.00$1.50$1.00$1.20$1.33$1.00
41Constructing detours (508-7001)SY1,408$130.00$50.00$100.00$150.00$300.00$150.00$350.00
42Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF140$70.00$100.00$112.00$95.00$45.50$75.00$63.00
43Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF140$25.00$22.00$25.00$25.00$20.00$50.00$59.00
44Concrete curb (mono) (type II) (529-7007)LF5,127$16.00$14.00$10.00$8.00$5.50$10.00$6.00
45Driveways (concrete) (530-7006)SY1,188$128.00$85.00$130.00$105.00$91.00$180.00$153.00
46Concrete sidewalks (4") (531-7001)SY202$140.00$65.00$115.00$75.00$74.50$95.00$98.00
47Concrete sidewalks (6") (531-7003)SY560$158.00$85.00$110.00$85.00$69.00$115.00$135.00
48Curb ramps (type 1) (531-7005)EACH3$3,550.00$3,850.00$4,000.00$2,000.00$2,100.00$3,000.00$2,184.00
49Curb ramps (type 5) (531-7008)EACH1$4,150.00$3,850.00$9,000.00$3,300.00$8,100.00$6,000.00$4,436.00
50Curb ramps (type 21) (531-7013)EACH2$4,250.00$3,850.00$4,500.00$2,300.00$2,400.00$3,000.00$2,184.00
51Curb ramps (type 22) (531-7014)EACH3$5,325.00$3,850.00$5,200.00$3,300.00$3,200.00$6,000.00$3,802.00
52Conduit (PVC) (schedule 40) (2") (618-7030)LF25$25.90$25.00$18.00$35.00$16.25$27.67$13.00
53Conduit (PVC) (schedule 40) (3") (618-7036)LF102$27.00$35.00$25.00$40.00$21.75$27.98$17.00
54Conduit (PVC) (schedule 40) (4") (618-7040)LF12$33.25$45.00$42.00$42.00$38.00$34.45$21.00
55Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF571$60.00$80.00$41.00$65.00$37.25$40.28$31.00
56Electrical conductor (no.6) bare (620-7009)LF701$3.25$3.00$2.75$4.50$2.25$3.50$3.00
57Electrical conductor (no.6) insulated (620-7010)LF32$3.50$3.00$3.50$4.50$3.00$5.72$4.00
58Tray cable (4 conductor) (12 AWG) (621-7006)LF821$3.00$3.00$3.75$4.50$3.25$5.09$2.00
59Ground box type D (162922) (624-7007)EACH3$1,690.00$1,500.00$2,500.00$2,100.00$1,870.00$1,864.86$1,437.00
60Ground box type D (162922)W/apron (624-7008)EACH4$2,500.00$1,500.00$2,500.00$3,100.00$2,000.00$2,186.78$1,659.00
61Remove ground box (624-7013)EACH5$520.00$500.00$350.00$725.00$320.00$469.58$553.00
62Elc SRV type D 120/240 070(NS)SS(E)SP(O) (628-7191)EACH1$11,000$12,500$10,000$15,200$8,785.00$11,202$6,491.00
63Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH13$800.00$1,150.00$900.00$695.00$790.00$689.00$503.00
64Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH15$900.00$1,150.00$1,500.00$820.00$1,320.00$779.10$719.00
65Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017)EACH2$1,400.00$1,150.00$2,000.00$1,660.00$1,695.00$1,431.00$995.00
66Remove SM RD SN sup&AM (644-7073)EACH21$157.00$500.00$250.00$90.00$215.00$106.00$332.00
67Work zone pavement marking removing (W)4"(broken) (662-7061)LF1,210$1.95$2.00$1.00$2.15$1.50$2.12$2.00
68Work zone pavement marking removing (W)4"(solid) (662-7064)LF15,450$1.35$2.00$1.00$1.60$1.25$1.59$1.00
69Work zone pavement marking removing (W)24"(solid) (662-7077)LF188$6.60$20.00$7.00$7.00$7.00$13.99$6.00
70Work zone pavement marking removing (W)(arrow) (662-7082)EACH20$220.00$250.00$350.00$70.00$175.00$302.10$55.00
71Work zone pavement marking removing (W)(double arrow) (662-7083)EACH18$146.00$500.00$510.00$98.00$325.00$424.00$76.00
72Work zone pavement marking removing (W)(TPL arrow) (662-7090)EACH2$130.00$500.00$510.00$142.00$475.00$673.10$111.00
73Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF130$3.50$6.00$2.25$2.85$2.00$3.18$2.00
74Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF648$2.00$6.00$1.10$1.75$1.50$2.12$1.00
75Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF1,653$5.00$6.00$4.50$4.75$3.50$4.24$4.00
76Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF234$11.50$20.00$8.00$11.40$7.00$10.60$9.00
77Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH5$190.00$250.00$160.00$250.00$200.00$212.00$188.00
78Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH6$215.00$250.00$200.00$250.00$250.00$371.00$194.00
79Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF96$4.00$6.00$4.50$5.00$3.50$4.24$4.00
80Pavement sler 6" (666-7347)LF10,964$0.50$1.00$0.25$0.14$0.20$0.48$0.25
81Pavement sler 8" (666-7348)LF778$10.00$3.00$0.35$0.17$0.20$0.69$0.25
82Pavement sler 12" (666-7350)LF1,749$0.50$6.00$1.00$0.80$0.40$1.06$0.50
83Pavement sler 24" (666-7352)LF234$55.00$20.00$2.00$1.50$0.80$2.12$1.00
84Pavement sler (arrow) (666-7353)EACH5$45.00$250.00$31.00$26.00$20.00$63.60$20.00
85Pavement sler (word) (666-7354)EACH6$45.00$250.00$37.00$26.00$20.00$74.20$20.00
86Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF1,768$1.75$3.00$0.90$1.40$0.80$1.86$1.00
87Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF5,889$2.50$3.00$0.90$1.10$0.70$1.59$0.75
88Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF3,307$3.50$3.00$0.90$1.10$0.70$1.59$0.75
89Reflectorized pavement marker type II-C-R (672-7006)EACH111$7.00$6.00$6.00$5.70$5.00$7.42$4.00
90Pavement surface preparation for marking (6") (678-7002)LF10,964$0.70$3.00$0.05$0.40$0.05$0.37$0.25
91Pavement surface preparation for marking (8") (678-7004)LF778$0.75$6.00$0.10$0.40$0.07$0.58$0.25
92Pavement surface preparation for marking (12") (678-7006)LF1,749$1.75$6.00$0.30$0.60$0.15$0.80$0.50
93Pavement surface preparation for marking (24") (678-7008)LF234$1.75$20.00$0.55$1.50$0.30$1.86$1.00
94Pavement surface preparation for marking (arrow) (678-7009)EACH5$40.00$250.00$13.00$21.00$10.00$53.00$17.00
95Pavement surface preparation for marking (word) (678-7016)EACH6$40.00$250.00$16.00$21.00$10.00$63.60$17.00
96Install highway traffic signal (isolated) (680-7002)EACH1$55,000$350,000$55,000$50,000$42,768$55,004$35,384
97Removing traffic signals (680-7004)EACH1$14,000$15,000$25,000$100,000$135,000$9,390.96$13,269
98Temporary traffic signals (681-7001)EACH1$82,000$160,000$100,000$150,000$153,000$144,030$149,275
99Vehicle signal section (12")LED(green) (682-7001)EACH10$575.00$350.00$400.00$520.00$360.00$456.22$326.00
100Vehicle signal section (12")LED(green arrow) (682-7002)EACH4$605.00$350.00$400.00$520.00$360.00$456.23$331.00
101Vehicle signal section (12")LED(yel) (682-7003)EACH10$595.00$350.00$400.00$520.00$360.00$456.22$326.00
102Vehicle signal section (12")LED(yel arrow) (682-7004)EACH8$590.00$350.00$400.00$520.00$360.00$456.22$331.00
103Vehicle signal section (12")LED(red) (682-7005)EACH10$1,000.00$350.00$400.00$520.00$360.00$456.22$326.00
104Vehicle signal section (12")LED(red arrow) (682-7006)EACH4$590.00$350.00$400.00$520.00$360.00$456.23$331.00
105Pedestrian signal section (LED)(countdown) (682-7018)EACH8$1,500.00$6,500.00$800.00$920.00$730.00$724.51$369.00
106Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH10$255.00$350.00$330.00$260.00$300.00$228.11$108.00
107Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH4$310.00$350.00$330.00$360.00$300.00$300.51$170.00
108Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF1,256$4.65$3.00$3.50$4.00$3.00$3.39$3.00
109Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042)LF741$7.90$3.00$6.50$7.75$6.00$7.00$3.00
110Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF1,538$3.00$3.00$2.25$3.00$2.00$3.07$3.00
111Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH4$15,500$18,500$18,000$44,000$15,800$19,184$15,878
112Pedestrian pole assembly (687-7001)EACH3$4,750.00$6,500.00$5,200.00$4,800.00$4,750.00$4,551.96$3,096.00
113Pedestrian detect push button (APS) (688-7001)EACH8$1,500.00$1,850.00$1,100.00$1,400.00$1,000.00$1,274.54$885.00
114Pedestrian detector controller unit (688-7003)EACH1$5,000.00$6,500.00$4,500.00$9,000.00$3,940.00$5,403.88$2,884.00
115Bbu system (external battery cabinet) (6007-7001)EACH1$8,700.00$8,500.00$9,500.00$18,000$8,600.00$9,712.99$8,293.00
116RVDS (presence det)(install only) (6008-7004)EACH4$2,000.00$15,000$1,200.00$920.00$1,100.00$1,953.69$608.00
117RVDS (advance det)(install only) (6008-7005)EACH2$2,000.00$15,000$1,200.00$920.00$1,100.00$2,029.16$608.00
118CCTV field equipment (digital) (6018-7002)EACH1$9,725.00$6,500.00$6,100.00$10,000$5,600.00$8,586.00$9,731.00
119CCTV mount (pole) (6018-7003)EACH1$865.00$2,000.00$385.00$650.00$350.00$496.40$608.00
12024" concrete AWWA C303 wtrpipe,CSS bkfill (7026-7001)LF176$700.00$500.00$1,600.00$950.00$1,300.00$1,575.00$1,144.00
12124" concrete AWWA C303 water pipe (7026-7002)LF136$650.00$500.00$360.00$850.00$334.78$420.00$584.00
12242" casing by other than open cut* (7026-7003)LF136$2,000.00$1,650.00$2,500.00$1,200.00$2,050.00$2,625.00$1,508.00
1236" water pipe, CSS backfill (7026-7004)LF20$90.00$500.00$900.00$350.00$750.00$795.00$210.00
12424" gate valve W/ vault* (7026-7005)EACH1$50,000$50,000$95,000$86,000$80,000$84,800$113,891
1256" gate valve* (7026-7006)EACH1$3,500.00$3,850.00$2,500.00$7,300.00$2,000.00$2,120.00$3,207.00
126Water line grouting (7026-7007)CY13.40$300.00$1,000.00$1,200.00$725.00$1,000.00$1,060.00$1,305.00
12724" water abandonment plug (7026-7008)EACH2$3,500.00$1,500.00$6,000.00$725.00$5,000.00$5,300.00$10,173
12824" pressure plug (7026-7009)EACH2$5,000.00$2,500.00$6,000.00$10,000$5,000.00$5,300.00$10,062
129Salvage fire hydrant (7026-7010)EACH1$1,500.00$2,500.00$1,800.00$1,600.00$1,500.00$1,590.00$774.00
130Remove concrete water vault (EX 24"BFV) (7026-7011)EACH1$10,000$5,000.00$6,000.00$24,000$5,000.00$5,300.00$16,586
131Concrete water vault (EX 24" BFV) (7026-7012)EACH1$50,000$25,000$155,000$71,000$150,000$147,000$117,208
132Fire hydrant* (7026-7013)EACH1$8,500.00$7,500.00$15,000$14,000$12,500$13,250$10,947
133Connection to existing 24" water main (7026-7014)EACH2$30,000$3,500.00$77,000$65,000$65,000$73,500$170,284
134Ductile iron water fittings W/restraint (7026-7015)TON1$8,500.00$15,000$3,000.00$43,000$2,500.00$2,650.00$23,221
135Manhole adjustment, major W/ cover* (7026-7016)EACH1$4,000.00$8,500.00$15,000$4,000.00$12,500$13,250$9,509.00
136Valve box adjustment (7026-7017)EACH3$1,500.00$1,500.00$6,000.00$2,500.00$5,000.00$5,300.00$1,880.00
137Exploratory excavation of existing utility (7026-7018)EACH2$2,000.00$1,500.00$580.00$20,000$500.00$530.00$7,408.00
138Utility markers (7026-7019)EACH3$500.00$1,500.00$115.00$485.00$100.00$106.00$1,769.00
139Trench safety (7026-7020)LF196$10.00$10.00$3.50$240.00$3.00$3.18$7.00
140Seeding, hydromulch (7026-7021)SY300$10.00$3.00$4.35$6.50$4.00$4.20$6.00
141SWPPP = 1 acre (7026-7022)EACH1$5,000.00$8,500.00$5,000.00$17,000$2,500.00$1,000.00$7,500.00
142Construction staking (7026-7023)EACH1$10,000$50,000$4,100.00$125,000$2,500.00$3,710.00$100,000
143As-built survey (7026-7024)EACH1$5,000.00$20,000$4,100.00$5,000.00$2,500.00$3,710.00$3,000.00
1442" temporary water services (miscellaneous only) (7026-7025)LF400$15.00$95.00$43.00$40.00$37.00$39.22$133.00
TxDOT contract A00139426: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy