Xit Paving and Construction Inc.: TxDOT bid record

Xit Paving and Construction Inc. submitted 22 bids on Texas DOT contracts in the data, from 05 MAY 2023 to 17 NOV 2026, and was the low bidder on 5 of them (23%). When it was not low, its total sat a median +18% above the low bid.

Owner
Texas DOT
Low bid volume
$11,485,509
Latest bid
17 NOV 2026
Data through
19 NOV 2026
22Bids
5Low bids
23Win rate, percent
+18%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
20233267%
2024200%
2025800%
20269333%
Xit Paving and Construction Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District10330%
Paris District3133%
Tyler District300%
Fort Worth District2150%
Bryan District200%
Wichita Falls District100%
Brownwood District100%
Xit Paving and Construction Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF127 (58%)$1.00$1.00
Biodegradable erosion control logs (remove)506-7046LF127 (58%)$1.00$1.40
Barricades, signs and traffic handling502-7001MO195 (26%)$5,000.00$5,000.00
Block sodding162-7002SY135 (38%)$5.00$6.20
Vegetative watering168-7001TGL114 (36%)$39.00$37.73
TMA (mobile operation)505-7003DAY103 (30%)$650.00$291.17
Install small roadside sign support and assembly type 10BWG(1)SA(P)644-7001EACH103 (30%)$760.00$710.00
Pavement surface preparation for marking (24")678-7008LF73 (43%)$1.00$1.00
Portable changeable message sign503-7001DAY63 (50%)$76.50$100.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF63 (50%)$2.00$1.10
TMA (stationary)505-7001DAY152 (13%)$265.00$230.00
Temporary sediment control fence (install)506-7039LF122 (17%)$4.00$4.00
Xit Paving and Construction Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Xit Paving and Construction Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 NOV 2026A00224399Bryan DistrictDEBRIS REMOVAL, SH0006 (Various to Various)5 of 7$936,000+23%
12 NOV 2026A00223997Dallas DistrictCONCRETE SPALL REPAIR, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)2 of 6$727,000+18%
04 NOV 2026A00222905Fort Worth DistrictWiden Road - Add Lanes And Shoulders, SH 114 (At Alliance Blvd to .)1 of 7$482,224Low, 21% under the second
15 OCT 2026A00223573Paris DistrictDEBRIS REMOVAL, US0075 (Various locations in to Grayson County)5 of 7$711,000+28%
07 OCT 2026A00196909Dallas DistrictHazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line)1 of 8$3,761,164Low, 8.0% under the second
09 SEP 2026A00222177Dallas DistrictFULL DEPTH CONCRETE REPAIR, FM2478 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)5 of 7$906,850+34%
02 SEP 2026A00193937Dallas DistrictIntersection Improvement, SH 34 (At Abner Rd to .)4 of 7$1,197,303+25%
05 AUG 2026A00206966Paris DistrictConstruct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street)1 of 10$993,246Low, 4.0% under the second
04 MAR 2026A00207039Wichita Falls DistrictConstruct Pedestrian Infrastructure, FM 1306 (FM 51 to Gainesville High School)3 of 12$2,296,746+5.0%
01 JUL 2025A00199643Brownwood DistrictConstruct Pedestrian Infrastructure, Various (DISTRICTWIDE to .)5 of 9$1,563,045+15%
01 JUL 2025A00193092Tyler DistrictHazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137)8 of 10$2,381,996+45%
11 JUN 2025A00213054Dallas DistrictCULVERT EXTENSION & CROSS DRAINAGE, BS0289C (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)4 of 6$199,910+17%
05 JUN 2025A00185001Tyler DistrictConstruct Pedestrian Infrastructure, BS 19J (College St to St. Thomas Drive)9 of 12$2,726,107+84%
05 JUN 2025A00187707Bryan DistrictConstruct Pedestrian Infrastructure, FM 2818 (0.5 Mi E of FM 2154 to 0.1 mi E of Welsh Ave)6 of 10$1,979,260+11%
02 MAY 2025A00139426Fort Worth DistrictIntersection Improvements With Right And/Or Left Turn Lanes, FM 156 (at Industrial Blvd to .)6 of 7$7,191,761+12%
04 APR 2025A00190749Dallas DistrictHazard Elimination & Safety, IH 30 (PGBT to Bass Pro Drive)2 of 7$1,928,560+5.0%
04 MAR 2025A00134955Dallas DistrictIntersection Improvements With Right And/Or Left Turn Lanes, IH 45 (At SH 34 (Ennis Avenue) to .)3 of 4$8,740,412+8.0%
05 JUN 202406243026Tyler DistrictBS 19-J Construct pedestrian infrastructure from BEN BELT DR to HILLSIDE DR6 of 9$3,314,112+27%
03 MAY 202405243235Paris DistrictSH 5 Construct pedestrian infrastructure from WILLIAMS WAY to E VAN ALSTYNE PKWAY (FM 121)4 of 7$1,518,008+24%
02 NOV 202311233218Dallas DistrictSH 78 Intersection improvements with right and/or left from N OF BENTLEY DRIVE to BENTLEY DRIVE1 of 6$1,995,099Low, 2.0% under the second
28 JUN 202306233636Dallas DistrictFM 1171 Intersection improvements with right and/or left from AT FM 2499 (LONG PRAIRIE ROAD)2 of 5$879,939+4.0%
05 MAY 202305233221Dallas DistrictSH 66 Construct intersection improvements i from AT DALROCK RD1 of 4$4,253,776Low, 0.0% under the second
Xit Paving and Construction Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy