TxDOT letting results, November 2, 2023
23 contracts let by Texas DOT on November 2, 2023, $382,006,775 in low bids, a median of 4 bidders per contract. On the 23 with an engineer's estimate, the low bid came in under it 19 times; median low bid -7.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 23
- Low bids, total
- $382,006,775
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 11233201 | IH 20 Widen road - add lanes from EAST OF JBS PARKWAY to MIDLAND COUNTY LINE | Odessa District | 5 | Sundt Construction, Inc. | $260,876,640 | $272,817,246 | +5.0% | -8.0% | TxDOT |
| 11233202 | US 84 Seal coat from BAILEY COUNTY LINE to WEST SUDAN CITY LIMITS | Lubbock District | 3 | Lipham Asphalt and Paving Company, LLC | $22,788,746 | $23,777,571 | +4.0% | -2.0% | TxDOT |
| 11233204 | US 90 Seal coat from GONZALES C/L to FAIRES STREET (FLATONIA) | Yoakum District | 3 | Ronald R. Wagner & Co., LP | $19,785,796 | $20,419,097 | +3.0% | -12% | TxDOT |
| 11233203 | SH 152 Highway improvement from HUTCHINSON CO LINE to GRAY CO LINE | Amarillo District | 4 | RK Hall, LLC | $16,474,504 | $18,036,836 | +9.0% | -7.0% | TxDOT |
| 11233205 | US 82 Seal coat from CR 129 N to WICHITA COUNTY LINE (SB FR ONLY) | Wichita Falls District | 4 | Northeastern Pavers, LLC | $11,122,262 | $11,423,877 | +3.0% | -6.0% | TxDOT |
| 11233208 | IH 410 Intersection improvements with right and/or left from AT SOUTHCROS | San Antonio District | 3 | J3 Company, LLC | $8,150,777 | $9,098,999 | +12% | -3.0% | TxDOT |
| 11233206 | US 87 Seal coat from US 87 to LLANO COUNTY LINE | Austin District | 6 | Allen Keller Company | $6,987,837 | $7,918,520 | +13% | -20% | TxDOT |
| 11233207 | RM 1431 Seal coat from HAMILITON CREEK to TRAVIS COUNTY LINE | Austin District | 6 | Lone Star Paving Company | $6,275,058 | $6,314,476 | +1.0% | -17% | TxDOT |
| 11233211 | FM 1382 Bicycle and pedestrian improvements from CAMP WISDOM INTERSECTIOM to MANSFIELD RD | Dallas District | 5 | Texas-Reyes Group LTD. | $4,250,000 | $4,338,488 | +2.0% | -1.0% | TxDOT |
| 11233210 | US 290 Seal coat from KIMBLE C/L to W OF FLAG CREEK | Austin District | 5 | Allen Keller Company | $3,888,101 | $4,061,680 | +4.0% | -24% | TxDOT |
| 11233209 | SL 340 Surfacing/roadway restoration from FM 3051 to US 84 | Waco District | 3 | Knife River Corporation - South | $3,759,445 | $4,232,839 | +13% | -2.0% | TxDOT |
| 11233212 | VA Hazard elimination & safety from VARIOUS LOCATIONS | Paris District | 5 | TRP Construction Group, LLC | $3,141,295 | $3,349,097 | +7.0% | -37% | TxDOT |
| 11233213 | BU 54-A Install traffic signal from AT TIGER EYE DR | El Paso District | 1 | Tri State Electric, LTD. | $2,493,158 | +10% | TxDOT | ||
| 11233218 | SH 78 Intersection improvements with right and/or left from N OF BENTLEY DRIVE to BENTLEY DRIVE | Dallas District | 6 | Xit Paving and Construction Inc. | $1,995,099 | $2,026,492 | +2.0% | +22% | TxDOT |
| 11233215 | VA Preventive maintenance from VARIOUS LOCATIONS ON US 75 | Paris District | 4 | STX Civil | $1,696,572 | $1,847,400 | +9.0% | +12% | TxDOT |
| 11233223 | FM 1226 Bridge replacement from AT CALIFORNIA CREEK | Abilene District | 5 | Coppell Construction Co., Inc. | $1,671,854 | $1,789,746 | +7.0% | -12% | TxDOT |
| 11233214 | UA 90 Hazard elimination & safety from AT VAUGHAN | San Antonio District | 3 | E-Z Bel Construction, LLC | $1,668,822 | $1,705,017 | +2.0% | -7.0% | TxDOT |
| 11233216 | SH 105 Surfacing/roadway restoration from HOUSTON STREET, EAST to SH 326 | Beaumont District | 3 | Texas Materials Group, Inc. | $1,536,305 | $1,638,683 | +7.0% | -22% | TxDOT |
| 11233217 | VA Bridge maintenance from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT | Lubbock District | 7 | Icos Management, LLC | $1,420,057 | $1,446,809 | +2.0% | -7.0% | TxDOT |
| 11233220 | BU 59-Z Install traffic signal from 0.28 MILES EAST OF CLUBVIEW DR to 0.08 MILES WEST OF LOOP 20 | Laredo District | 1 | E-Z Bel Construction, LLC | $907,084 | +24% | TxDOT | ||
| 11233219 | FM 419 Bridge replacement from FM 419 to DRAW CREEK | Abilene District | 6 | Icos Management, LLC | $684,071 | $738,494 | +8.0% | -5.0% | TxDOT |
| 11233221 | VA Install illumination from VARIOUS LOCATIONS IN SMITH COUNTY | Tyler District | 6 | Snowhill Contracting LLC | $232,606 | $263,882 | +13% | -14% | TxDOT |
| 11233222 | VA Landscape development from VARIOUS LOCATIONS IN ANGELINA CO | Lufkin District | 4 | Rayford'S Truck & Tractor | $200,685 | $206,524 | +3.0% | -4.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.