Northeastern Pavers, LLC: TxDOT bid record
Northeastern Pavers, LLC submitted 97 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 04 NOV 2026, and was the low bidder on 45 of them (46%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $262,905,632
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 7 | 47% |
| 2021 | 14 | 6 | 43% |
| 2022 | 10 | 5 | 50% |
| 2023 | 7 | 4 | 57% |
| 2024 | 9 | 6 | 67% |
| 2025 | 21 | 7 | 33% |
| 2026 | 21 | 10 | 48% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Fort Worth District | 57 | 31 | 54% |
| Brownwood District | 18 | 5 | 28% |
| Wichita Falls District | 7 | 3 | 43% |
| Waco District | 7 | 4 | 57% |
| Abilene District | 2 | 0 | 0% |
| Childress District | 2 | 2 | 100% |
| Dallas District | 2 | 0 | 0% |
| Somervell | 1 | 0 | 0% |
| San Angelo District | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 45 | 11 of 45 |
| Peachtree Construction, LTD. | 38 | 6 of 38 |
| Foutsco Paving Company, LLC | 30 | 11 of 30 |
| Jagoe-Public Company | 23 | 9 of 23 |
| Ronald R. Wagner & Co., LP | 23 | 8 of 23 |
| Austin Bridge & Road Services, LP | 21 | 6 of 21 |
| CK Newberry, LLC | 17 | 4 of 17 |
| A. L. Helmcamp, Inc. | 15 | 3 of 15 |
| Eurovia Atlantic Coast LLC | 14 | 3 of 14 |
| Big Creek Construction, LTD. | 14 | 5 of 14 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00197444 | Brownwood District | Seal Coat, SL 254 (0.034 MI. S. OF IH 20 N. FRONTAGE RD. N. to IH 20 S. FRONTAGE ROAD) | 1 of 4 | $9,329,948 | Low, 2.0% under the second |
| 03 NOV 2026 | A00220202 | Wichita Falls District | Seal Coat, US 82 (St Jo E CL to Cooke County Line) | 3 of 6 | $12,704,850 | +4.0% |
| 03 NOV 2026 | A00197631 | Brownwood District | Seal Coat, SH 153 (SAN SABA STREET to US 84) | 4 of 4 | $3,979,906 | +36% |
| 14 OCT 2026 | A00223874 | Fort Worth District | FLEXIBLE BASE, IH0020 (VARIOUS LOCATIONS WITHIN to PALO PINTO COUNTY) | 4 of 4 | $142,500 | +41% |
| 07 OCT 2026 | A00209515 | Childress District | Preventive Maintenance, SH 86 (12 Miles West of Hall C/L, East to Hall C/L) | 1 of 4 | $6,256,780 | Low, 0.0% under the second |
| 07 OCT 2026 | A00209263 | Waco District | Rehabilitate Existing Roadway, IH 35W (IH 35E to Johnson Co Line) | 1 of 5 | $10,903,496 | Low, 2.0% under the second |
| 07 OCT 2026 | A00222965 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0281 (Various locations to Erath County) | 1 of 3 | $2,461,750 | Low, 30% under the second |
| 20 AUG 2026 | A00222913 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0020 (Various locations to Parker County) | 1 of 7 | $718,746 | Low, 21% under the second |
| 05 AUG 2026 | A00223027 | Brownwood District | ACP OVERLAY, SH0006 (FROM FM 1853 to UPRR IN CISCO) | 2 of 9 | $2,989,953 | 0.0% |
| 02 JUL 2026 | A00219620 | Fort Worth District | Repair Roadway, SH 171 (Willingham St to FM 1718) | 1 of 7 | $1,879,034 | Low, 8.0% under the second |
| 03 JUN 2026 | A00210421 | Fort Worth District | Rehabilitate Existing Roadway, FM 1884 (South of Fleet St to End of the State Maintenance) | 1 of 7 | $5,970,810 | Low, 2.0% under the second |
| 03 JUN 2026 | A00219121 | Fort Worth District | Resurface Roadway, SS 341 (Bolliger Blvd to Scott St.) | 1 of 8 | $1,490,461 | Low, 2.0% under the second |
| 03 JUN 2026 | A00220499 | Fort Worth District | FLEXIBLE PAVEMENT STRUCTURE REPAIR, US0380 (Various locations to Jack County) | 1 of 6 | $5,864,828 | Low, 6.0% under the second |
| 02 JUN 2026 | A00209489 | Dallas District | Rehabilitate Existing Roadway, US 67 (Dallas County Line to BUS 287Q) | 2 of 6 | $5,525,108 | +4.0% |
| 07 APR 2026 | A00209833 | Fort Worth District | Resurface Roadway, FM 1187 (Old Hwy 1887 to Newt Patterson Road) | 2 of 7 | $5,470,006 | +1.0% |
| 11 FEB 2026 | A00218661 | Brownwood District | MILL AND INLAY, SL0254 (EASTLAND, STEPHENS, COMANCHE to VARIOUS) | 5 of 5 | $1,288,345 | +22% |
| 05 FEB 2026 | A00210469 | Fort Worth District | Rehabilitate Existing Roadway, SH 16 (Various Locations to At Possum Kingdom Fish Hatchery) | 4 of 7 | $470,899 | +45% |
| 04 FEB 2026 | A00063498 | Fort Worth District | Rehabilitate Existing Roadway, US 281 (IH 20 to UPRR) | 4 of 8 | $3,477,549 | +18% |
| 06 JAN 2026 | A00206074 | Fort Worth District | Rehabilitate Existing Roadway, FM 3325 (IH 20 to FM 1886) | 1 of 9 | $6,252,903 | Low, 7.0% under the second |
| 06 JAN 2026 | A00217192 | Brownwood District | Resurface Roadway, US 67 (Near FM 2524 to US 377) | 6 of 6 | $3,403,991 | +76% |
| 06 JAN 2026 | A00218380 | Waco District | HOT MIX, SH0022 (VARIOUS LOCATIONS to in Bosque and Hamilton County) | 2 of 4 | $1,587,350 | +12% |
| 03 DEC 2025 | A00195009 | Fort Worth District | Preventive Maintenance, FM 4 (CR 1131 to US 67) | 2 of 3 | $3,220,414 | +12% |
| 02 DEC 2025 | A00195013 | Fort Worth District | Preventive Maintenance, SH 108 (Palo Pinto Co. Line to N of FM 219) | 1 of 4 | $8,867,453 | Low, 1.0% under the second |
| 19 NOV 2025 | A00217544 | Fort Worth District | HOT MIX, IH0035W (VARIOUS LOCATIONS WITHIN to Johnson County) | 1 of 2 | $910,250 | Low, 10% under the second |
| 06 NOV 2025 | A00060109 | Fort Worth District | Install Raised Median, FM 1938 (FM 1709 to STARNES RD) | 5 of 9 | $11,568,497 | +17% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.