TxDOT letting results, January 6, 2026
42 contracts let by Texas DOT on January 6, 2026, $244,793,431 in low bids, a median of 6 bidders per contract. On the 42 with an engineer's estimate, the low bid came in under it 34 times; median low bid -7.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 42
- Low bids, total
- $244,793,431
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00190019 | Highway Improvement, US 83 (FM 1038, South to King C/L) | Childress District | 9 | Zack Burkett Co. | $46,493,743 | $48,182,383 | +4.0% | +2.0% | TxDOT |
| A00128788 | Construct New Roadway Lanes, FM 624 (CR 73 to Wildcat Dr.) | Corpus Christi District | 4 | J E Construction Services, LLC | $30,814,865 | $36,254,638 | +18% | -14% | TxDOT |
| A00188847 | Surfacing/Roadway Restoration, SH 225 (SL 8 to Miller Cut Off Rd) | Houston District | 6 | Texas Materials Group, Inc. | $22,200,382 | $23,639,645 | +6.0% | +7.0% | TxDOT |
| A00189688 | Resurface Roadway, US 59 (14.3 MI WEST OF FM 2895 to 1.9 MI EAST OF SL 20) | Laredo District | 4 | Anderson Columbia Co., Inc. | $16,415,512 | $16,699,465 | +2.0% | -20% | TxDOT |
| A00193539 | Hazard Elimination & Safety, SH 302 (FM 866 to .) | Odessa District | 3 | Reece Albert, Inc. | $16,211,726 | $16,378,565 | +1.0% | +37% | TxDOT |
| A00184512 | Hazard Elimination & Safety, SH 64 (CR 4133 to SL 571) | Tyler District | 5 | Longview Bridge and Road, LTD. | $13,629,478 | $14,133,502 | +4.0% | +2.0% | TxDOT |
| A00126437 | Surfacing/Roadway Restoration, SH 35 (FM 518 to BS 35-C(N)) | Houston District | 4 | Durwood Greene Construction Co. | $8,773,976 | $9,159,789 | +4.0% | -2.0% | TxDOT |
| A00215390 | Surfacing/Roadway Restoration, US 59 (SH 155 to Marion C/L) | Atlanta District | 5 | Silver Creek Construction, Inc. | $7,736,641 | $8,878,711 | +15% | -3.0% | TxDOT |
| A00197563 | Transportation Non-Roadway, FM 2556 (1330 FT S of FM 2556 & CR 407 Int. to Along FM 2556) | Pharr District | 7 | Mor-Wil, L.L.C. | $6,565,146 | $6,623,433 | +1.0% | -11% | TxDOT |
| A00206074 | Rehabilitate Existing Roadway, FM 3325 (IH 20 to FM 1886) | Fort Worth District | 9 | Northeastern Pavers, LLC | $6,252,903 | $6,661,572 | +7.0% | -41% | TxDOT |
| A00064705 | Widen Road - Add Shoulders, FM 600 (US 380 to FM 618) | Abilene District | 4 | Zack Burkett Co. | $5,128,777 | $5,475,914 | +7.0% | -7.0% | TxDOT |
| A00196217 | Rehabilitate Existing Roadway, US 271 (BU 271H to 0.2 Mi. N. of SL 179) | Atlanta District | 3 | RK Hall, LLC | $5,003,037 | $6,139,577 | +23% | -20% | TxDOT |
| A00209445 | Surfacing/Roadway Restoration, FM 1097 (SH 75 to Walker County Line) | Houston District | 7 | Durwood Greene Construction Co. | $4,872,185 | $5,370,374 | +10% | 0.0% | TxDOT |
| A00195603 | Rehabilitate Existing Roadway, US 77 (SH 71 to BU 71E) | Yoakum District | 6 | Hunter Industries, LTD. | $4,335,114 | $4,735,906 | +9.0% | +4.0% | TxDOT |
| A00206402 | Hazard Elimination & Safety, SH 37 (CR 2460 to CR 2302 (0.23 mi N SL 564)) | Tyler District | 8 | Baker & Company Construction, LLC | $4,058,410 | $4,498,998 | +11% | -1.0% | TxDOT |
| A00193318 | Transportation Non-Roadway, IH 35W (Luella Bridge to 0.2 mi S of Altamesa Bridge) | Fort Worth District | 9 | O. Trevino Construction, LLC | $3,872,524 | $4,194,557 | +8.0% | -27% | TxDOT |
| A00129304 | Bridge Replacement, FM 521 (AT CANEY CREEK to STR# 0847-01-016) | Yoakum District | 7 | STX Civil | $3,770,670 | $4,082,180 | +8.0% | -4.0% | TxDOT |
| A00128039 | Remove/Replace Bridge Rail, IH 610 (At Broad Street to .) | Houston District | 7 | MBN Enterprises LLC | $3,111,482 | $3,317,274 | +7.0% | -4.0% | TxDOT |
| A00206664 | Hazard Elimination & Safety, FM 900 (2.75 Mi S of FM 69 to US 67) | Paris District | 8 | Garret Shields Infrastructure | $2,863,925 | $3,086,235 | +8.0% | -20% | TxDOT |
| A00211861 | Bridge Maintenance, BS 6S (BS 6 NB to at SH 6 SB) | Bryan District | 8 | Gibson & Associates, Inc. | $2,838,056 | $3,044,907 | +7.0% | +9.0% | TxDOT |
| A00217953 | HOT MIX, SH0006 (VARIOUS LOCATIONS to In McLennan and Hill) | Waco District | 3 | Big Creek Construction, LTD. | $2,710,700 | $2,915,908 | +8.0% | -9.0% | TxDOT |
| A00209701 | Bridge Maintenance, SH 19 (At Lake Creek to .) | Paris District | 10 | Gibson & Associates, Inc. | $2,541,166 | $3,089,143 | +22% | -35% | TxDOT |
| A00210325 | Communication System, IH 10 (8.5 MI E OF VAN HORN to EVERGREEN RD) | El Paso District | 1 | Tri State Electric, LTD. | $2,093,655 | -1.0% | TxDOT | ||
| A00218004 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0045 (VARIOUS LOCATIONS IN THE to EAST DALLAS COUNTY MAINTENANCE SECTION) | Dallas District | 5 | Peachtree Construction, LTD. | $2,016,811 | $2,172,945 | +8.0% | -4.0% | TxDOT |
| A00217192 | Resurface Roadway, US 67 (Near FM 2524 to US 377) | Brownwood District | 6 | Big Creek Construction, LTD. | $1,931,829 | $2,526,673 | +31% | -2.0% | TxDOT |
| A00198367 | Rehabilitate Existing Roadway, FM 1160 (0.07 Mi S of FM 1300 W to 0.28 Mi N of FM 1300 W) | Yoakum District | 7 | Clark Construction of Texas, Inc. | $1,897,773 | $1,998,207 | +5.0% | -2.0% | TxDOT |
| A00218600 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY, US0181 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | San Antonio District | 5 | Texas Materials Group, Inc. | $1,893,846 | $2,221,441 | +17% | -7.0% | TxDOT |
| A00218577 | PAVEMENT MARKINGS, US0069 (Various Roadways in to Smith & Cherokee Counties) | Tyler District | 2 | Striping Technology, L.P. | $1,684,171 | $2,346,185 | +39% | -29% | TxDOT |
| A00218599 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY, IH0410 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | San Antonio District | 4 | Texas Materials Group, Inc. | $1,616,344 | $1,761,332 | +9.0% | -3.0% | TxDOT |
| A00218380 | HOT MIX, SH0022 (VARIOUS LOCATIONS to in Bosque and Hamilton County) | Waco District | 4 | Big Creek Construction, LTD. | $1,416,100 | $1,587,350 | +12% | -11% | TxDOT |
| A00217954 | EMULSION, SH0031 (Various locations to in the Waco District) | Waco District | 3 | Ergon Asphalt & Emulsions, Inc. | $1,241,125 | $1,407,625 | +13% | -14% | TxDOT |
| A00218005 | FULL DEPTH CONCRETE REPAIR, IH0035E (Various Roadways in the to Ellis County Maintenance Section) | Dallas District | 6 | 3LW Civil LLC | $1,160,563 | $1,169,000 | +1.0% | -19% | TxDOT |
| A00206284 | Bridge Replacement, COUNTY ROAD 281 (@ PONTON CREEK to STR# AA01-72-001) | Yoakum District | 10 | STX Civil | $1,153,910 | $1,217,213 | +5.0% | -6.0% | TxDOT |
| A00193947 | Install Raised Median, BI 45G (SS 469 to SH 34) | Dallas District | 9 | Garret Shields Infrastructure | $1,134,486 | $1,187,000 | +5.0% | -26% | TxDOT |
| A00210035 | Preventive Maintenance, Various (Various Locations in Travis and to Hays Counties) | Austin District | 6 | TRP Infrastructure Services, LLC | $1,018,392 | $1,150,975 | +13% | -6.0% | TxDOT |
| A00218196 | BRIDGE PREVENTATIVE MAINTENANCE, IH0820 (VARIOUS LOCATIONS WITHIN to South Tarrant County) | Fort Worth District | 13 | Road Doctors LLC | $960,310 | $962,887 | 0.0% | -40% | TxDOT |
| A00187099 | Preventive Maintenance, Various (EASTLAND AREA to .) | Brownwood District | 7 | D. I. J. Construction, Inc. | $952,952 | $957,789 | +1.0% | -19% | TxDOT |
| A00214714 | BRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 6 | Taylor Bridge LLC | $732,646 | $743,185 | +1.0% | -43% | TxDOT |
| A00218006 | METAL BEAM GUARD FENCE REPAIR, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | Dallas District | 2 | Fireman Excavating, Inc. | $709,394 | $985,378 | +39% | -61% | TxDOT |
| A00214748 | Bridge Maintenance, Various (Districtwide to .) | Odessa District | 12 | Premier Contractors LLC | $498,387 | $591,362 | +19% | -31% | TxDOT |
| A00196608 | Install/Replace Signs, Various (DISTRICT WIDE to .) | Beaumont District | 12 | Hazmat International, Inc. | $241,947 | $243,180 | +1.0% | +23% | TxDOT |
| A00206389 | Hazard Elimination & Safety, US 82 (3.20 Miles East of the Benjamin C/L to 1.40 Miles) | Childress District | 7 | Twelve Stars Construction Company LLC | $238,375 | $246,740 | +4.0% | -21% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.