TxDOT contract A00189688 bid tabulation
Resurface Roadway, US 59 (14.3 MI WEST OF FM 2895 to 1.9 MI EAST OF SL 20). Let by Texas DOT on January 6, 2026, Webb, Laredo District. 4 bids received; low bid $16,415,512 by Anderson Columbia Co., Inc., -20% against the engineer's estimate of $20,635,134.
- Owner
- Texas DOT
- Letting
- 06 JAN 2026
- Pay items
- 64
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $16,415,512 | Low | -20% |
| 2 | Texas Materials Group, Inc. | $16,699,465 | +2.0% | -19% |
| 3 | Hunter Industries, LTD. | $17,421,355 | +6.0% | -16% |
| 4 | CK Newberry, LLC | $17,859,111 | +9.0% | -13% |
Engineer's estimate: $20,635,134.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Anderson Columbia Co., Inc. | 2. Texas Materials Group, Inc. | 3. Hunter Industries, LTD. | 4. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A) (134-7001) | STA | 634 | $200.00 | $194.00 | $175.00 | $129.80 | $100.00 |
| 2 | D-GR HMA type-C sac-A PG76-22 (341-7031) | TON | 43,630 | $133.00 | $111.00 | $123.50 | $111.87 | $115.00 |
| 3 | D-GR HMA type D PG70-22 (level-UP) (341-7051) | TON | 16,647 | $130.00 | $100.00 | $107.00 | $107.81 | $120.00 |
| 4 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 19,335 | $144.00 | $142.00 | $154.89 | $140.00 | |
| 5 | Tom-C PG76-22 sac-A (347-7001) | TON | 5,391 | $111.00 | $161.00 | $125.66 | $120.00 | |
| 6 | Flexible pavement structure repair(4") (351-7003) | SY | 51,865 | $28.00 | $28.00 | $28.45 | $35.00 | |
| 7 | Flexible pavement structure repair(5") (351-7004) | SY | 66,681 | $37.00 | $36.00 | $34.40 | $36.26 | $38.00 |
| 8 | Flexible pavement structure repair 2.5" (351-7031) | SY | 5,490 | $24.00 | $20.30 | $15.57 | $30.00 | |
| 9 | Planing asphalt concrete pavement(0" to 1") (354-7031) | SY | 11,540 | $2.00 | $1.90 | $1.76 | $1.00 | |
| 10 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 4,718 | $8.00 | $2.00 | $1.76 | $1.00 | |
| 11 | Planing asphalt concrete pavement(1") (354-7050) | SY | 2,590 | $4.30 | $1.90 | $1.98 | $1.00 | |
| 12 | Planing asphalt concrete pavement(2") (354-7051) | SY | 151,379 | $2.00 | $2.00 | $1.87 | $1.00 | |
| 13 | Mobilization (500-7001) | LS | 1 | $1,869,519 | $842,000 | $643,000 | $1,096,581 | $1,500,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $6,500.00 | $3,000.00 | $3,400.00 | $4,515.29 | $5,000.00 |
| 15 | Portable changeable message sign (503-7002) | EACH | 4 | $12,500 | $18,000 | $6,000.00 | $8,118.75 | $5,000.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 217 | $350.00 | $300.00 | $100.00 | $108.25 | $25.00 |
| 17 | TMA (mobile operation) (505-7002) | HR | 475 | $500.00 | $75.00 | $50.00 | $162.38 | $25.00 |
| 18 | One-way traffic control (flagger cont) (510-7001) | HR | 4,340 | $76.00 | $25.00 | $60.00 | $99.00 | $50.00 |
| 19 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 158,720 | $0.18 | $0.14 | $0.14 | $0.14 | $0.08 |
| 20 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 135,820 | $0.22 | $0.12 | $0.16 | $0.16 | $0.11 |
| 21 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,249 | $25.50 | $27.00 | $25.00 | $25.00 | $25.00 |
| 22 | Metal W-beam guard fence (steel post) (540-7002) | LF | 100 | $80.00 | $50.00 | $45.00 | $45.00 | $45.00 |
| 23 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,500.00 | $4,000.00 | $3,270.00 | $2,500.00 | $2,500.00 |
| 24 | Remove metal beam guard fence (542-7001) | LF | 1,349 | $3.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $275.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 26 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,000.00 | $3,400.00 | $3,125.00 | $3,125.00 | $3,125.00 |
| 27 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $275.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 28 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 16 | $45.00 | $54.00 | $50.00 | $50.00 | $50.00 |
| 29 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 9,104 | $1.85 | $2.00 | $1.60 | $1.60 | $0.50 |
| 30 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 13,443 | $1.85 | $2.00 | $1.60 | $1.60 | $0.50 |
| 31 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 105 | $1.10 | $1.00 | $1.50 | $2.80 | |
| 32 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 8,397 | $0.90 | $0.92 | $0.84 | $0.88 | $1.30 |
| 33 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 372 | $3.20 | $2.90 | $2.00 | $5.40 | |
| 34 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 4,864 | $7.00 | $6.50 | $7.00 | $7.80 | |
| 35 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 88 | $170.00 | $160.00 | $145.00 | $95.00 | $120.00 |
| 36 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 46 | $245.00 | $160.00 | $150.00 | $140.00 | $140.00 |
| 37 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 360 | $2.70 | $2.48 | $2.00 | $5.80 | |
| 38 | Pavement sler 6" (666-7347) | LF | 1,478 | $0.16 | $0.15 | $0.42 | $0.45 | |
| 39 | Pavement sler 8" (666-7348) | LF | 444 | $0.22 | $0.20 | $0.48 | $1.00 | |
| 40 | Pavement sler 24" (666-7352) | LF | 781 | $0.76 | $0.70 | $2.00 | $2.00 | |
| 41 | Pavement sler (arrow) (666-7353) | EACH | 6 | $11.00 | $10.00 | $20.00 | $40.00 | |
| 42 | Pavement sler (word) (666-7354) | EACH | 4 | $11.00 | $10.00 | $20.00 | $40.00 | |
| 43 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 21,253 | $0.70 | $0.58 | $0.53 | $0.78 | $0.75 |
| 44 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 235,684 | $0.70 | $0.56 | $0.52 | $0.54 | $0.62 |
| 45 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 22,990 | $0.85 | $0.57 | $0.53 | $0.78 | $0.72 |
| 46 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 152,894 | $0.65 | $0.57 | $0.53 | $0.58 | $0.65 |
| 47 | Prefabricated PM type B (W)(6")(solid) (668-7009) | LF | 5,380 | $4.00 | $3.70 | $8.25 | $3.80 | |
| 48 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 488 | $14.00 | $13.00 | $18.00 | $3.80 | |
| 49 | Prefabricated PM type B (W)(8")(solid) (668-7014) | LF | 2,545 | $13.00 | $12.00 | $9.00 | $4.80 | |
| 50 | Prefabricated PM type B (Y)(6")(solid) (668-7051) | LF | 5,500 | $11.00 | $10.00 | $8.25 | $2.40 | |
| 51 | Reflectorized pavement marker type I-C (672-7002) | EACH | 1,542 | $5.75 | $4.00 | $3.55 | $5.00 | $4.90 |
| 52 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,700 | $6.25 | $4.00 | $3.55 | $5.00 | $3.80 |
| 53 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 142 | $4.00 | $3.55 | $7.50 | $4.90 | |
| 54 | Eliminating existing PM & markers (4") (677-7001) | LF | 17,753 | $0.80 | $0.70 | $0.40 | $0.45 | |
| 55 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,688 | $0.90 | $0.80 | $0.60 | $1.20 | |
| 56 | Eliminating existing PM & markers (24") (677-7008) | LF | 781 | $2.20 | $2.00 | $3.00 | $5.00 | |
| 57 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 6 | $44.00 | $40.00 | $55.00 | $120.00 | |
| 58 | Eliminating existing PM & markers (word) (677-7015) | EACH | 4 | $44.00 | $40.00 | $55.00 | $120.00 | |
| 59 | Pavement surface preparation for marking (6") (678-7002) | LF | 17,753 | $0.18 | $0.17 | $0.10 | $1.00 | |
| 60 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,688 | $0.21 | $0.19 | $0.15 | $0.20 | |
| 61 | Pavement surface preparation for marking (24") (678-7008) | LF | 781 | $0.60 | $0.55 | $0.25 | $2.00 | |
| 62 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 6 | $11.00 | $10.00 | $30.00 | $20.00 | |
| 63 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $11.00 | $10.00 | $30.00 | $20.00 | |
| 64 | Bonding course (3007-7001) | GAL | 122,641 | $3.50 | $2.00 | $0.05 | $2.97 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 6, 2026. Compiled by Mirage Metrics.