Reece Albert, Inc.: TxDOT bid record
Reece Albert, Inc. submitted 80 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 04 NOV 2026, and was the low bidder on 19 of them (24%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $272,214,968
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 4 | 44% |
| 2021 | 11 | 1 | 9% |
| 2022 | 8 | 4 | 50% |
| 2023 | 6 | 2 | 33% |
| 2024 | 8 | 2 | 25% |
| 2025 | 21 | 3 | 14% |
| 2026 | 17 | 3 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Odessa District | 36 | 9 | 25% |
| San Angelo District | 25 | 10 | 40% |
| Abilene District | 16 | 0 | 0% |
| El Paso District | 2 | 0 | 0% |
| Brownwood District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 79 | 43 (54%) | $8,690.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 73 | 21 (29%) | $276.95 | $230.00 |
| Tack coat | 3077-6075 | GAL | 26 | 21 (81%) | $2.79 | $4.17 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 54 | 13 (24%) | $1.77 | $1.40 |
| Excavation (roadway) | 110-7001 | CY | 39 | 13 (33%) | $20.02 | $20.00 |
| Portable changeable message sign | 503-7001 | DAY | 29 | 12 (41%) | $92.68 | $100.00 |
| Biodegradable erosion control logs (install) (18") | 506-7045 | LF | 23 | 12 (52%) | $7.43 | $7.90 |
| Tack coat | 344-7077 | GAL | 15 | 11 (73%) | $2.67 | $4.50 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 23 | 10 (43%) | $1.09 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 23 | 10 (43%) | $4.61 | $4.00 |
| Construction exits (remove) | 506-7024 | SY | 22 | 10 (45%) | $10.57 | $10.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 62 | 9 (15%) | $5.59 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| RK Hall, LLC | 34 | 19 of 34 |
| Jones Bros. Dirt & Paving Contractors, Inc. | 33 | 19 of 33 |
| Ragle Construction, Inc. | 25 | 11 of 25 |
| CK Newberry, LLC | 22 | 13 of 22 |
| FNF Construction, Inc. | 17 | 6 of 17 |
| FNH Construction, LLC | 9 | 1 of 9 |
| J. H. Strain & Sons, Inc. | 9 | 7 of 9 |
| A. L. Helmcamp, Inc. | 9 | 5 of 9 |
| Dan Williams Company | 9 | 4 of 9 |
| Kiewit Infrastructure South Co. | 7 | 3 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00140672 | Abilene District | Preventive Maintenance, US 277 (SOUTH Y IN HASKELL SOUTHBOUND to JONES COUNTY) | 7 of 9 | $8,534,153 | +27% |
| 04 NOV 2026 | A00222974 | San Angelo District | ASPHALT PAVEMENT REPAIR, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT) | 1 of 4 | $3,124,443 | Low, 36% under the second |
| 03 NOV 2026 | A00223911 | Odessa District | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | 3 of 4 | $1,565,168 | +22% |
| 06 AUG 2026 | A00206263 | Odessa District | Bicycle And Pedestrian Improvements, Various (Champions, Tradewinds, and Deauville to Between Arlington Rd & SH250) | 4 of 6 | $3,223,208 | +55% |
| 06 AUG 2026 | A00193246 | San Angelo District | Intersection Improvement, US 87 (FM 2105 to 0.34 MI S OF FM 2105) | 1 of 2 | $2,825,728 | Low, 6.0% under the second |
| 02 JUN 2026 | A00198038 | San Angelo District | Bicycle And Pedestrian Improvements, Various (Along BU 67H From S Milton Street to Along BU 67H To S Koenigheim Street) | 6 of 7 | $2,424,103 | +45% |
| 07 MAY 2026 | A00213810 | Odessa District | Intersection Improvements With Right And/Or Left Turn Lanes, SH 302 (AT MARIAN DRIVE (NOTREES) to .) | 2 of 3 | $1,351,118 | +6.0% |
| 06 MAY 2026 | A00200125 | Odessa District | Highway Improvement, SH 302 (SH 158 to 1.0 mi W of SL 338) | 3 of 5 | $11,146,629 | +20% |
| 16 APR 2026 | A00216847 | San Angelo District | REHABILITATION OF EXISTING ROADWAY, RM0584 (PARKVIEW DR to SUNSET DR) | 2 of 2 | $913,714 | +20% |
| 08 APR 2026 | A00187842 | Odessa District | Highway Improvement, FM 1208 (FM1212 to MIDLAND C/L) | 3 of 5 | $11,381,091 | +21% |
| 08 APR 2026 | A00206920 | Abilene District | Preventive Maintenance, IH 20 (WESTBROOK to COLORADO CITY EAST CITY LIMITS) | 3 of 5 | $15,191,636 | +19% |
| 07 APR 2026 | A00196643 | Odessa District | Rehabilitate Existing Roadway, FM 1882 (SS 450 to BI 20) | 3 of 3 | $11,147,743 | +9.0% |
| 04 MAR 2026 | A00183875 | El Paso District | Preventive Maintenance, US 90 (18.1 MI S OF JEFF DAVIS COUNTY LINE to SH 17) | 2 of 3 | $4,249,827 | +2.0% |
| 04 MAR 2026 | A00211390 | San Angelo District | Preventive Maintenance, US 67 (US 83 to Elm Creek) | 3 of 3 | $13,345,146 | +22% |
| 04 MAR 2026 | A00193354 | Abilene District | Widen Road - Add Lanes And Shoulders, FM 89 (1.219 MILES SOUTH OF ELM CREEK to ELM CREEK) | 2 of 5 | $6,362,078 | +1.0% |
| 05 FEB 2026 | A00206930 | Abilene District | Preventive Maintenance, SL 322 (IH 20 to US 83) | 6 of 6 | $11,613,776 | +30% |
| 06 JAN 2026 | A00193539 | Odessa District | Hazard Elimination & Safety, SH 302 (FM 866 to .) | 1 of 3 | $16,211,726 | Low, 1.0% under the second |
| 03 DEC 2025 | A00195443 | Abilene District | Preventive Maintenance, BI 20G (EAST OF FM 700 to IH 20) | 2 of 2 | $1,076,579 | +7.0% |
| 03 DEC 2025 | A00184350 | Odessa District | Hazard Elimination & Safety, Various (SOUTH OF SL338 to SOUTH OF COOK RD) | 4 of 5 | $9,523,851 | +54% |
| 06 NOV 2025 | A00216051 | Odessa District | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | 2 of 4 | $1,808,049 | +3.0% |
| 05 NOV 2025 | A00187119 | Abilene District | Resurface Roadway, US 87 (NEAR RM 33 to NEAR FM 461) | 3 of 5 | $2,481,424 | +22% |
| 09 OCT 2025 | A00134307 | Odessa District | Install Traffic Signal, SH 158 (AT WADLEY AVE to .) | 2 of 4 | $9,194,680 | +25% |
| 08 OCT 2025 | A00134306 | Odessa District | Install Traffic Signal, SH 158 (AT CR 60/BRIARWOOD to .) | 2 of 4 | $7,239,119 | +19% |
| 04 SEP 2025 | A00216684 | Odessa District | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | 4 of 4 | $1,694,009 | +11% |
| 04 SEP 2025 | A00196445 | San Angelo District | Preventive Maintenance, US 67 (SL 306 (W SAN ANGELO) to CHADBOURNE STREET) | 1 of 3 | $20,466,166 | Low, 6.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.