TxDOT contract A00134307 bid tabulation
Install Traffic Signal, SH 158 (AT WADLEY AVE to .). Let by Texas DOT on October 9, 2025, Midland, Odessa District. 4 bids received; low bid $7,380,828 by Ragle Construction, Inc., -5.3% against the engineer's estimate of $7,797,110.
- Owner
- Texas DOT
- Letting
- 09 OCT 2025
- Pay items
- 136
- Data through
- 19 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ragle Construction, Inc. | $7,380,828 | Low | -5.0% |
| 2 | Reece Albert, Inc. | $9,194,680 | +25% | +18% |
| 3 | Jones Bros. Dirt & Paving Contractors, Inc. | $10,277,740 | +39% | +32% |
Engineer's estimate: $7,797,110.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ragle Construction, Inc. | 2. Reece Albert, Inc. | 3. Jones Bros. Dirt & Paving Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 39 | $4,500.00 | $18,500 | $2,927.72 | $1,300.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 15 | $35.00 | $50.00 | $132.04 | $13.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 459 | $25.00 | $9.00 | $34.93 | $13.00 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 137 | $75.00 | $10.00 | $38.55 | $18.00 |
| 5 | Removing concrete (curb) (104-7016) | LF | 797 | $50.00 | $4.00 | $13.37 | $6.00 |
| 6 | Remove (13"-17") TRT/untrt base & asphalt pavement (105-7013) | SY | 4,123 | $30.00 | $8.25 | $11.95 | $12.90 |
| 7 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 16,518 | $9.00 | $4.70 | $10.24 | $10.05 |
| 8 | Excavation (roadway) (110-7001) | CY | 2,984 | $16.00 | $30.00 | $24.40 | $55.00 |
| 9 | Embankment (final)(DC)(type B) (132-7004) | CY | 2,808 | $35.00 | $15.00 | $25.61 | $62.00 |
| 10 | Blading (150-7001) | STA | 50 | $200.00 | $15.00 | $452.22 | $500.00 |
| 11 | Drill seed (permanent_urban_sand) (164-7011) | SY | 27,799 | $0.75 | $0.47 | $0.23 | $0.24 |
| 12 | Soil ret BLKT(SL_steep_sand_long) (169-7008) | SY | 1,431 | $3.00 | $3.00 | $5.31 | $5.52 |
| 13 | Proof rolling (216-7001) | HR | 14 | $150.00 | $100.00 | $197.64 | $175.00 |
| 14 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 581 | $25.00 | $13.00 | $33.76 | $75.00 |
| 15 | FL BS (compacted in place)(type A GR 4)(5") (247-7345) | SY | 32,166 | $20.00 | $7.00 | $14.69 | $10.50 |
| 16 | Prime coat (AE-P) (310-7001) | GAL | 6,435 | $6.00 | $5.00 | $5.39 | $5.07 |
| 17 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 13,574 | $120.00 | $145.00 | $149.09 | $126.00 |
| 18 | Tack coat (344-7077) | GAL | 2,986 | $3.00 | $7.00 | $3.00 | $4.68 |
| 19 | Stone-MTRX-asphalt smar-F sac-A (346-7023) | TON | 0 | $150.00 | $0.00 | $0.00 | $0.00 |
| 20 | Trench excavation protection (402-7001) | LF | 1,368 | $92.00 | $7.00 | $7.32 | $288.65 |
| 21 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 88 | $450.00 | $800.00 | $885.73 | $920.00 |
| 22 | Riprap (concrete)(4 in) (432-7001) | CY | 98 | $730.00 | $700.00 | $1,058.57 | $690.00 |
| 23 | Riprap (concrete)(5 in) (432-7002) | CY | 159 | $800.00 | $575.00 | $911.40 | $661.25 |
| 24 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 567 | $588.00 | $480.00 | $1,189.51 | $2,301.15 |
| 25 | Concrete box culvert (10 FT X 4 FT) (462-7032) | LF | 606 | $1,150.00 | $650.00 | $1,390.90 | $2,680.65 |
| 26 | RC pipe (CL III)(18 in) (464-7003) | LF | 19 | $114.00 | $130.00 | $345.50 | $460.00 |
| 27 | RC pipe (CL III)(24 in) (464-7005) | LF | 292 | $100.00 | $90.00 | $336.88 | $325.45 |
| 28 | RC pipe (CL III)(36 in) (464-7009) | LF | 25 | $191.00 | $140.00 | $610.84 | $419.75 |
| 29 | RC pipe (CL III)(48 in) (464-7011) | LF | 553 | $300.00 | $200.00 | $718.50 | $923.45 |
| 30 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 6 | $2,000.00 | $8,900.00 | $13,272 | $14,994 |
| 31 | Inlet (complete)(pco)(3FT)(both) (465-7016) | EACH | 2 | $5,274.00 | $9,050.00 | $18,369 | $14,737 |
| 32 | Inlet (complete)(pco)(5FT)(left) (465-7022) | EACH | 1 | $6,300.00 | $11,250 | $18,860 | $17,666 |
| 33 | Inlet (complete)(pco)(5FT)(right) (465-7023) | EACH | 2 | $7,050.00 | $11,550 | $20,669 | $17,666 |
| 34 | Inlet (complete)(pazd)(RC)(5FTX5FT) (465-7154) | EACH | 2 | $7,570.00 | $30,750 | $19,391 | $18,321 |
| 35 | Wingwall (FW - S) (HW=6 FT) (466-7162) | EACH | 1 | $15,173 | $20,725 | $108,849 | $22,586 |
| 36 | Set (type II) (36 in) (CMP) (4: 1) (C) (467-7362) | EACH | 1 | $4,563.00 | $6,890.00 | $11,740 | $7,378.40 |
| 37 | Mobilization (500-7001) | LS | 1 | $870,189 | $730,000 | $918,733 | $750,000 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $35,000 | $25,500 | $10,943 | $30,000 |
| 39 | Portable changeable message sign (503-7002) | EACH | 3 | $12,200 | $20,000 | $11,692 | $11,500 |
| 40 | TMA (stationary) (505-7001) | DAY | 192 | $250.00 | $340.00 | $407.70 | $143.75 |
| 41 | TMA (mobile operation) (505-7003) | DAY | 40 | $165.00 | $500.00 | $942.89 | $989.00 |
| 42 | Construction exits (install) (type 1) (506-7020) | SY | 156 | $25.00 | $45.50 | $21.55 | $40.00 |
| 43 | Construction exits (remove) (506-7024) | SY | 156 | $7.00 | $24.00 | $8.72 | $20.00 |
| 44 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 3,638 | $4.00 | $5.87 | $4.66 | $8.43 |
| 45 | Biodegradable erosion control logs (remove) (506-7046) | LF | 3,638 | $2.00 | $1.47 | $4.48 | $2.02 |
| 46 | Constructing detours (508-7001) | SY | 3,943 | $75.00 | $65.00 | $120.88 | $75.00 |
| 47 | Remove and relay pavers (528-7003) | SY | 18 | $230.00 | $175.00 | $319.44 | $172.50 |
| 48 | Concrete curb (type II) (529-7002) | LF | 95 | $35.00 | $25.00 | $42.49 | $27.60 |
| 49 | Concrete curb & gutter (type II) (529-7009) | LF | 4,564 | $45.00 | $25.00 | $30.55 | $27.60 |
| 50 | Concrete curb (type C1) (529-7016) | LF | 206 | $50.00 | $130.00 | $203.03 | $63.25 |
| 51 | Driveways (concrete) (530-7006) | SY | 583 | $115.00 | $90.00 | $132.70 | $109.25 |
| 52 | Concrete sidewalks (4") (531-7001) | SY | 291 | $150.00 | $60.00 | $119.54 | $86.25 |
| 53 | Curb ramps (type 1) (531-7005) | EACH | 7 | $2,450.00 | $1,750.00 | $3,129.60 | $1,725.00 |
| 54 | Curb ramps (type 7) (531-7010) | EACH | 1 | $1,700.00 | $2,100.00 | $3,609.68 | $1,725.00 |
| 55 | Wire fence (remove) (552-7011) | LF | 3,179 | $5.00 | $3.00 | $1.25 | $5.00 |
| 56 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 25 | $21.00 | $20.00 | $22.14 | $23.00 |
| 57 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 180 | $27.00 | $25.00 | $27.68 | $28.75 |
| 58 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 30 | $39.00 | $35.00 | $38.75 | $40.25 |
| 59 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 580 | $45.00 | $45.00 | $49.82 | $51.75 |
| 60 | Electrical conductor (no.12) insulated (620-7004) | LF | 320 | $2.00 | $1.25 | $1.38 | $1.44 |
| 61 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,200 | $3.00 | $1.50 | $1.66 | $1.73 |
| 62 | Electrical conductor (no.6) bare (620-7009) | LF | 815 | $3.00 | $1.75 | $1.94 | $2.01 |
| 63 | Electrical conductor (no.6) insulated (620-7010) | LF | 50 | $3.00 | $2.00 | $2.21 | $2.30 |
| 64 | Tray cable (3 conductor) (14 AWG) (621-7001) | LF | 1,905 | $3.00 | $4.00 | $4.43 | $4.60 |
| 65 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $2,850.00 | $2,750.00 | $3,044.71 | $3,162.50 |
| 66 | Elc SRV type D 120/240 070(NS)SS(E)SP(O) (628-7191) | EACH | 1 | $10,750 | $11,000 | $12,179 | $12,650 |
| 67 | Aluminum signs (type A) (636-7001) | SF | 27 | $30.00 | $45.00 | $49.82 | $51.75 |
| 68 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 13 | $800.00 | $960.00 | $1,062.88 | $1,104.00 |
| 69 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $400.00 | $100.00 | $253.61 | $250.00 |
| 70 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 13,824 | $0.50 | $0.60 | $0.39 | $0.40 |
| 71 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 78 | $1.25 | $1.00 | $1.16 | $1.21 |
| 72 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 204 | $1.25 | $1.00 | $0.72 | $0.75 |
| 73 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 35 | $4.50 | $20.00 | $5.54 | $5.75 |
| 74 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 1 | $36.75 | $250.00 | $415.19 | $431.25 |
| 75 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 1 | $94.50 | $350.00 | $470.55 | $488.75 |
| 76 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 13,419 | $0.50 | $0.60 | $0.39 | $0.40 |
| 77 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 343 | $3.50 | $4.50 | $5.54 | $5.75 |
| 78 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 734 | $5.00 | $4.50 | $4.98 | $5.18 |
| 79 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 1,026 | $5.00 | $3.60 | $4.98 | $5.18 |
| 80 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 2,202 | $4.00 | $3.60 | $4.98 | $5.18 |
| 81 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 667 | $0.39 | $1.00 | $2.49 | $5.00 |
| 82 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 63 | $1.50 | $1.10 | $1.66 | $1.73 |
| 83 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,770 | $1.00 | $1.10 | $1.09 | $1.13 |
| 84 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,269 | $7.00 | $9.00 | $6.64 | $6.90 |
| 85 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 230 | $1.16 | $0.40 | $0.72 | $0.75 |
| 86 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 12,048 | $0.35 | $0.35 | $0.39 | $0.40 |
| 87 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 63 | $0.30 | $0.50 | $1.11 | $1.15 |
| 88 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 2,770 | $1.25 | $0.50 | $0.61 | $0.63 |
| 89 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 2,269 | $3.50 | $4.00 | $3.32 | $3.45 |
| 90 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 13,326 | $0.35 | $0.35 | $0.39 | $0.40 |
| 91 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 230 | $0.60 | $1.00 | $1.33 | $1.38 |
| 92 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 12,048 | $0.82 | $0.86 | $0.94 | $0.98 |
| 93 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 13,326 | $0.80 | $0.86 | $0.94 | $0.98 |
| 94 | Prefabricated PM type B (W)(arrow) (668-7023) | EACH | 10 | $250.00 | $650.00 | $719.66 | $747.50 |
| 95 | Prefabricated PM type B (W)(word) (668-7031) | EACH | 10 | $250.00 | $775.00 | $1,085.03 | $1,127.00 |
| 96 | Reflectorized pavement marker type I-C (672-7002) | EACH | 55 | $4.00 | $8.00 | $7.75 | $8.05 |
| 97 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 445 | $3.00 | $7.00 | $5.54 | $5.75 |
| 98 | Eliminating existing PM & markers (4") (677-7001) | LF | 11,206 | $0.75 | $1.00 | $4.31 | $1.25 |
| 99 | Pavement surface preparation for marking (6") (678-7002) | LF | 25,604 | $0.35 | $0.35 | $0.35 | $0.37 |
| 100 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,833 | $0.10 | $0.35 | $0.55 | $0.58 |
| 101 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,269 | $2.35 | $3.00 | $2.21 | $2.30 |
| 102 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $55,000 | $20,000 | $22,143 | $23,000 |
| 103 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 13 | $363.00 | $350.00 | $387.51 | $402.50 |
| 104 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 8 | $363.00 | $350.00 | $387.51 | $402.50 |
| 105 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 13 | $363.00 | $350.00 | $387.51 | $402.50 |
| 106 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 10 | $363.00 | $350.00 | $387.51 | $402.50 |
| 107 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 13 | $363.00 | $350.00 | $387.51 | $402.50 |
| 108 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 6 | $363.00 | $350.00 | $387.51 | $402.50 |
| 109 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $885.00 | $950.00 | $1,051.81 | $1,092.50 |
| 110 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 8 | $150.00 | $175.00 | $193.76 | $201.25 |
| 111 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 1 | $364.00 | $200.00 | $221.43 | $230.00 |
| 112 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 7 | $333.00 | $225.00 | $249.11 | $258.75 |
| 113 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 470 | $4.00 | $3.00 | $3.32 | $3.45 |
| 114 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 360 | $4.00 | $3.50 | $3.88 | $4.03 |
| 115 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 720 | $5.00 | $4.00 | $4.43 | $4.60 |
| 116 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 740 | $8.00 | $6.00 | $6.64 | $6.90 |
| 117 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,500 | $3.00 | $2.00 | $2.21 | $2.30 |
| 118 | Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060) | EACH | 2 | $40,123 | $50,000 | $55,358 | $57,500 |
| 119 | Ins traffic signal PL AM(S)1 arm(65')lum&ilsn (686-7068) | EACH | 2 | $41,453 | $52,500 | $58,126 | $60,375 |
| 120 | Pedestrian pole assembly (687-7001) | EACH | 4 | $2,500.00 | $3,750.00 | $4,151.88 | $4,312.50 |
| 121 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $950.00 | $1,000.00 | $1,107.17 | $1,150.00 |
| 122 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $5,000.00 | $5,000.00 | $5,535.84 | $5,750.00 |
| 123 | Bonding course (3007-7001) | GAL | 2,986 | $2.64 | $5.50 | $3.00 | $4.99 |
| 124 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $15,000 | $12,500 | $13,840 | $14,375 |
| 125 | Video imaging and radar detector (6017-7015) | EACH | 4 | $8,000.00 | $6,500.00 | $7,196.59 | $7,475.00 |
| 126 | Video imaging and radar set-UP sys (6017-7016) | EACH | 1 | $2,500.00 | $2,500.00 | $2,767.92 | $2,875.00 |
| 127 | Vid image and radar det processor sys (6017-7018) | EACH | 1 | $15,000 | $22,500 | $24,911 | $25,875 |
| 128 | Water main pipe (PVC)(C900)(8 in) (7004-7005) | LF | 20 | $80.00 | $400.00 | $744.06 | $1,437.50 |
| 129 | Connect to existing water line (7025-7004) | EACH | 2 | $2,500.00 | $10,750 | $3,092.28 | $5,750.00 |
| 130 | Ductile iron water fittings W/restraint (7026-7015) | TON | 1 | $15,000 | $15,000 | $2,570.57 | $5,750.00 |
| 131 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 2,433 | $150.00 | $195.00 | $248.02 | $178.00 |
| 132 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 0 | $100.00 | $0.00 | $0.00 | $0.00 |
| 133 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 0 | $114.00 | $0.00 | $0.00 | $0.00 |
| 134 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 0 | $191.00 | $0.00 | $0.00 | $0.00 |
| 135 | Thermoplastic pipe (PP) (48") (468-7006) | LF | 0 | $300.00 | $0.00 | $0.00 | $0.00 |
| 136 | Set (type II) (36 in) (TP) (4: 1) (C) (467-7370) | EACH | 0 | $4,563.00 | $0.00 | $0.00 | $0.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.