| 1 | Removing concrete (riprap) (104-7006) | SY | 3 | $30.00 | $214.86 | $220.93 |
| 2 | Removing concrete (curb & gutter) (104-7017) | LF | 532 | $20.00 | $18.54 | $12.53 |
| 3 | Excavation (roadway) (110-7001) | CY | 750 | $25.00 | $91.51 | $18.75 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 633 | $40.00 | $52.59 | $38.68 |
| 5 | Backfill (type B) (134-7002) | STA | 23 | $300.00 | $316.30 | $497.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 9,598 | $2.00 | $9.43 | $2.73 |
| 7 | Drill seed (permanent_rural_clay) (164-7010) | SY | 9,598 | $0.25 | $0.59 | $0.66 |
| 8 | Vegetative watering (168-7001) | TGL | 150 | $30.00 | $59.58 | $96.37 |
| 9 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 1,391 | $90.00 | $121.98 | $95.90 |
| 10 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 834 | $9.00 | $7.09 | $9.39 |
| 11 | Aggregate (type-B, GR-3)(sac-B) (316-7171) | CY | 19 | $250.00 | $346.94 | $478.76 |
| 12 | Aggregate (type-PB, GR-3)(sac-B) (316-7208) | CY | 19 | $250.00 | $435.06 | $478.76 |
| 13 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 1,878 | $8.00 | $5.77 | $6.52 |
| 14 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 4,248 | $130.00 | $175.46 | $172.01 |
| 15 | Tack coat (344-7077) | GAL | 1,540 | $4.00 | $3.61 | $11.60 |
| 16 | Flexible pavement structure repair(13") (351-7012) | SY | 1,193 | $125.00 | $244.24 | $202.76 |
| 17 | Planing asphalt concrete pavement (0" to 2-1/2") (354-7083) | SY | 7,589 | $2.75 | $9.83 | $8.78 |
| 18 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 39 | $250.00 | $355.81 | $236.50 |
| 19 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 60 | $300.00 | $627.90 | $495.00 |
| 20 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 28 | $500.00 | $906.97 | $715.00 |
| 21 | Riprap (concrete)(4 in) (432-7001) | CY | 1.50 | $650.00 | $1,323.54 | $11,101 |
| 22 | Mobilization (500-7001) | LS | 1 | $160,913 | $266,678 | $299,002 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $10,000 | $30,418 | $30,141 |
| 24 | Portable changeable message sign (503-7001) | DAY | 118 | $130.00 | $112.22 | $172.89 |
| 25 | TMA (stationary) (505-7001) | DAY | 101 | $235.00 | $432.74 | $273.40 |
| 26 | TMA (mobile operation) (505-7003) | DAY | 10 | $300.00 | $873.99 | $458.30 |
| 27 | Construction exits (install) (type 1) (506-7020) | SY | 112 | $29.00 | $40.76 | $47.48 |
| 28 | Construction exits (remove) (506-7024) | SY | 112 | $12.00 | $18.21 | $17.13 |
| 29 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 64 | $10.00 | $17.76 | $17.74 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 64 | $1.00 | $3.86 | $5.71 |
| 31 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 1,950 | $40.00 | $17.76 | $215.58 |
| 32 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 1,950 | $16.00 | $15.29 | $44.35 |
| 33 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 4,311 | $1.00 | $3.70 | $2.92 |
| 34 | Concrete median (536-7002) | SY | 217 | $95.00 | $345.29 | $600.87 |
| 35 | Crash cushion attenuator (remove) (545-7004) | EACH | 1 | $1,000.00 | $1,171.01 | $3,155.54 |
| 36 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 1 | $9,000.00 | $11,694 | $13,064 |
| 37 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 2 | $3,550.00 | $4,883.67 | $3,850.00 |
| 38 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 4 | $6,200.00 | $11,860 | $9,350.00 |
| 39 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,600 | $25.00 | $11.16 | $8.80 |
| 40 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 150 | $45.00 | $41.86 | $33.00 |
| 41 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 220 | $30.00 | $34.88 | $27.50 |
| 42 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 300 | $65.00 | $48.84 | $38.50 |
| 43 | Electrical conductor (no.8) bare (620-7007) | LF | 2,390 | $3.00 | $2.79 | $2.20 |
| 44 | Electrical conductor (no.8) insulated (620-7008) | LF | 3,900 | $4.00 | $3.14 | $2.48 |
| 45 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 535 | $4.50 | $6.98 | $5.50 |
| 46 | Ground box type A (122311)W/apron (624-7002) | EACH | 4 | $1,500.00 | $2,790.67 | $2,200.00 |
| 47 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $2,100.00 | $4,186.00 | $3,300.00 |
| 48 | Remove ground box (624-7013) | EACH | 1 | $400.00 | $697.66 | $550.00 |
| 49 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 1 | $8,000.00 | $17,442 | $13,750 |
| 50 | Aluminum signs (type A) (636-7001) | SF | 78 | $50.00 | $103.25 | $82.50 |
| 51 | Aluminum signs (type G) (636-7002) | SF | 189.75 | $36.00 | $54.42 | $39.60 |
| 52 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $750.00 | $1,010.22 | $852.50 |
| 53 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 17 | $810.00 | $1,187.43 | $907.50 |
| 54 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 1 | $1,256.00 | $1,738.58 | $1,100.00 |
| 55 | Remove SM RD SN sup&AM (644-7073) | EACH | 21 | $100.00 | $174.59 | $110.00 |
| 56 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 1 | $200.00 | $95.18 | $38.50 |
| 57 | Install LRSS (struct steel) (647-7001) | LB | 1,439.60 | $8.50 | $11.16 | $7.98 |
| 58 | Remove lrsa (647-7003) | EACH | 1 | $1,500.00 | $2,265.80 | $1,100.00 |
| 59 | Install OM LG RD sign (2-OM-type 1)Y (658-7090) | EACH | 3 | $50.00 | $107.44 | $74.80 |
| 60 | Install object marker assembly (OM-2Z)(WFLX)GNDHH(BI) (658-7253) | EACH | 4 | $150.00 | $267.91 | $220.00 |
| 61 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 17 | $100.00 | $18.14 | $13.20 |
| 62 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 9 | $50.00 | $18.14 | $16.50 |
| 63 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 624 | $0.60 | $2.09 | $1.65 |
| 64 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 38 | $0.80 | $2.09 | $1.65 |
| 65 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 3,115 | $0.70 | $1.40 | $1.10 |
| 66 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 50 | $3.30 | $24.42 | $19.25 |
| 67 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 3 | $75.00 | $279.07 | $220.00 |
| 68 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 3 | $75.00 | $418.60 | $330.00 |
| 69 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 3,839 | $0.40 | $1.40 | $1.10 |
| 70 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 414 | $3.50 | $24.42 | $19.25 |
| 71 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 271 | $2.00 | $2.79 | $2.20 |
| 72 | Work zone pavement marking removing (W)36"(yld tri) (662-7094) | EACH | 6 | $100.00 | $104.65 | $82.50 |
| 73 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 4,962 | $1.00 | $2.79 | $2.20 |
| 74 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,246 | $2.00 | $4.16 | $6.08 |
| 75 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 112 | $2.00 | $5.68 | $5.68 |
| 76 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 983 | $9.00 | $15.35 | $12.10 |
| 77 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 7 | $25.00 | $313.95 | $247.50 |
| 78 | Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060) | EACH | 4 | $450.00 | $558.14 | $440.00 |
| 79 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 7 | $300.00 | $453.48 | $357.50 |
| 80 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 17 | $35.00 | $69.77 | $55.00 |
| 81 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 414 | $10.00 | $15.70 | $12.38 |
| 82 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 1,600 | $0.90 | $1.47 | $1.16 |
| 83 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 9,749 | $0.90 | $1.47 | $1.16 |
| 84 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 13,300 | $0.90 | $1.47 | $1.16 |
| 85 | Pavement sler 6" (666-7347) | LF | 380 | $0.50 | $2.79 | $2.20 |
| 86 | Pavement sler 8" (666-7348) | LF | 129 | $0.50 | $2.79 | $2.20 |
| 87 | Pavement sler 24" (666-7352) | LF | 336 | $3.00 | $6.98 | $5.50 |
| 88 | Pavement sler (arrow) (666-7353) | EACH | 4 | $180.00 | $139.54 | $110.00 |
| 89 | Pavement sler (word) (666-7354) | EACH | 3 | $100.00 | $209.30 | $165.00 |
| 90 | Type I high perf PM (W)6"(DOT)(100 mil) (666-7433) | LF | 1,236 | $1.25 | $1.47 | $1.16 |
| 91 | Type I high perf PM (W)8"(DOT)(100 mil) (666-7434) | LF | 128 | $1.50 | $1.74 | $1.38 |
| 92 | Type I high perf PM(W)8"(solid)(100 mil) (666-7435) | LF | 6,104 | $1.25 | $1.74 | $1.38 |
| 93 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 364 | $6.00 | $10.47 | $8.25 |
| 94 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 488 | $6.00 | $10.47 | $8.25 |
| 95 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,511 | $1.00 | $3.49 | $2.75 |
| 96 | Eliminating existing PM & markers (6") (677-7002) | LF | 80 | $0.50 | $3.49 | $2.75 |
| 97 | Eliminating existing PM & markers (8") (677-7004) | LF | 555 | $0.75 | $3.49 | $2.75 |
| 98 | Eliminating existing PM & markers (24") (677-7008) | LF | 362 | $3.00 | $9.07 | $7.15 |
| 99 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 3 | $60.00 | $153.49 | $121.00 |
| 100 | Eliminating existing PM & markers (word) (677-7015) | EACH | 3 | $60.00 | $223.25 | $176.00 |
| 101 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 19 | $25.00 | $48.84 | $38.50 |
| 102 | Pavement surface preparation for marking (6") (678-7002) | LF | 380 | $0.20 | $1.76 | $1.39 |
| 103 | Pavement surface preparation for marking (8") (678-7004) | LF | 129 | $0.20 | $2.79 | $2.20 |
| 104 | Pavement surface preparation for marking (24") (678-7008) | LF | 336 | $1.00 | $5.58 | $4.40 |
| 105 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 4 | $50.00 | $139.54 | $110.00 |
| 106 | Pavement surface preparation for marking (word) (678-7016) | EACH | 3 | $50.00 | $209.30 | $165.00 |
| 107 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $60,000 | $76,743 | $60,500 |
| 108 | Removing traffic signals (680-7004) | EACH | 1 | $8,000.00 | $23,507 | $16,500 |
| 109 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 2 | $350.00 | $488.37 | $385.00 |
| 110 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $350.00 | $488.37 | $385.00 |
| 111 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 2 | $350.00 | $488.37 | $385.00 |
| 112 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $350.00 | $488.37 | $385.00 |
| 113 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 2 | $350.00 | $488.37 | $385.00 |
| 114 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $350.00 | $488.37 | $385.00 |
| 115 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 6 | $225.00 | $209.30 | $165.00 |
| 116 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 360 | $4.00 | $6.98 | $5.50 |
| 117 | Traffic signal CBL (type A)(12 AWG)(20 conductor) (684-7025) | LF | 460 | $10.00 | $13.95 | $11.00 |
| 118 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $18,000 | $38,372 | $30,250 |
| 119 | Ins traffic signal PL AM(S)2 arm(44-36')lum (686-7167) | EACH | 1 | $20,000 | $41,860 | $33,000 |