FL BS (compacted in place)(tya GR1-2)(final pos), TxDOT 247-7176

Low bidders on TxDOT contracts carried a median of $89.71 per CY for this item, over the 24 months to 19 NOV 2026, across 46 low bids. Half of all 268 bids fell between $80.00 and $132.12.

Owner
Texas DOT
Item
247-7176
Unit
CY
Data through
19 NOV 2026

TxDOT prints this item as “FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)”.

TxDOT has bid this work under more than one code: 2476041003 on lettings from 09 JAN 2020 to 05 JAN 2024 (508 bids); 2476041002 on lettings from 06 AUG 2020 to 06 AUG 2020 (5 bids); 2476041005 on lettings from 01 FEB 2024 to 10 JUL 2024 (90 bids); 247-7176 on lettings from 06 NOV 2024 to 04 NOV 2026 (283 bids). They are combined here into one trend.

$89.71Low bidder's median, per CY
$100.00Median of all bids, per CY
46Contracts in the window
$94.00Engineer's estimate, median per CY

By year of letting

FL BS (compacted in place)(tya GR1-2)(final pos), TxDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20202828$66.75136$73.06
20213535$70.00183$71.00
20222828$89.12107$106.00
20232525$98.0082$107.88
20243030$105.50114$102.50
20252525$87.84139$100.00
20262020$93.00125$101.00

Bid prices as published, not adjusted for inflation.

By district

DistrictLow bidsLow-bid medianAll bidsMedian, all bids
Corpus Christi District8$105.5365$124.65
Laredo District8$86.8741$100.00
Abilene District7$62.0041$70.00
Beaumont District6$148.1928$151.89
Fort Worth District5$80.0025$84.00
San Angelo District4$110.9923$110.00
Dallas District4$72.1222$84.00
FL BS (compacted in place)(tya GR1-2)(final pos), TxDOT: unit prices by district, last 24 months

Districts with at least three low bids, over the last 24 months.

By quantity

Quantity (CY)Low bidsLow-bid median
26 to 73311$142.47
792 to 2,98912$110.99
3,503 to 6,79111$70.00
7,803 to 136,21912$75.00
FL BS (compacted in place)(tya GR1-2)(final pos), TxDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

FL BS (compacted in place)(tya GR1-2)(final pos), TxDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractDistrictQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
04 NOV 2026A00206631Bryan District41,907$65.00$82.00$74.007Big Creek Construction, LTD.TxDOT
04 NOV 2026A00212892Dallas District8,384$50.00$60.55$75.006Indus Road & Bridge, Inc.TxDOT
06 AUG 2026A00189724Laredo District30,171$65.00$65.00$75.003Anderson Columbia Co., Inc.TxDOT
06 AUG 2026A00192187Beaumont District135$110.00$215.00$130.006Castillo Aranda LLCTxDOT
06 AUG 2026A00193246San Angelo District1,391$121.98$108.94$90.002Reece Albert, Inc.TxDOT
05 AUG 2026A00136503Laredo District4,503$68.00$73.00$80.0010Relmco, Inc.TxDOT
01 JUL 2026A00131976Fort Worth District2,815$80.00$84.00$100.004Foutsco Paving Company, LLCTxDOT
03 JUN 2026A00190176Corpus Christi District297$175.00$143.70$110.008CK Newberry, LLCTxDOT
02 JUN 2026A00133020Laredo District835$122.50$140.00$90.007James Construction Group, LLCTxDOT
02 JUN 2026A00185027Fort Worth District6,512$84.00$90.00$100.009Foutsco Paving Company, LLCTxDOT
07 MAY 2026A00178374Beaumont District561$175.00$130.00$80.003Skyline Bridge LLCTxDOT
06 MAY 2026A00136586Corpus Christi District262$110.00$127.00$110.0013Delgado'S Contractors, LLCTxDOT
06 MAY 2026A00139927San Angelo District792$100.00$102.50$125.0010Delgado'S Contractors, LLCTxDOT
08 APR 2026A00196681Beaumont District3,758$120.00$151.78$80.005Drewery Construction Company, IncorporatedTxDOT
08 APR 2026A00186409Corpus Christi District1,629$91.00$110.00$98.505Ragle Construction, Inc.TxDOT
Latest TxDOT contracts carrying FL BS (compacted in place)(tya GR1-2)(final pos)

Filter this item by your own quantity, district and period, or check your price against it, in the TxDOT explorer.

How these prices were read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are TxDOT's own: this item is compared with TxDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the TxDOT letting of 19 NOV 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy