James Construction Group, LLC: TxDOT bid record
James Construction Group, LLC submitted 244 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 40 of them (16%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,383,865,980
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 56 | 9 | 16% |
| 2021 | 46 | 9 | 20% |
| 2022 | 30 | 4 | 13% |
| 2023 | 26 | 7 | 27% |
| 2024 | 38 | 6 | 16% |
| 2025 | 21 | 2 | 10% |
| 2026 | 27 | 3 | 11% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 87 | 19 | 22% |
| Yoakum District | 31 | 7 | 23% |
| Waco District | 27 | 6 | 22% |
| Bryan District | 16 | 1 | 6% |
| Austin District | 14 | 0 | 0% |
| Odessa District | 9 | 2 | 22% |
| Laredo District | 9 | 2 | 22% |
| Beaumont District | 7 | 1 | 14% |
| Brownwood District | 6 | 0 | 0% |
| Corpus Christi District | 6 | 0 | 0% |
| Abilene District | 6 | 2 | 33% |
| Tyler District | 6 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Webber, LLC | 55 | 27 of 55 |
| Texas Materials Group, Inc. | 55 | 21 of 55 |
| Angel Brothers Holdings Corp. | 44 | 27 of 44 |
| Knife River Corporation - South | 38 | 28 of 38 |
| Durwood Greene Construction Co. | 36 | 23 of 36 |
| Harper Brothers Construction LLC | 36 | 13 of 36 |
| Pulice Construction, Inc. | 34 | 8 of 34 |
| Ser Construction Partners, LLC | 32 | 15 of 32 |
| Zachry Construction Corporation | 30 | 12 of 30 |
| Hunter Industries, LTD. | 28 | 21 of 28 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00124162 | Bryan District | Bridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch) | 5 of 12 | $39,237,828 | +30% |
| 04 NOV 2026 | A00209149 | Laredo District | Bridge Replacement, MANGANA-HEIN RD (MANGANA HEIN RD to .) | 4 of 7 | $3,261,472 | +14% |
| 07 OCT 2026 | A00196909 | Dallas District | Hazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line) | 6 of 8 | $4,795,686 | +28% |
| 06 OCT 2026 | A00186301 | Waco District | Widen Road - Add Lanes, SL 121 (IH 14 to IH 35) | 3 of 6 | $23,591,027 | +7.0% |
| 02 SEP 2026 | A00121174 | Pharr District | New Arterial, SL 195 (NEW LOCATION, FM 649 to FM 3167) | 6 of 7 | $66,420,210 | +29% |
| 02 SEP 2026 | A00192185 | Houston District | Bridge Replacement, FM 2004 (At Highland Bayou to .) | 2 of 11 | $3,607,643 | +13% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 1 of 9 | $32,673,736 | Low, 4.0% under the second |
| 06 AUG 2026 | A00119935 | Laredo District | Interchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE) | 3 of 4 | $223,527,275 | +9.0% |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 1 of 8 | $25,954,400 | Low, 1.0% under the second |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 2 of 7 | $49,016,785 | 0.0% |
| 05 AUG 2026 | A00136503 | Laredo District | Bridge Replacement, US 83 (1.80 MILES SOUTH OF UVALDE COUNTY LINE to .) | 5 of 10 | $16,236,816 | +18% |
| 02 JUL 2026 | A00027293 | Tyler District | Widen Road - Add Lanes, FM 756 (JEFF DAVIS DR (CR 1167), S to FM 346) | 8 of 9 | $72,854,862 | +24% |
| 01 JUL 2026 | A00190685 | Houston District | Construct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd) | 3 of 11 | $19,827,675 | +2.0% |
| 01 JUL 2026 | A00008199 | Fort Worth District | Interchange Improvement, IH 35W (Bethesda Road to Asher Road) | 2 of 6 | $66,367,596 | +3.0% |
| 01 JUL 2026 | A00058522 | Tyler District | Widen Road - Add Lanes, US 271 (SMITH C/L, SW to FM 16) | 6 of 7 | $105,308,971 | +18% |
| 02 JUN 2026 | A00133020 | Laredo District | Rehabilitate Existing Roadway, FM 1472 (TRADE CENTER BLVD to 0.4 MILES NORTH OF TRADE CENTER BLVD) | 1 of 7 | $2,951,706 | Low, 5.0% under the second |
| 02 JUN 2026 | A00119468 | Laredo District | Construct Direct Connectors, IH 35 (0.187 MI SOUTH OF IH 35/US 59 INT. to 0.205 MI NORTH OF IH 35/ US 59 INT.) | 2 of 6 | $73,054,632 | +5.0% |
| 02 JUN 2026 | A00216194 | Houston District | Construct Pedestrian Infrastructure, BROADWAY ST (At UPRR, Galveston Rd, and Harding St to .) | 3 of 7 | $5,997,727 | +38% |
| 07 MAY 2026 | A00183308 | Pharr District | Interstate Designation, US 281 (7.4 Miles North of SH 186 to 3.9 Miles North of SH 186) | 5 of 5 | $86,174,194 | +39% |
| 07 MAY 2026 | A00109269 | Pharr District | Widen Road - Add Lanes, FM 676 (SH 107 to TAYLOR RD.) | 5 of 6 | $34,414,381 | +39% |
| 06 MAY 2026 | A00136586 | Corpus Christi District | Bridge Replacement, POST OAK RD (STR. (AA0145001) Post Oak Rd to Approx. .30 MI E of FM 1726) | 11 of 13 | $1,499,417 | +32% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 5 of 10 | $132,896,173 | +11% |
| 08 APR 2026 | A00131274 | Waco District | Bridge Replacement, COUNTY ROAD 104 (@ WILLIAMS CREEK to (MAP #2)) | 10 of 10 | $3,132,701 | +73% |
| 07 APR 2026 | A00084334 | Laredo District | Construct New Road, SL 480 (0.259 MILES SOUTH OF US 57 to US 277 N) | 5 of 7 | $117,664,941 | +26% |
| 07 APR 2026 | A00186047 | Waco District | Bridge Replacement, COUNTY ROAD 325 (FCR 461 @ Hog Creek to (MAP #2064)) | 12 of 12 | $1,742,525 | +66% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.