TxDOT contract A00186301 bid tabulation
Widen Road - Add Lanes, SL 121 (IH 14 to IH 35). Let by Texas DOT on October 6, 2026, Bell, Waco District. 6 bids received; low bid $22,052,184 by Big Creek Construction, LTD., -11% against the engineer's estimate of $24,664,269.
- Owner
- Texas DOT
- Letting
- 06 OCT 2026
- Pay items
- 169
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $22,052,184 | Low | -11% |
| 2 | Patin Construction LLC | $23,137,144 | +5.0% | -6.0% |
| 3 | James Construction Group, LLC | $23,591,027 | +7.0% | -4.0% |
| 4 | Texas Materials Group, Inc. | $23,644,285 | +7.0% | -4.0% |
| 5 | Jordan Foster Construction, LLC | $24,381,341 | +11% | -1.0% |
| 6 | Joe Bland Construction LLC | $25,178,796 | +14% | +2.0% |
Engineer's estimate: $24,664,269.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Patin Construction LLC | 3. James Construction Group, LLC | 4. Texas Materials Group, Inc. | 5. Jordan Foster Construction, LLC | 6. Joe Bland Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 101 | $2,700.00 | $550.00 | $1,800.00 | $15,708 | $500.00 | $10,000 | $1,250.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 3,362 | $12.00 | $12.00 | $25.00 | $10.50 | $31.00 | $17.00 | $30.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 55 | $16.00 | $16.00 | $25.00 | $27.37 | $57.00 | $18.00 | $30.00 |
| 4 | Removing concrete (medians) (104-7008) | SY | 370 | $14.50 | $20.00 | $25.00 | $17.54 | $19.00 | $7.80 | $35.00 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 3,753 | $17.55 | $15.00 | $22.00 | $14.12 | $25.00 | $16.00 | $35.00 |
| 6 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 223 | $22.00 | $18.00 | $25.00 | $25.41 | $41.00 | $11.00 | $40.00 |
| 7 | Removing concrete (curb) (104-7016) | LF | 1,782 | $7.00 | $5.00 | $5.00 | $2.96 | $14.00 | $6.75 | $8.00 |
| 8 | Removing concrete (curb & gutter) (104-7017) | LF | 341 | $8.00 | $8.00 | $5.00 | $15.82 | $18.00 | $12.30 | $8.00 |
| 9 | Removing concrete (miscellaneous) (104-7046) | SY | 320 | $20.00 | $25.00 | $25.00 | $5.86 | $29.00 | $21.00 | $40.00 |
| 10 | Remove (13") TRT/untrt base & asphalt pavement (105-7033) | SY | 4,365 | $4.40 | $8.25 | $7.00 | $6.45 | $4.00 | $9.35 | $6.00 |
| 11 | Remove (0"-9") TRT/untrt base & asphalt pavement (105-7049) | SY | 51,385 | $10.00 | $5.00 | $7.00 | $2.14 | $2.70 | $4.20 | $5.00 |
| 12 | Excavation (roadway) (110-7001) | CY | 21,125 | $12.45 | $18.00 | $10.00 | $18.50 | $12.00 | $8.00 | $12.00 |
| 13 | Embankment (final)(OC)(type C) (132-7005) | CY | 33,581 | $21.00 | $18.00 | $34.00 | $12.34 | $15.00 | $20.00 | $40.00 |
| 14 | Furn & place topsoil (4") (160-7002) | SY | 53,147 | $1.50 | $1.00 | $2.00 | $1.23 | $3.30 | $2.25 | $1.00 |
| 15 | Block sodding (162-7002) | SY | 53,147 | $4.00 | $4.25 | $14.00 | $2.00 | $3.97 | $4.20 | $7.50 |
| 16 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 53,147 | $0.40 | $0.40 | $1.00 | $0.52 | $0.37 | $0.38 | $0.50 |
| 17 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 53,147 | $0.70 | $0.40 | $1.00 | $0.52 | $0.37 | $0.38 | $0.50 |
| 18 | Vegetative watering (168-7001) | TGL | 1,294 | $10.00 | $25.00 | $25.00 | $32.26 | $38.00 | $43.00 | $60.00 |
| 19 | Soil ret BLKT(SL_steep_clay_short) (169-7005) | SY | 1,113 | $5.00 | $1.60 | $3.00 | $1.10 | $1.45 | $2.00 | $1.50 |
| 20 | FL BS (compacted in place)(type D GR 5)(final pos) (247-7191) | CY | 13,600 | $61.00 | $57.00 | $70.00 | $60.28 | $69.20 | $59.00 | $84.00 |
| 21 | Lime (com or QK)(slurry) (260-7005) | TON | 1,600 | $310.00 | $350.00 | $380.00 | $443.05 | $340.00 | $350.00 | $405.00 |
| 22 | Lime TRT (subgrade) (8") (260-7020) | SY | 81,571 | $6.00 | $4.30 | $8.00 | $5.44 | $8.00 | $5.00 | $14.00 |
| 23 | Emuls asphalt (BS or subgr TRT)(CSS-1H) (314-7004) | GAL | 97,880 | $6.15 | $5.25 | $2.50 | $3.01 | $4.20 | $4.25 | $11.00 |
| 24 | Fog seal (CSS-1H) (315-7004) | GAL | 8,161 | $4.00 | $5.00 | $3.00 | $2.25 | $8.00 | $2.35 | $2.50 |
| 25 | Asphalt (CRS-2P) (316-7012) | GAL | 45,074 | $5.00 | $4.00 | $4.00 | $3.00 | $4.30 | $3.10 | $3.50 |
| 26 | Aggregate (type-D or L, GR-4) (316-7253) | CY | 559 | $200.00 | $120.00 | $280.00 | $245.00 | $221.00 | $250.00 | $280.00 |
| 27 | D-GR HMA type-B PG64-22 (341-7001) | TON | 13,060 | $88.00 | $90.00 | $103.00 | $90.00 | $132.00 | $94.00 | $98.00 |
| 28 | Tack coat (341-7082) | GAL | 7,572 | $4.00 | $3.60 | $5.00 | $3.75 | $3.30 | $3.95 | $4.25 |
| 29 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 8,642 | $140.00 | $110.00 | $130.00 | $112.00 | $165.00 | $115.00 | $128.00 |
| 30 | Concrete pavement (CRCP) (12") (360-7006) | SY | 831 | $100.00 | $140.00 | $125.00 | $172.11 | $132.00 | $180.00 | $180.00 |
| 31 | Concrete pavement(transition slab) (12") (360-7035) | SY | 128 | $225.00 | $245.00 | $125.00 | $210.48 | $296.00 | $230.00 | $190.00 |
| 32 | Cem stabil BKFL (400-7010) | CY | 7,572 | $180.00 | $155.00 | $250.00 | $154.92 | $200.00 | $154.00 | $168.00 |
| 33 | Cement stab backfill (inlet or MH) (400-7011) | CY | 396 | $110.00 | $195.00 | $250.00 | $154.92 | $200.00 | $195.00 | $175.00 |
| 34 | Trench excavation protection (402-7001) | LF | 14,187 | $6.00 | $10.00 | $5.00 | $1.84 | $1.00 | $3.40 | $5.00 |
| 35 | Temporary special shoring (403-7001) | SF | 4,460 | $22.00 | $30.00 | $40.00 | $19.01 | $28.00 | $45.00 | $20.00 |
| 36 | Drilled shaft (30 in) (416-7005) | LF | 400 | $300.00 | $800.00 | $350.00 | $726.87 | $293.00 | $785.00 | $385.00 |
| 37 | Riprap (concrete)(4 in) (432-7001) | CY | 1,178 | $531.00 | $610.00 | $500.00 | $457.62 | $595.00 | $735.00 | $500.00 |
| 38 | Riprap (concrete)(CL B) (432-7005) | CY | 17.50 | $620.00 | $830.00 | $500.00 | $1,063.06 | $630.00 | $800.00 | $715.00 |
| 39 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 120 | $800.00 | $630.00 | $600.00 | $654.84 | $630.00 | $630.00 | $495.00 |
| 40 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 10 | $200.00 | $250.00 | $250.00 | $252.33 | $350.00 | $350.00 | $225.00 |
| 41 | Riprap (stone common)(dry)(24 in) (432-7034) | CY | 198 | $205.00 | $165.00 | $300.00 | $190.99 | $227.00 | $180.00 | $175.00 |
| 42 | Rail (handrail)(type F) (450-7063) | LF | 1,255 | $130.00 | $190.00 | $185.00 | $180.31 | $146.00 | $185.00 | $180.00 |
| 43 | Concrete box culvert (5 FT X 4 FT) (462-7008) | LF | 139 | $602.00 | $445.00 | $550.00 | $529.97 | $498.00 | $620.00 | $740.00 |
| 44 | Concrete box culvert (8 FT X 5 FT) (462-7022) | LF | 20 | $850.00 | $885.00 | $950.00 | $1,009.10 | $866.00 | $1,100.00 | $1,295.00 |
| 45 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,223 | $100.00 | $75.00 | $70.00 | $116.58 | $59.00 | $92.00 | $100.00 |
| 46 | RC pipe (CL III)(24 in) (464-7005) | LF | 8,548 | $100.00 | $90.00 | $90.00 | $138.34 | $76.00 | $105.00 | $120.00 |
| 47 | RC pipe (CL III)(30 in) (464-7007) | LF | 766 | $140.00 | $120.00 | $110.00 | $153.65 | $109.00 | $135.00 | $150.00 |
| 48 | RC pipe (CL III)(36 in) (464-7009) | LF | 1,625 | $175.00 | $165.00 | $150.00 | $197.33 | $162.00 | $240.00 | $195.00 |
| 49 | RC pipe (CL III)(42 in) (464-7010) | LF | 826 | $190.00 | $222.00 | $200.00 | $255.36 | $228.00 | $215.00 | $250.00 |
| 50 | RC pipe (CL III)(48 in) (464-7011) | LF | 403 | $230.00 | $254.00 | $250.00 | $302.19 | $289.00 | $285.00 | $300.00 |
| 51 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 7 | $8,683.00 | $5,825.00 | $7,000.00 | $7,045.24 | $5,722.00 | $9,200.00 | $10,000 |
| 52 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 1 | $6,493.00 | $4,500.00 | $6,000.00 | $9,453.08 | $5,056.00 | $7,800.00 | $8,500.00 |
| 53 | Inlet (complete)(pco)(5FT)(left) (465-7022) | EACH | 53 | $12,404 | $10,510 | $8,000.00 | $12,655 | $7,335.00 | $9,700.00 | $7,750.00 |
| 54 | Inlet (complete)(pco)(5FT)(right) (465-7023) | EACH | 41 | $12,404 | $10,690 | $8,000.00 | $12,867 | $7,329.00 | $9,700.00 | $7,750.00 |
| 55 | Inlet (complete)(pazd)(RC)(3FTX3FT) (465-7152) | EACH | 1 | $5,793.00 | $5,750.00 | $6,000.00 | $8,579.12 | $4,012.00 | $6,300.00 | $5,750.00 |
| 56 | Inlet (complete)(pazd)(RC)(4FTX4FT) (465-7153) | EACH | 2 | $7,955.00 | $6,500.00 | $6,000.00 | $9,382.43 | $3,612.00 | $7,400.00 | $8,000.00 |
| 57 | Junction box (complete)(11FT X 6FT) (465-7379) | EACH | 1 | $40,000 | $23,500 | $33,000 | $36,027 | $31,562 | $20,000 | $35,000 |
| 58 | Headwall (CH - FW - 0) (diameter= 30 in) (466-7007) | EACH | 1 | $7,000.00 | $7,825.00 | $4,500.00 | $10,791 | $6,000.00 | $11,000 | $7,500.00 |
| 59 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 2 | $12,030 | $9,830.00 | $5,500.00 | $16,695 | $13,000 | $17,000 | $5,750.00 |
| 60 | Headwall (CH - FW - 15) (diameter= 48 in) (466-7026) | EACH | 2 | $15,500 | $9,125.00 | $5,500.00 | $11,687 | $11,200 | $21,000 | $6,750.00 |
| 61 | Headwall (CH - FW - A - 0) (des= 3) (466-7063) | EACH | 1 | $850.00 | $8,575.00 | $5,500.00 | $10,935 | $14,300 | $16,000 | $7,750.00 |
| 62 | Headwall (CH - PW - S) (diameter= 30 in) (466-7118) | EACH | 1 | $13,000 | $8,750.00 | $4,500.00 | $11,246 | $9,700.00 | $12,000 | $7,750.00 |
| 63 | Headwall (CH - PW - S) (diameter= 42 in) (466-7121) | EACH | 2 | $1,400.00 | $12,500 | $5,500.00 | $19,405 | $15,000 | $23,000 | $9,500.00 |
| 64 | Wingwall (FW - 0) (HW=6 FT) (466-7148) | EACH | 1 | $14,000 | $13,400 | $15,000 | $11,898 | $12,900 | $32,000 | $12,250 |
| 65 | Wingwall (FW - 0) (HW=7 FT) (466-7149) | EACH | 1 | $22,113 | $19,325 | $17,000 | $17,746 | $18,250 | $37,000 | $17,750 |
| 66 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 5 | $1,174.00 | $1,200.00 | $2,500.00 | $2,041.44 | $1,158.00 | $2,200.00 | $3,500.00 |
| 67 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 1 | $2,138.00 | $1,390.00 | $3,000.00 | $1,852.82 | $1,107.00 | $3,200.00 | $4,000.00 |
| 68 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 1 | $3,311.00 | $1,620.00 | $3,000.00 | $2,153.23 | $1,107.00 | $3,300.00 | $4,500.00 |
| 69 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 11 | $1,699.00 | $1,620.00 | $3,000.00 | $2,151.55 | $1,107.00 | $3,300.00 | $4,500.00 |
| 70 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 2 | $2,842.00 | $2,700.00 | $3,500.00 | $5,123.35 | $2,993.00 | $3,500.00 | $6,500.00 |
| 71 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 3 | $4,445.00 | $3,300.00 | $3,500.00 | $5,853.86 | $3,210.00 | $3,700.00 | $7,500.00 |
| 72 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $3,166.00 | $2,750.00 | $3,500.00 | $6,227.32 | $3,745.00 | $3,700.00 | $7,500.00 |
| 73 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 1 | $3,940.00 | $3,350.00 | $4,000.00 | $5,644.31 | $4,100.00 | $4,700.00 | $7,500.00 |
| 74 | Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367) | EACH | 1 | $7,372.00 | $4,630.00 | $4,000.00 | $7,171.96 | $4,943.00 | $7,300.00 | $10,500 |
| 75 | Set (type II) (42 in) (RCP) (6: 1) (C) (467-7379) | EACH | 2 | $7,000.00 | $6,200.00 | $5,000.00 | $7,500.09 | $10,800 | $15,000 | $13,150 |
| 76 | Set (removing & reinstall) (467-7472) | EACH | 8 | $390.00 | $1,000.00 | $1,500.00 | $1,512.13 | $675.00 | $3,000.00 | $2,250.00 |
| 77 | Removing & RE - lay pipe (15 in) (472-7003) | LF | 86 | $100.00 | $60.00 | $80.00 | $70.10 | $43.00 | $126.00 | $150.00 |
| 78 | Removing & RE - lay pipe (18 in) (472-7004) | LF | 210 | $41.00 | $60.00 | $80.00 | $57.41 | $50.00 | $88.00 | $150.00 |
| 79 | Removing & RE - lay pipe (24 in) (472-7006) | LF | 58 | $81.00 | $67.00 | $80.00 | $103.93 | $70.00 | $125.00 | $150.00 |
| 80 | Cast-in-place trench drain (474-7021) | LF | 40 | $213.00 | $600.00 | $150.00 | $446.78 | $387.00 | $800.00 | $750.00 |
| 81 | Adjusting manholes (479-7001) | EACH | 6 | $1,600.00 | $2,200.00 | $500.00 | $2,152.08 | $1,800.00 | $2,300.00 | $1,250.00 |
| 82 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,121.65 | $1,280.00 | $1,500.00 | $1,060.29 | $700.00 | $940.00 | $1,625.00 |
| 83 | Removing structure (set) (496-7004) | EACH | 52 | $457.00 | $325.00 | $500.00 | $903.27 | $170.00 | $500.00 | $1,025.00 |
| 84 | Removing structure (headwall) (496-7006) | EACH | 1 | $1,126.25 | $1,500.00 | $1,500.00 | $4,224.84 | $1,000.00 | $3,900.00 | $1,625.00 |
| 85 | Removing structure (pipe) (496-7007) | LF | 3,267 | $12.00 | $17.50 | $40.00 | $24.11 | $8.00 | $12.00 | $50.00 |
| 86 | Mobilization (500-7001) | LS | 1 | $2,244,429 | $2,100,000 | $200,000 | $2,353,364 | $2,360,000 | $2,422,892 | $1,050,000 |
| 87 | Barricades, signs and traffic handling (502-7001) | MO | 36 | $12,000 | $3,100.00 | $2,500.00 | $6,635.69 | $2,500.00 | $10,000 | $1,750.00 |
| 88 | Portable changeable message sign (503-7002) | EACH | 2 | $7,264.00 | $8,500.00 | $60,000 | $16,830 | $20,000 | $20,000 | $8,750.00 |
| 89 | TMA (stationary) (505-7001) | DAY | 50 | $260.00 | $200.00 | $300.00 | $350.31 | $170.00 | $550.00 | $215.00 |
| 90 | TMA (mobile operation) (505-7002) | HR | 384 | $60.00 | $100.00 | $200.00 | $175.31 | $14.00 | $120.00 | $145.00 |
| 91 | Rock filter dams (install) (type 2) (506-7002) | LF | 640 | $51.00 | $40.00 | $60.00 | $38.00 | $45.00 | $47.00 | $40.00 |
| 92 | Rock filter dams (remove) (506-7011) | LF | 640 | $18.00 | $6.00 | $10.00 | $10.00 | $20.00 | $21.00 | $15.00 |
| 93 | Construction exits (install) (type 2) (506-7021) | SY | 446 | $30.00 | $70.00 | $10.00 | $45.00 | $45.00 | $47.00 | $115.00 |
| 94 | Construction exits (remove) (506-7024) | SY | 446 | $10.00 | $9.00 | $5.00 | $20.00 | $20.00 | $21.00 | $30.00 |
| 95 | Temporary sediment control fence (install) (506-7039) | LF | 9,041 | $3.00 | $3.30 | $4.00 | $3.75 | $3.59 | $3.75 | $5.00 |
| 96 | Temporary sediment control fence (remove) (506-7041) | LF | 9,041 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $2.00 |
| 97 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,335 | $4.50 | $5.50 | $7.00 | $5.25 | $8.50 | $8.95 | $8.00 |
| 98 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,335 | $1.00 | $1.00 | $2.00 | $1.00 | $2.00 | $2.10 | $2.00 |
| 99 | Constructing detours (508-7001) | SY | 28,268 | $93.00 | $58.00 | $41.00 | $48.62 | $65.00 | $50.00 | $52.00 |
| 100 | One-way traffic control (port traffic signal) (510-7003) | MO | 3 | $4,500.00 | $4,500.00 | $8,000.00 | $10,000 | $9,000.00 | $5,700.00 | $7,500.00 |
| 101 | Portable concrete traffic barrier (des source)(low prof)(type 1) (512-7021) | LF | 14,460 | $14.00 | $10.00 | $35.00 | $9.33 | $16.00 | $13.65 | $20.00 |
| 102 | Portable concrete traffic barrier (des source)(low prof)(type 2) (512-7022) | LF | 920 | $20.00 | $10.00 | $70.00 | $13.35 | $26.00 | $54.00 | $10.00 |
| 103 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 16,900 | $7.00 | $4.00 | $10.00 | $6.40 | $12.50 | $5.40 | $15.00 |
| 104 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 1,480 | $7.00 | $4.00 | $10.00 | $7.90 | $22.00 | $14.35 | $15.00 |
| 105 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 14,460 | $11.00 | $9.25 | $10.00 | $6.88 | $13.50 | $8.00 | $20.00 |
| 106 | Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046) | LF | 920 | $21.00 | $9.25 | $10.00 | $6.88 | $13.00 | $13.50 | $20.00 |
| 107 | Concrete curb & gutter (type II) (529-7009) | LF | 20,150 | $34.00 | $27.00 | $20.00 | $24.75 | $32.00 | $20.85 | $22.00 |
| 108 | Concrete curb (dowel)(mod) (529-7034) | LF | 17,689 | $28.00 | $25.00 | $25.00 | $10.69 | $7.00 | $35.80 | $24.00 |
| 109 | Driveways (concrete) (530-7006) | SY | 2,926 | $105.00 | $102.00 | $120.00 | $102.69 | $100.00 | $122.00 | $130.00 |
| 110 | Driveways (ACP) (530-7010) | SY | 2,892 | $41.00 | $50.00 | $55.00 | $58.52 | $75.30 | $77.00 | $60.00 |
| 111 | Concrete sidewalks (5") (531-7002) | SY | 15,884 | $67.00 | $74.00 | $74.00 | $74.73 | $71.35 | $78.00 | $63.00 |
| 112 | Curb ramps (type 1) (531-7005) | EACH | 1 | $2,800.00 | $2,550.00 | $2,500.00 | $3,192.18 | $2,200.00 | $3,300.00 | $2,000.00 |
| 113 | Curb ramps (type 2) (531-7006) | EACH | 3 | $2,800.00 | $2,900.00 | $2,500.00 | $3,525.16 | $2,400.00 | $3,400.00 | $2,000.00 |
| 114 | Curb ramps (type 7) (531-7010) | EACH | 8 | $3,000.00 | $2,625.00 | $2,500.00 | $3,525.16 | $2,300.00 | $3,500.00 | $2,750.00 |
| 115 | Curb ramps (type 10) (531-7011) | EACH | 4 | $2,800.00 | $2,300.00 | $2,500.00 | $3,525.17 | $2,100.00 | $2,300.00 | $2,750.00 |
| 116 | Curb ramps (type 21) (531-7013) | EACH | 1 | $3,500.00 | $500.00 | $2,500.00 | $3,525.22 | $4,300.00 | $3,500.00 | $1,750.00 |
| 117 | Curb ramps (type 22) (531-7014) | EACH | 2 | $5,000.00 | $500.00 | $2,500.00 | $5,842.76 | $4,800.00 | $3,500.00 | $5,500.00 |
| 118 | Concrete median (536-7002) | SY | 55 | $73.00 | $140.00 | $100.00 | $68.13 | $92.00 | $220.00 | $115.00 |
| 119 | Concrete directional island (12") (536-7007) | LF | 100 | $95.00 | $150.00 | $50.00 | $98.86 | $132.00 | $205.00 | $300.00 |
| 120 | Relocate existing mailbox (560-7012) | EACH | 8 | $283.00 | $240.00 | $500.00 | $289.00 | $350.00 | $470.00 | $825.00 |
| 121 | In RD IL (type SA) 40T-12 (250W EQ) LED (610-7128) | EACH | 50 | $5,360.00 | $6,200.00 | $5,500.00 | $5,656.00 | $5,020.00 | $6,100.00 | $5,900.00 |
| 122 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 4,925 | $13.00 | $15.00 | $15.00 | $13.64 | $17.50 | $14.50 | $14.00 |
| 123 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 13,390 | $15.00 | $12.00 | $15.00 | $10.50 | $9.65 | $11.25 | $15.00 |
| 124 | Conduit (PVC) (schedule 40) (3") (concrete encse) (618-7038) | LF | 3,068 | $22.00 | $18.50 | $20.00 | $16.75 | $17.10 | $18.00 | $19.00 |
| 125 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 2,705 | $15.00 | $27.50 | $35.00 | $25.00 | $52.60 | $27.00 | $35.00 |
| 126 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 6,086 | $30.00 | $28.50 | $60.00 | $26.00 | $41.95 | $28.00 | $38.00 |
| 127 | ITS multi-duct CND (PVC-40) (619-7001) | LF | 13,290 | $25.00 | $19.25 | $40.00 | $17.50 | $20.55 | $19.00 | $40.00 |
| 128 | ITS multi-duct CND (PVC-40)(concrete encse) (619-7003) | LF | 3,068 | $20.00 | $26.75 | $50.00 | $24.25 | $29.10 | $26.00 | $50.00 |
| 129 | ITS multi-duct CND (PVC-80)(bore) (619-7006) | LF | 6,086 | $47.00 | $38.50 | $58.00 | $35.00 | $55.50 | $37.00 | $58.00 |
| 130 | Fiber optic cable road marker (619-7013) | LF | 35 | $216.00 | $46.00 | $200.00 | $42.00 | $172.75 | $46.00 | $180.00 |
| 131 | Electrical conductor (no.14) insulated (620-7002) | LF | 11,407 | $1.00 | $1.65 | $2.00 | $1.50 | $2.40 | $1.65 | $1.50 |
| 132 | Electrical conductor (no.12) bare (620-7003) | LF | 7,760 | $2.00 | $1.45 | $2.00 | $1.30 | $2.52 | $1.40 | $1.75 |
| 133 | Electrical conductor (no.12) insulated (620-7004) | LF | 15,520 | $2.00 | $1.95 | $2.00 | $1.75 | $2.52 | $2.00 | $2.00 |
| 134 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 33 | $4,700.00 | $5,700.00 | $5,500.00 | $5,167.00 | $5,161.00 | $5,590.00 | $5,650.00 |
| 135 | ITS GND box(pcast) type 2 (366060)W/aprn (623-7012) | EACH | 2 | $12,300 | $8,500.00 | $8,500.00 | $7,702.00 | $8,387.00 | $8,400.00 | $8,825.00 |
| 136 | Ground box type A (122311)W/apron (624-7002) | EACH | 31 | $1,304.00 | $1,700.00 | $1,500.00 | $1,545.00 | $2,468.00 | $1,675.00 | $1,425.00 |
| 137 | Elc SRV type A 120/240 060(NS)SS(E)SP(U) (628-7010) | EACH | 6 | $9,600.00 | $8,800.00 | $10,000 | $8,004.00 | $14,510 | $8,665.00 | $9,250.00 |
| 138 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 32 | $650.00 | $715.00 | $1,000.00 | $647.00 | $647.33 | $680.00 | $750.00 |
| 139 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $750.00 | $825.00 | $1,000.00 | $750.00 | $750.00 | $800.00 | $875.00 |
| 140 | Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033) | EACH | 1 | $1,450.00 | $935.00 | $1,100.00 | $850.00 | $850.00 | $900.00 | $995.00 |
| 141 | Install small roadside sign support and assembly TYS80(1)SB(T) (644-7040) | EACH | 2 | $1,000.00 | $950.00 | $1,100.00 | $866.00 | $866.00 | $915.00 | $1,015.00 |
| 142 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 12 | $800.00 | $500.00 | $700.00 | $450.00 | $450.00 | $475.00 | $525.00 |
| 143 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $700.00 | $500.00 | $700.00 | $450.00 | $450.00 | $475.00 | $525.00 |
| 144 | Remove SM RD SN sup&AM (644-7073) | EACH | 36 | $110.00 | $100.00 | $125.00 | $90.00 | $90.00 | $95.00 | $105.00 |
| 145 | Relocate lrsa (647-7002) | EACH | 1 | $5,000.00 | $6,500.00 | $10,000 | $8,200.00 | $8,200.00 | $10,500 | $9,775.00 |
| 146 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 2,267 | $6.00 | $5.00 | $5.00 | $4.50 | $3.11 | $4.75 | $4.00 |
| 147 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 758 | $5.00 | $5.00 | $5.00 | $4.50 | $3.03 | $4.75 | $3.50 |
| 148 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 333 | $1.00 | $1.10 | $1.00 | $1.00 | $0.87 | $1.05 | $1.00 |
| 149 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 67,232 | $1.00 | $0.55 | $1.00 | $0.50 | $0.60 | $0.55 | $1.00 |
| 150 | Work zone pavement marking removing (Y)6"(broken) (662-7098) | LF | 85 | $1.00 | $1.10 | $1.00 | $1.00 | $0.77 | $1.10 | $1.00 |
| 151 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 30,176 | $1.00 | $0.55 | $1.00 | $0.50 | $0.60 | $0.52 | $1.00 |
| 152 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 1,944 | $1.00 | $1.10 | $2.00 | $1.00 | $1.11 | $1.05 | $1.25 |
| 153 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 6,285 | $1.00 | $0.85 | $2.00 | $0.78 | $0.99 | $0.85 | $1.25 |
| 154 | Reflectorized pavement marking type I (W)18"(solid)(100MIL) (666-7033) | LF | 100 | $6.00 | $1.65 | $7.00 | $1.50 | $5.75 | $1.60 | $6.50 |
| 155 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 589 | $6.00 | $12.75 | $10.00 | $12.00 | $7.01 | $12.60 | $8.25 |
| 156 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 13 | $36.00 | $60.00 | $50.00 | $55.00 | $35.00 | $57.00 | $40.00 |
| 157 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 1,974 | $0.65 | $0.75 | $1.00 | $0.68 | $0.80 | $0.70 | $1.00 |
| 158 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 18,621 | $1.00 | $0.75 | $1.00 | $0.66 | $0.71 | $0.70 | $1.00 |
| 159 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 18,717 | $1.00 | $0.75 | $1.00 | $0.66 | $0.73 | $0.70 | $1.00 |
| 160 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 58 | $180.00 | $240.00 | $500.00 | $220.00 | $275.00 | $230.00 | $325.00 |
| 161 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 49 | $230.00 | $300.00 | $500.00 | $275.00 | $300.00 | $285.00 | $350.00 |
| 162 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 406 | $5.00 | $8.50 | $7.00 | $8.00 | $5.67 | $8.40 | $6.50 |
| 163 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 93 | $4.00 | $7.00 | $10.00 | $6.00 | $6.11 | $6.85 | $7.00 |
| 164 | Full - width mowing (730-7019) | CYC | 6 | $3,200.00 | $4,100.00 | $1,500.00 | $4,200.00 | $1,900.00 | $3,500.00 | $4,000.00 |
| 165 | Tree trimming / brush removal (752-7001) | MI | 1.95 | $1,715.00 | $18,750 | $10,000 | $5,000.00 | $9,000.00 | $4,000.00 | $10,250 |
| 166 | System integration (6009-7001) | LS | 1 | $26,835 | $12,880 | $62,000 | $11,713 | $83,420 | $12,600 | $64,500 |
| 167 | Fiber optic fusion splice (6027-7004) | EACH | 576 | $67.00 | $71.00 | $60.00 | $65.00 | $69.45 | $70.00 | $60.00 |
| 168 | Fiber optic CBL(single-mode)(144 fiber) (6027-7006) | LF | 25,498 | $4.00 | $9.75 | $6.00 | $8.90 | $5.11 | $9.60 | $6.00 |
| 169 | Fiber optic patch panel (144 positions) (6027-7008) | EACH | 2 | $3,000.00 | $3,000.00 | $7,500.00 | $2,748.00 | $7,240.00 | $3,400.00 | $7,750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 6, 2026. Compiled by Mirage Metrics.