Pulice Construction, Inc.: TxDOT bid record
Pulice Construction, Inc. submitted 63 bids on Texas DOT contracts in the data, from 08 MAY 2020 to 03 NOV 2026, and was the low bidder on 4 of them (6%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $910,227,565
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 0 | 0% |
| 2023 | 13 | 1 | 8% |
| 2024 | 7 | 1 | 14% |
| 2025 | 16 | 0 | 0% |
| 2026 | 12 | 1 | 8% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 16 | 0 | 0% |
| Pharr District | 8 | 0 | 0% |
| Odessa District | 5 | 1 | 20% |
| Yoakum District | 5 | 1 | 20% |
| Austin District | 5 | 0 | 0% |
| Laredo District | 4 | 1 | 25% |
| Tyler District | 3 | 0 | 0% |
| San Antonio District | 3 | 0 | 0% |
| El Paso District | 2 | 0 | 0% |
| Dallas District | 2 | 0 | 0% |
| Atlanta District | 1 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pavement surface preparation for marking (6") | 678-7002 | LF | 40 | 24 (60%) | $0.10 | $0.18 |
| Eliminating existing pavement marking & markers (4") | 677-6001 | LF | 32 | 23 (72%) | $0.42 | $0.60 |
| Pavement surface preparation for marking (8") | 678-7004 | LF | 35 | 21 (60%) | $0.15 | $0.20 |
| Barricades, signs and traffic handling | 502-7001 | MO | 63 | 19 (30%) | $14,024 | $5,000.00 |
| Constructing detours | 508-7001 | SY | 46 | 19 (41%) | $79.66 | $87.00 |
| Excavation (roadway) | 110-7001 | CY | 61 | 18 (30%) | $7.70 | $20.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 52 | 18 (35%) | $92.92 | $110.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 57 | 17 (30%) | $0.97 | $1.00 |
| Reflectorized pavement marker type II-C-R | 672-7006 | EACH | 56 | 17 (30%) | $5.92 | $5.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 50 | 17 (34%) | $5.77 | $5.00 |
| Construction exits (remove) | 506-7024 | SY | 59 | 16 (27%) | $11.48 | $10.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 55 | 16 (29%) | $1.11 | $1.40 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Webber, LLC | 41 | 27 of 41 |
| James Construction Group, LLC | 34 | 26 of 34 |
| Zachry Construction Corporation | 23 | 11 of 23 |
| Harper Brothers Construction LLC | 15 | 10 of 15 |
| Posillico Civil, Inc. | 15 | 12 of 15 |
| Williams Brothers Construction Co., Inc. | 12 | 6 of 12 |
| Ser Construction Partners, LLC | 10 | 10 of 10 |
| Granite Construction Company | 10 | 6 of 10 |
| Ragle Construction, Inc. | 8 | 5 of 8 |
| Sundt Construction, Inc. | 7 | 6 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00184974 | Austin District | Highway Improvement, IH 35 (US 290 E to Martin Luther King Jr Blvd) | 2 of 6 | $415,739,567 | +1.0% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 8 of 9 | $38,957,868 | +19% |
| 06 AUG 2026 | A00119935 | Laredo District | Interchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE) | 1 of 4 | $205,813,981 | Low, 5.0% under the second |
| 05 AUG 2026 | A00191471 | Houston District | Construct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd) | 7 of 8 | $30,924,993 | +19% |
| 05 AUG 2026 | A00007222 | Fort Worth District | Reconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W) | 8 of 11 | $72,923,640 | +10% |
| 05 AUG 2026 | A00068611 | Houston District | Widen Road - Add Lanes, UA 90 (FM 359 to W of SH 99) | 7 of 7 | $62,267,803 | +28% |
| 02 JUL 2026 | A00124174 | Lubbock District | Convert Non-Freeway, FM 1585 (CR 2240 (AVE U) to 0.5 MI EAST OF US 87) | 5 of 5 | $307,007,227 | +39% |
| 06 MAY 2026 | A00014162 | Dallas District | Widen Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road) | 5 of 9 | $125,812,989 | +13% |
| 08 APR 2026 | A00133118 | Houston District | Widen Road - Add Lanes, SH 99 (IH 10(W) to West Road) | 6 of 10 | $132,992,475 | +11% |
| 07 APR 2026 | A00084334 | Laredo District | Construct New Road, SL 480 (0.259 MILES SOUTH OF US 57 to US 277 N) | 7 of 7 | $129,770,435 | +39% |
| 04 FEB 2026 | A00121975 | Houston District | Highway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290) | 8 of 10 | $90,359,704 | +22% |
| 07 JAN 2026 | A00059128 | Tyler District | Interchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590)) | 6 of 7 | $241,876,186 | +22% |
| 03 DEC 2025 | A00186339 | San Antonio District | Widen Road - Add Lanes, IH 35 (N. Walters St. to IH 410 S) | 2 of 5 | $279,695,015 | +26% |
| 06 NOV 2025 | A00062085 | Austin District | Construct Bridge, SL 360 (AT COURTYARD DRIVE to .) | 7 of 8 | $73,184,566 | +7.0% |
| 05 NOV 2025 | A00004604 | Waco District | Widen Road - Add Lanes, US 190 (CORYELL COUNTY LINE to US 190 W OF CLARK RD) | 4 of 7 | $120,346,064 | +12% |
| 09 OCT 2025 | A00020886 | Brownwood District | Widen Road - Add Lanes And Shoulders, US 183 (8.53 MI. NORTHWEST OF LAMPASAS to US 281) | 6 of 7 | $68,559,981 | +25% |
| 08 OCT 2025 | A00062536 | Abilene District | Interchange Improvement (New Or Update), US 83 (AT to US 83/84 "Y" INTERCHANGE) | 6 of 9 | $77,537,913 | +7.0% |
| 05 SEP 2025 | A00121173 | Pharr District | New Arterial, SL 195 (NEW LOCATION, FM 3167 to FM 755) | 2 of 6 | $62,715,991 | +1.0% |
| 05 SEP 2025 | A00063821 | Tyler District | Bridge Replacement, IH 20 (.955 MI W OF SABINE RIVER to .842 MI E OF SABINE RIVER) | 6 of 10 | $43,513,669 | +18% |
| 04 SEP 2025 | A00127796 | Amarillo District | Construct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE) | 5 of 6 | $150,709,099 | +51% |
| 04 SEP 2025 | A00128327 | Pharr District | Widen Road - Add Lanes, SH 107 (SH 495 to FM 1924) | 7 of 7 | $44,983,965 | +39% |
| 01 JUL 2025 | A00125991 | Corpus Christi District | Construct New Roadway Lanes, US 77 (1.5 MI N. OF SH 285 INTERSECTION to KENEDY/KLEBERG COUNTY LINE) | 2 of 6 | $179,222,220 | 0.0% |
| 05 JUN 2025 | A00011238 | San Antonio District | Widen Road - Add Lanes, US 90 (LP 1604 to 0.8 MILES W OF IH 410) | 7 of 9 | $139,832,027 | +13% |
| 04 JUN 2025 | A00060771 | Austin District | Highway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE) | 5 of 9 | $64,374,438 | +10% |
| 02 MAY 2025 | A00183799 | El Paso District | Widen Road - Add Lanes, SS 320 (FM 3255 to Railroad Drive) | 4 of 4 | $140,035,874 | +24% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.