Pulice Construction, Inc.: TxDOT bid record

Pulice Construction, Inc. submitted 63 bids on Texas DOT contracts in the data, from 08 MAY 2020 to 03 NOV 2026, and was the low bidder on 4 of them (6%). When it was not low, its total sat a median +16% above the low bid.

Owner
Texas DOT
Low bid volume
$910,227,565
Latest bid
03 NOV 2026
Data through
19 NOV 2026
63Bids
4Low bids
6Win rate, percent
+16%Median gap to the low bid when not low, 59 bids

By year

YearBidsLow bidsWin rate
2020800%
20214125%
2022300%
20231318%
20247114%
20251600%
20261218%
Pulice Construction, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District1600%
Pharr District800%
Odessa District5120%
Yoakum District5120%
Austin District500%
Laredo District4125%
Tyler District300%
San Antonio District300%
El Paso District200%
Dallas District200%
Atlanta District100%
Bryan District100%
Pulice Construction, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pavement surface preparation for marking (6")678-7002LF4024 (60%)$0.10$0.18
Eliminating existing pavement marking & markers (4")677-6001LF3223 (72%)$0.42$0.60
Pavement surface preparation for marking (8")678-7004LF3521 (60%)$0.15$0.20
Barricades, signs and traffic handling502-7001MO6319 (30%)$14,024$5,000.00
Constructing detours508-7001SY4619 (41%)$79.66$87.00
Excavation (roadway)110-7001CY6118 (30%)$7.70$20.00
Remove SM RD SN sup&AM644-7073EACH5218 (35%)$92.92$110.00
Temporary sediment control fence (remove)506-7041LF5717 (30%)$0.97$1.00
Reflectorized pavement marker type II-C-R672-7006EACH5617 (30%)$5.92$5.00
Reflectorized pavement marker type II-A-A672-7004EACH5017 (34%)$5.77$5.00
Construction exits (remove)506-7024SY5916 (27%)$11.48$10.00
Biodegradable erosion control logs (remove)506-7046LF5516 (29%)$1.11$1.40
Pulice Construction, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Pulice Construction, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00184974Austin DistrictHighway Improvement, IH 35 (US 290 E to Martin Luther King Jr Blvd)2 of 6$415,739,567+1.0%
06 AUG 2026A00191470Houston DistrictConstruct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway)8 of 9$38,957,868+19%
06 AUG 2026A00119935Laredo DistrictInterchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE)1 of 4$205,813,981Low, 5.0% under the second
05 AUG 2026A00191471Houston DistrictConstruct Frontage Roads, SH 99 (Westheimer Parkway to Cinco Ranch Blvd)7 of 8$30,924,993+19%
05 AUG 2026A00007222Fort Worth DistrictReconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W)8 of 11$72,923,640+10%
05 AUG 2026A00068611Houston DistrictWiden Road - Add Lanes, UA 90 (FM 359 to W of SH 99)7 of 7$62,267,803+28%
02 JUL 2026A00124174Lubbock DistrictConvert Non-Freeway, FM 1585 (CR 2240 (AVE U) to 0.5 MI EAST OF US 87)5 of 5$307,007,227+39%
06 MAY 2026A00014162Dallas DistrictWiden Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road)5 of 9$125,812,989+13%
08 APR 2026A00133118Houston DistrictWiden Road - Add Lanes, SH 99 (IH 10(W) to West Road)6 of 10$132,992,475+11%
07 APR 2026A00084334Laredo DistrictConstruct New Road, SL 480 (0.259 MILES SOUTH OF US 57 to US 277 N)7 of 7$129,770,435+39%
04 FEB 2026A00121975Houston DistrictHighway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290)8 of 10$90,359,704+22%
07 JAN 2026A00059128Tyler DistrictInterchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590))6 of 7$241,876,186+22%
03 DEC 2025A00186339San Antonio DistrictWiden Road - Add Lanes, IH 35 (N. Walters St. to IH 410 S)2 of 5$279,695,015+26%
06 NOV 2025A00062085Austin DistrictConstruct Bridge, SL 360 (AT COURTYARD DRIVE to .)7 of 8$73,184,566+7.0%
05 NOV 2025A00004604Waco DistrictWiden Road - Add Lanes, US 190 (CORYELL COUNTY LINE to US 190 W OF CLARK RD)4 of 7$120,346,064+12%
09 OCT 2025A00020886Brownwood DistrictWiden Road - Add Lanes And Shoulders, US 183 (8.53 MI. NORTHWEST OF LAMPASAS to US 281)6 of 7$68,559,981+25%
08 OCT 2025A00062536Abilene DistrictInterchange Improvement (New Or Update), US 83 (AT to US 83/84 "Y" INTERCHANGE)6 of 9$77,537,913+7.0%
05 SEP 2025A00121173Pharr DistrictNew Arterial, SL 195 (NEW LOCATION, FM 3167 to FM 755)2 of 6$62,715,991+1.0%
05 SEP 2025A00063821Tyler DistrictBridge Replacement, IH 20 (.955 MI W OF SABINE RIVER to .842 MI E OF SABINE RIVER)6 of 10$43,513,669+18%
04 SEP 2025A00127796Amarillo DistrictConstruct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE)5 of 6$150,709,099+51%
04 SEP 2025A00128327Pharr DistrictWiden Road - Add Lanes, SH 107 (SH 495 to FM 1924)7 of 7$44,983,965+39%
01 JUL 2025A00125991Corpus Christi DistrictConstruct New Roadway Lanes, US 77 (1.5 MI N. OF SH 285 INTERSECTION to KENEDY/KLEBERG COUNTY LINE)2 of 6$179,222,2200.0%
05 JUN 2025A00011238San Antonio DistrictWiden Road - Add Lanes, US 90 (LP 1604 to 0.8 MILES W OF IH 410)7 of 9$139,832,027+13%
04 JUN 2025A00060771Austin DistrictHighway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE)5 of 9$64,374,438+10%
02 MAY 2025A00183799El Paso DistrictWiden Road - Add Lanes, SS 320 (FM 3255 to Railroad Drive)4 of 4$140,035,874+24%
Pulice Construction, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy