TxDOT contract A00125991 bid tabulation

Construct New Roadway Lanes, US 77 (1.5 MI N. OF SH 285 INTERSECTION to KENEDY/KLEBERG COUNTY LINE). Let by Texas DOT on July 1, 2025, Kleberg, Corpus Christi District. 6 bids received; low bid $178,365,453 by Anderson Columbia Co., Inc., -15% against the engineer's estimate of $209,462,582.

Owner
Texas DOT
Letting
01 JUL 2025
Pay items
222
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Anderson Columbia Co., Inc.$178,365,453Low-15%
2Pulice Construction, Inc.$179,222,2200.0%-14%
3Webber, LLC$188,625,328+6.0%-10%
4Posillico Civil, Inc.$198,362,875+11%-5.0%
5Zachry Construction Corporation$204,759,271+15%-2.0%
6J E Construction Services, LLC$218,365,481+22%+4.0%
TxDOT contract A00125991: bids by rank

Engineer's estimate: $209,462,582.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Anderson Columbia Co., Inc.2. Pulice Construction, Inc.3. Webber, LLC4. Posillico Civil, Inc.5. Zachry Construction Corporation6. J E Construction Services, LLC
1Preparing row (100-7002)STA200$25,000$7,500.00$89,611$85,977$30,000$100,000$14,650
2Removing concrete (riprap) (104-7006)SY590$12.00$20.00$27.32$19.31$41.00$20.00$34.00
3Remove stab base and asphalt pavement (6"-20") (105-7123)SY56,719$15.00$12.00$10.07$9.32$6.00$6.99$11.00
4Excavation (roadway) (110-7001)CY163,800$12.00$8.00$2.09$5.37$10.00$3.78$14.00
5Embankment (final)(OC)(type A) (132-7001)CY1$0.01$70.00$2,183.23$250.00$147.00$120.00$340.00
6Embankment (final)(DC)(type C) (132-7006)CY1,465,700$18.00$20.00$16.13$11.75$15.00$25.00$16.00
7Compost manuf topsoil (4") (161-7002)SY720,302$2.00$2.20$1.26$1.66$3.00$1.67$3.00
8Drill seed (permanent_rural_sand) (164-7041)ACRE149$450.00$2,400.00$583.98$561.72$563.00$515.72$630.00
9Drill seed (temporary_warm_cool) (164-7047)ACRE149$440.00$1,500.00$583.98$561.72$563.00$515.72$630.00
10Vegetative watering (168-7001)TGL26,320$15.00$28.00$26.20$6.65$33.00$10.00$15.00
11Soil ret BLKT(SL_steep_sand_long) (169-7008)SY9,992$5.50$1.60$4.05$3.89$4.00$3.57$5.00
12FL BS (compacted in place)(type A GR 1-2) (12") (247-7113)SY255$80.00$150.00$95.59$41.03$50.00$42.60$69.00
13FL BS (cip)(type A GR 1-2 or 5) final pos (247-7348)CY122,317$100.00$100.00$100.76$62.24$100.00$92.78$120.00
14Geogrid base reinforcement (type 2) (250-7002)SY1,194$2.00$7.00$6.88$2.82$8.00$3.39$4.00
15Lime (com or QK)(slurry) (260-7005)TON8,097$300.00$300.00$385.36$209.20$400.00$293.24$360.00
16Lime TRT (subgrade) (8") (260-7020)SY405,169$4.00$3.00$1.68$2.42$3.00$2.04$4.00
17Cement (275-7001)TON4,577$215.00$240.00$189.13$362.73$360.00$166.88$195.00
18Cement TRT (new base)(10") (275-7012)SY163,000$3.00$4.20$1.63$2.10$3.00$2.54$4.00
19Cement TRT (new base)(12") (275-7013)SY229,319$2.50$3.30$1.61$2.27$3.00$2.39$5.00
20Cement TRT (new base)(14") (275-7014)SY1,194$5.00$12.00$2.47$8.07$6.00$4.15$7.00
21Prime coat (MC-30) (310-7004)GAL76,177$7.00$5.20$4.00$6.46$7.00$4.16$6.00
22Aggregate (type-PB, GR-4S or 4)(sac-B) (316-7212)CY3,935$150.00$185.00$181.94$176.43$183.00$235.63$206.00
23Asphalt (multi option) (316-7275)GAL147,776$7.00$4.40$5.20$6.15$8.00$3.95$5.00
24D-GR HMA type-B sac-B PG70-22 (341-7007)TON100,530$130.00$109.00$122.93$142.42$114.00$120.80$157.00
25D-GR HMA type D sac-B PG70-22 (341-7050)TON19,579$120.00$136.00$127.51$147.23$145.00$154.47$172.00
26Tack coat (341-7082)GAL31,867$4.00$4.80$3.38$3.53$5.00$4.67$5.00
27Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009)TON26,502$150.00$172.00$171.29$156.76$170.00$183.00$214.00
28Flexible pavement structure repair(7") (351-7006)SY1,000$50.00$100.00$113.75$25.00$91.00$100.31$90.00
29Planing asphalt concrete pavement(0" to 2") (354-7032)SY3,855$3.00$10.00$2.62$3.07$5.00$2.67$7.00
30Plane concrete pavement(0" to 1") (354-7064)SY1,301$3.00$10.00$6.10$7.19$8.00$10.16$7.00
31Planing asphalt concrete pavement (1" to 2") (354-7076)SY846$3.00$10.00$9.48$11.04$12.00$9.37$7.00
32Struct excavation (pipe) (400-7003)CY14,680$55.00$7.00$10.39$6.07$120.00$0.01$7.00
33Cem stabil BKFL (400-7010)CY12,390.90$200.00$150.00$113.29$92.00$89.00$83.11$124.00
34Cement stab backfill (inlet or MH) (400-7011)CY1,261$125.00$150.00$93.57$92.00$89.00$82.70$112.00
35Trench excavation protection (402-7001)LF2,502$3.00$1.00$2.61$6.50$24.00$13.79$8.00
36Foundation load test (D4945) (pile) (405-7002)EACH28$20,000$4,400.00$20,793$4,000.00$20,516$13,026$24,000
37Prestressed concrete pil (18 in SQ) (409-7002)LF39,896$150.00$148.00$147.29$198.00$202.00$116.22$235.00
38Drilled shaft (18 in) (416-7002)LF1,260$275.00$140.00$121.68$156.68$123.00$106.54$120.00
39Drilled shaft (24 in) (416-7004)LF62$265.00$350.00$210.45$203.94$408.00$330.52$467.00
40Drilled shaft (36 in) (416-7006)LF6,806$340.00$280.00$460.80$238.00$480.00$246.25$302.00
41Drilled shaft (42 in) (416-7007)LF108$515.00$820.00$534.16$759.00$852.00$615.14$1,895.00
42Drilled shaft (sign mounts) (36 in) (416-7030)LF80$515.00$680.00$393.59$624.00$625.00$367.23$710.00
43Drilled shaft (sign mounts) (54 in) (416-7033)LF102$875.00$1,100.00$743.40$971.00$924.00$780.39$1,100.00
44Drilled shaft (high mast pole) (60 in) (416-7037)LF836$972.32$1,000.00$732.74$914.00$1,005.00$647.08$1,240.00
45Class C concrete (abutment) (420-7012)CY821.02$1,500.00$2,800.00$1,305.71$1,473.15$1,606.00$1,131.96$1,840.00
46Class C concrete (cap) (420-7022)CY1,184.38$1,500.00$2,700.00$1,705.02$1,436.99$2,255.00$1,605.71$2,740.00
47Class C concrete (column) (420-7038)CY814$1,500.00$2,200.00$1,587.66$1,430.24$1,790.00$821.81$2,290.00
48Class C concrete (footing) (420-7044)CY920.90$1,600.00$2,600.00$1,091.61$2,163.14$1,265.00$982.00$1,340.00
49Class C concrete (rail foundation) (420-7052)CY1,192$825.00$1,100.00$467.16$538.22$814.00$542.37$790.00
50Reinforced concrete slab (422-7001)SF336,495$42.00$32.00$22.00$28.24$22.00$25.30$32.00
51Reinforced concrete slab (box beam) (422-7005)SF53,196$24.00$60.00$19.83$36.15$38.00$31.14$41.00
52Approach slab (422-7013)CY1,680.93$1,000.00$900.00$761.27$563.16$626.00$800.00$1,140.00
53Shear key (422-7020)CY44.16$643.00$1,000.00$1,930.64$820.12$307.00$557.07$1,200.00
54Retaining wall (MSE) (423-7001)SF318,368$100.00$58.00$35.77$99.87$105.00$84.96$111.00
55Prestressed concrete girder (TX54) (425-7005)LF38,077.24$275.00$230.00$283.92$201.77$192.00$197.49$270.00
56Prestressed concrete box beam (4B20) (425-7026)LF1,692$300.00$360.00$303.23$226.73$510.00$196.54$480.00
57Prestressed concrete X-beam (5XB28) (425-7037)LF3,802.86$290.00$350.00$288.60$310.17$464.00$199.26$440.00
58Riprap (concrete)(4 in) (432-7001)CY75$2,020.00$600.00$434.04$568.80$526.00$493.30$700.00
59Riprap (concrete)(5 in) (432-7002)CY1,177$675.00$550.00$434.05$493.64$569.00$557.45$710.00
60Riprap (concrete)(6 in) (432-7003)CY76$850.00$550.00$434.05$681.61$594.00$568.34$722.00
61Riprap (concrete) (CL B) (4 in) (432-7007)CY2,459.70$575.00$550.00$434.05$499.68$601.00$541.30$705.00
62Riprap (mow strip)(4 in) (432-7013)CY1,451$700.00$600.00$467.34$595.11$688.00$470.92$700.00
63Riprap (stone protection)(12 in) (432-7041)CY1,203$300.00$220.00$280.10$181.23$230.00$287.56$470.00
64Rail (type SSTR) (450-7024)LF40,689.20$65.00$78.00$71.17$56.60$71.00$57.00$84.00
65Rail (type T80SS) (450-7028)LF748.10$150.00$210.00$255.80$134.91$147.00$206.23$174.00
66Retrofit rail (type SSTR) (451-7024)LF1,763$175.00$260.00$91.45$166.78$121.00$91.80$220.00
67Armor joint (sealed) (454-7003)LF115$185.00$210.00$159.61$205.84$253.00$130.71$194.00
68Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF2,054.83$250.00$280.00$242.28$203.86$285.00$180.74$284.00
69Concrete box culvert (5 FT X 2 FT) (462-7006)LF5,415$500.00$510.00$443.40$422.08$567.00$448.99$560.00
70RC pipe (CL III)(18 in) (464-7003)LF4,887$85.00$132.00$81.95$70.80$79.00$68.62$78.00
71RC pipe (CL III)(24 in) (464-7005)LF6,696$225.00$119.00$87.28$86.58$99.00$80.89$105.00
72RC pipe (CL III)(30 in) (464-7007)LF1,709$155.00$158.00$109.20$145.14$139.00$113.37$134.00
73RC pipe (CL III)(36 in) (464-7009)LF898$250.00$196.00$146.27$179.97$190.00$152.68$188.00
74RC pipe (arch)(CL III)(des 3) (464-7042)LF492$275.00$258.00$206.64$220.52$254.00$190.59$240.00
75Manh (complete)(PRM)(48IN) (465-7002)EACH2$8,250.00$10,000$4,177.50$8,968.64$8,588.00$6,497.36$6,060.00
76Manh (complete)(PRM)(60IN) (465-7003)EACH61$8,750.00$11,000$6,527.05$8,142.60$8,356.00$7,396.73$6,420.00
77Inlet (complete)(pcu)(5FT)(left) (465-7038)EACH5$10,750$12,000$7,015.67$11,727$10,990$8,863.28$9,380.00
78Inlet (complete)(pcu)(5FT)(right) (465-7039)EACH4$11,000$12,000$7,577.06$11,812$11,798$8,863.28$10,275
79Inlet(complete)(pazd)(FG)(3FTX3FT-3FTX3FT) (465-7158)EACH23$3,620.00$5,800.00$4,354.24$11,379$7,429.00$5,898.91$5,200.00
80Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162)EACH4$11,000$9,600.00$6,407.47$11,589$10,386$7,714.45$9,700.00
81Inlet (complete) (type MSE2) (465-7352)EACH79$7,750.00$7,200.00$5,076.79$8,495.36$9,896.00$6,524.35$20,135
82Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096)EACH31$7,500.00$6,500.00$15,231$15,826$12,355$7,674.37$13,000
83Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(C) (467-7097)EACH23$20,000$8,900.00$15,860$17,697$12,774$9,376.31$13,800
84Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(P) (467-7098)EACH7$11,950$9,900.00$15,860$16,885$13,642$10,715$14,200
85Set (type I)(S= 5 FT)(HW= 4 FT)(4:1)(C) (467-7100)EACH3$15,420$8,300.00$15,788$15,143$12,361$8,274.55$13,000
86Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH3$2,250.00$2,300.00$1,845.32$1,982.65$5,699.00$2,077.95$1,610.00
87Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH14$1,500.00$2,300.00$1,845.33$1,753.61$5,699.00$2,077.95$1,670.00
88Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH1$2,500.00$2,600.00$2,001.41$1,796.36$6,186.00$2,211.16$2,222.00
89Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH20$2,450.00$2,600.00$2,157.23$2,007.09$6,410.00$2,294.42$2,535.00
90Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367)EACH2$6,000.00$4,500.00$2,729.02$9,221.24$6,410.00$4,671.15$5,750.00
91Set (type II) (des 3) (RCP) (4: 1) (C) (467-7432)EACH6$7,800.00$4,500.00$2,469.12$6,670.03$5,865.00$3,302.31$6,200.00
92Set (type II) (des 3) (RCP) (6: 1) (C) (467-7433)EACH6$8,500.00$5,500.00$2,469.12$7,601.15$5,865.00$3,302.31$6,300.00
93Removing structure (set) (496-7004)EACH16$523.00$700.00$674.44$727.48$241.00$715.12$840.00
94Removing structure (wingwall) (496-7005)EACH8$1,800.00$3,000.00$2,619.85$1,589.46$434.00$633.10$1,300.00
95Removing structure (pipe) (496-7007)LF472$22.00$24.00$21.87$16.33$113.00$18.05$22.00
96Removing structure (bridge 0 - 99 FT length) (496-7009)EACH1$26,422$60,000$45,744$109,921$56,402$25,075$61,000
97Remove STR (rail) (496-7017)LF584$23.00$150.00$26.80$29.82$67.00$34.05$36.00
98Mobilization (500-7001)LS1$18,640,312$10,400,000$17,922,016$18,492,258$18,125,000$20,000,000$19,580,500
99Barricades, signs and traffic handling (502-7001)MO72$15,000$4,000.00$6,491.36$25,555$5,000.00$50,000$8,400.00
100Portable changeable message sign (503-7002)EACH4$13,000$60,000$30,091$19,225$15,600$25,000$24,220
101TMA (stationary) (505-7001)DAY171$235.00$260.00$365.80$78.98$484.00$250.00$380.00
102TMA (mobile operation) (505-7003)DAY25$322.00$820.00$1,226.22$36.14$646.00$275.00$690.00
103Rock filter dams (install) (type 2) (506-7007)CY143$26.00$400.00$57.18$201.00$194.00$174.44$215.00
104Rock filter dams (remove) (506-7012)CY143$2.00$205.00$17.67$22.00$25.00$36.73$28.00
105Construction exits (install) (type 1) (506-7020)SY2,652$18.00$62.00$45.75$65.00$56.00$32.14$105.00
106Construction exits (remove) (506-7024)SY2,652$8.00$37.00$15.60$15.00$13.00$4.59$14.00
107Temporary sediment control fence (install) (506-7039)LF1,500$4.00$5.00$5.20$10.00$7.00$4.18$15.00
108Temporary sediment control fence (remove) (506-7041)LF1,500$1.50$2.70$1.56$3.00$2.00$1.65$2.45
109Biodegradable erosion control logs (install) (12") (506-7044)LF2,300$5.00$7.00$8.31$8.25$8.00$7.35$9.00
110Biodegradable erosion control logs (remove) (506-7046)LF2,300$3.00$2.70$2.07$2.00$2.00$1.65$3.00
111Constructing detours (508-7001)SY10,636$114.00$104.00$30.65$81.14$32.00$98.46$126.00
112Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF3,360$50.00$30.00$57.16$61.63$78.00$38.01$78.00
113Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF3,270$12.00$16.00$9.02$10.93$7.00$10.00$16.00
114Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF3,360$14.00$18.00$8.59$28.58$16.00$10.35$17.00
115Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF1,530$100.00$97.00$90.55$105.59$139.00$85.80$170.00
116Permanent CTB (single slope)(42)(mod) (514-7004)LF18$250.00$340.00$226.28$581.56$300.00$323.09$420.00
117Permanent CTB (tran SSCB to SSTR) (mod) (514-7038)LF12$400.00$270.00$498.49$483.05$235.00$347.93$265.00
118Permanent CTB (tran T80SS to SSTR)(mod) (514-7051)LF120$500.00$354.00$159.53$233.06$213.00$305.49$240.00
119Concrete curb (type IV) (529-7005)LF140$50.00$66.00$17.93$22.00$75.00$36.73$34.00
120Concrete curb & gutter (type II) (529-7009)LF2,488$40.00$55.00$17.15$20.00$45.00$41.32$55.00
121Intersections (ACP) (530-7002)SY4,064$50.00$153.00$260.26$69.12$91.00$120.55$120.00
122Intersections (ACP) (type 1) (530-7003)SY3,110$55.00$125.00$268.86$67.31$47.00$107.87$118.00
123Driveways (ACP) (530-7010)SY4,961$50.00$61.00$204.85$10.92$25.00$45.10$76.00
124Concrete sidewalks (5") (531-7002)SY294$150.00$103.00$74.86$145.60$83.00$84.35$84.00
125Curb ramps (type 7) (531-7010)EACH4$4,000.00$3,870.00$3,118.89$3,197.61$4,225.00$3,063.72$4,200.00
126Curb ramps (type 22) (531-7014)EACH2$5,100.00$3,660.00$3,118.93$3,331.54$4,540.00$3,375.83$4,400.00
127Metal W-beam guard fence (timber post) (540-7001)LF2,225$30.00$25.00$29.19$23.19$23.00$25.38$28.00
128Metal beam guard fence trans (thrie-beam) (540-7005)EACH30$2,500.00$3,000.00$2,424.57$1,907.00$1,907.00$1,949.58$2,115.00
129Downstream anchor terminal section (540-7015)EACH2$2,000.00$1,520.00$1,377.60$1,408.00$1,408.00$1,284.49$1,570.00
130Metal beam guard fence trans (non - sym) (540-7016)EACH2$1,500.00$735.00$1,482.27$680.00$680.00$708.83$760.00
131Remove metal beam guard fence (542-7001)LF1,349$3.00$3.00$2.20$3.00$3.00$7.35$4.00
132Remove terminal anchor section (542-7002)EACH6$278.00$300.00$242.45$275.00$275.00$529.92$305.00
133Cable barrier system (install)(TL-4) (543-7002)LF17,755$15.00$15.00$17.08$17.65$18.00$11.72$20.00
134Cable barrier terminal sec (install)(TL-4) (543-7018)EACH14$3,250.00$3,000.00$3,113.37$3,325.00$3,325.00$2,537.31$3,680.00
135Guardrail end treatment (install) (544-7001)EACH30$3,000.00$3,500.00$3,361.34$3,222.00$3,222.00$3,513.17$3,600.00
136Crash cushion attenuator (move & reset) (545-7002)EACH10$2,136.00$950.00$1,675.15$875.00$875.00$1,991.34$4,700.00
137Crash cushion attenuator (remove) (545-7004)EACH4$1,240.00$863.00$892.67$800.00$800.00$1,191.15$890.00
138Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH6$40,000$34,000$32,952$26,850$26,850$34,240$33,480
139Crash cushion attenuator (install)(R)(N)(TL3) (545-7010)EACH3$35,400$33,000$29,315$25,115$25,115$30,826$32,000
140Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH4$8,800.00$8,960.00$8,816.61$8,300.00$8,300.00$9,530.30$13,660
141In RD IL (U/P) (type 1) (150W EQ) LED (610-7014)EACH2$1,701.58$1,560.00$1,458.35$1,875.50$2,000.00$1,287.89$2,040.00
142In RD IL (U/P) (type 2) (150W EQ) LED (610-7016)EACH18$1,866.99$1,525.00$1,487.94$1,413.60$2,000.00$1,314.02$2,100.00
143In RD IL (type SA) 40T-10 (250W EQ) LED (610-7126)EACH2$5,474.34$5,600.00$5,526.76$5,208.00$5,326.00$4,880.70$5,400.00
144HI MST IL pole (150 FT)(100 MPH) (613-7006)EACH18$82,099$71,000$77,455$65,638$66,751$68,402$68,080
145LED HI MST IL asm (6 fixt) (type B) (614-7003)EACH18$46,948$50,000$49,139$46,267$45,750$43,395$46,630
146Conduit (PVC) (schedule 40) (2") (618-7030)LF1,710$22.00$12.00$5.29$11.40$14.00$4.67$15.00
147Conduit (PVC) (schedule 80) (2") (618-7054)LF5,615$21.32$18.00$8.59$17.00$15.00$7.59$16.00
148Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF6,790$32.00$35.00$7.98$32.25$34.00$7.05$35.00
149Conduit (RM) (3/4") (618-7070)LF962$30.50$18.00$51.90$16.62$22.00$45.84$23.00
150Electrical conductor (no.12) insulated (620-7004)LF12,889$2.69$1.60$1.02$1.50$1.00$0.91$2.00
151Electrical conductor (no.6) insulated (620-7010)LF41,226$2.29$2.50$1.99$2.32$3.00$1.75$3.00
152Ground box type A (122311)W/apron (624-7002)EACH55$1,150.00$1,333.00$1,043.43$1,240.30$1,304.00$921.45$1,400.00
153Ground box type D (162922)W/apron (624-7008)EACH12$2,000.00$1,666.00$1,367.53$1,540.80$1,413.00$1,207.66$1,500.00
154Elc SRV type A 240/480 060(SS)SS(E)GC(O) (628-7054)EACH12$10,500$13,020$12,118$12,056$7,826.00$10,702$7,900.00
155Elc SRV type D 120/240 060(NS)SS(N)GC(O) (628-7152)EACH4$9,750.00$9,933.00$9,132.29$9,201.00$10,000$8,064.81$11,000
156Aluminum signs (type G) (636-7002)SF946$35.00$31.00$30.15$42.00$35.00$22.95$36.00
157Aluminum signs (type O) (636-7003)SF925$60.00$26.00$32.43$23.90$39.00$27.54$40.00
158Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH64$1,000.00$880.00$847.28$915.00$978.00$642.67$1,000.00
159Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH22$1,500.00$1,000.00$961.66$1,125.00$841.00$734.49$1,100.00
160Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH14$1,000.00$1,070.00$1,029.24$1,050.00$894.00$780.39$1,055.00
161Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH32$1,400.00$1,220.00$1,174.79$1,200.00$999.00$872.20$1,165.00
162Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033)EACH2$1,200.00$2,150.00$2,063.68$1,850.00$1,288.00$1,124.68$1,385.00
163Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036)EACH5$1,245.00$1,550.00$1,497.06$1,950.00$1,419.00$1,239.44$1,330.00
164In bridge MNT clearance sign assembly(type N) (644-7061)EACH22$3,000.00$2,180.00$2,105.26$2,100.00$1,950.00$1,703.09$2,600.00
165In bridge MNT clearance sign assembly(type S) (644-7062)EACH8$3,500.00$2,250.00$2,167.61$2,200.00$2,234.00$1,950.97$2,770.00
166Install small roadside sign support and assembly (rail mount) (644-7063)EACH9$8,250.00$4,100.00$3,950.60$8,250.00$5,104.00$4,457.40$3,780.00
167Relocate SM RD SN sup&AM type S80 (644-7067)EACH6$810.00$800.00$764.14$750.00$657.00$573.82$665.00
168Remove SM RD SN sup&AM (644-7073)EACH36$175.00$102.00$98.76$90.00$84.00$73.44$470.00
169Install LRSS (struct steel) (647-7001)LB7,218$8.00$6.50$6.22$5.91$9.00$4.18$9.00
170Install overhead sign support(30 FT bal tee) (650-7028)EACH2$71,600$63,400$66,844$58,710$57,881$50,496$59,090
171Install overhead sign support(35 FT cant) (650-7038)EACH1$80,000$66,000$65,304$61,155$58,696$50,955$60,060
172Install overhead sign support(65 FT BRDG) (650-7074)EACH2$75,000$86,300$80,369$79,942$73,642$64,359$76,000
173Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003)EACH191$75.00$106.00$101.89$110.00$110.00$114.76$125.00
174Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH241$25.00$48.00$46.51$38.00$38.00$55.09$43.00
175Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH62$32.00$48.00$46.78$40.00$40.00$59.68$45.00
176Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH50$40.00$48.00$46.78$45.00$45.00$59.68$51.00
177Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH145$25.00$48.00$46.78$38.00$38.00$59.68$42.00
178Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH16$20.00$48.00$46.78$40.00$40.00$59.68$44.00
179Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH251$37.00$48.00$46.78$45.00$40.00$59.68$51.00
180Install delineator assembly (D-DW)SZ 1(WFLX)GND (658-7045)EACH97$60.00$107.00$102.93$95.00$95.00$114.76$106.00
181Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH33$115.00$97.00$93.58$110.00$110.00$114.76$124.00
182Work zone pavement marking removing (W)4"(broken) (662-7061)LF901$1.00$1.20$1.14$1.10$1.00$1.01$2.00
183Work zone pavement marking removing (W)4"(solid) (662-7064)LF70,678$0.50$0.35$0.34$0.32$1.00$0.29$1.00
184Work zone pavement marking removing (Y)4"(solid) (662-7097)LF19,883$0.54$0.50$0.47$0.46$1.00$0.42$1.00
185Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH13,921$1.70$2.30$2.65$1.50$2.00$0.78$4.00
186Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,235$1.70$2.40$2.65$1.50$2.00$1.38$4.00
187Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008)LF2,396$1.25$1.20$1.14$1.10$1.00$1.01$2.00
188Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017)LF254$1.75$3.30$3.14$3.00$3.00$2.75$4.00
189Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF20,558$1.50$1.00$0.91$0.88$1.00$0.81$1.00
190Reflectorized pavement marking type I (W)12"(lane drop)(090MIL) (666-7026)LF647$1.00$2.00$2.07$2.00$2.00$1.84$3.00
191Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029)LF1,545$1.75$1.60$1.56$1.50$2.00$1.38$2.00
192Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116)LF230$6.00$2.00$2.07$2.00$2.00$1.84$2.00
193Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF24,460$0.60$0.78$0.74$0.72$1.00$0.66$1.00
194Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF115,366$0.75$0.65$0.63$0.60$1.00$0.55$1.00
195Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF440$1.00$2.00$2.07$2.00$2.00$1.84$2.00
196Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF119,810$0.75$0.65$0.63$0.60$1.00$0.55$1.00
197Mobile retroreflectivity data collect (667-7001)MI13,475$1.20$0.01$0.05$0.01$1.00$0.01$0.05
198Prefabricated PM type B (W)(6")(broken)contrast (668-7012)LF2,364$12.00$20.00$19.74$19.00$19.00$17.45$22.00
199Prefabricated PM type C (W)(12")(solid) (668-7087)LF1,811$10.00$9.00$8.31$8.00$8.00$7.35$9.00
200Prefabricated PM type C (W)(24")(solid) (668-7089)LF555$30.00$17.00$16.65$16.00$16.00$14.69$18.00
201Prefabricated PM type C (W)(arrow) (668-7091)EACH12$250.00$216.00$207.93$200.00$200.00$183.62$222.00
202Prefabricated PM type C (W)(double arrow) (668-7093)EACH6$375.00$380.00$363.88$350.00$350.00$321.34$390.00
203Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH6$400.00$400.00$389.84$375.00$375.00$344.29$420.00
204Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH4$500.00$570.00$545.81$525.00$525.00$482.01$585.00
205Prefabricated PM type C (W)(word) (668-7103)EACH18$350.00$300.00$285.90$275.00$275.00$252.47$305.00
206Prefabricated PM type C (W)(18")(yld tri) (668-7110)EACH54$40.00$20.00$18.71$18.00$18.00$16.53$20.00
207Reflectorized pavement marker type I-C (672-7002)EACH75$7.50$8.00$7.80$7.50$8.00$6.89$9.00
208Reflectorized pavement marker type II-A-A (672-7004)EACH634$7.00$8.00$7.80$7.50$8.00$6.89$9.00
209Reflectorized pavement marker type II-C-R (672-7006)EACH2,752$5.25$8.00$7.80$7.50$8.00$6.89$8.00
210Eliminating existing PM & markers (4") (677-7001)LF43,166$0.36$0.40$0.38$0.37$1.00$0.34$1.00
211Eliminating existing PM & markers (rumble strip) (677-7030)LF12,122$0.50$4.00$0.15$2.00$35.00$2.85$1.00
212Full-width mowing (rural) (730-7016)ACRE660$52.00$215.00$138.83$150.00$37.00$298.38$69.00
213Replacing elastomeric bearing pads (787-7001)EACH636$10,000$486.00$2,799.81$450.00$6,255.00$1,937.70$1,565.00
214Tip testing(drilled shaft) (4003-7001)EACH4$8,900.00$4,300.00$18,747$4,000.00$4,200.00$3,672.42$4,450.00
215Install DMS (foundation MTD cabinet) (6004-7002)EACH2$19,500$17,000$16,717$15,850$15,218$14,763$15,555
216System integration (6009-7001)LS1$5,000.00$10,000$2,661.63$9,250.00$16,305$2,350.50$16,652
217ITS pole MNT cab (type 2)(conf 2) (6011-7002)EACH4$6,700.00$9,000.00$9,056.46$8,433.00$7,609.00$7,997.82$7,760.00
218ITS pole (55 FT)(130 MPH) (6011-7007)EACH4$24,750$25,200$27,853$23,402$22,962$24,597$23,420
219CCTV field equip (digital) (install only) (6018-7001)EACH4$3,500.00$1,300.00$752.42$1,183.00$1,250.00$664.49$1,275.00
220ITS system support equipment (6037-7001)LS1$4,000.00$10,450$4,550.66$9,700.00$5,435.00$4,018.83$5,545.00
221Installation of cellular router (6052-7002)EACH6$1,500.00$625.00$468.36$580.00$788.00$413.61$805.00
222Water line (cip) (7023-7036)LS1$2,100,000$1,800,000$1,947,797$1,346,676$1,276,299$1,721,808$2,240,300
TxDOT contract A00125991: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.