Webber, LLC: TxDOT bid record

Webber, LLC submitted 186 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 04 NOV 2026, and was the low bidder on 41 of them (22%). When it was not low, its total sat a median +12% above the low bid.

Owner
Texas DOT
Low bid volume
$4,646,284,137
Latest bid
04 NOV 2026
Data through
19 NOV 2026
186Bids
41Low bids
22Win rate, percent
+12%Median gap to the low bid when not low, 144 bids

By year

YearBidsLow bidsWin rate
202024313%
202131826%
202225728%
202335926%
202424729%
202524417%
202623313%
Webber, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District381026%
Houston District27415%
San Antonio District14536%
Lubbock District14536%
Austin District11436%
Laredo District10220%
Amarillo District9333%
Abilene District8113%
Yoakum District7229%
Fort Worth District700%
Atlanta District500%
Corpus Christi District5120%
Webber, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type II-C-R672-7006EACH14390 (63%)$4.95$5.00
Reflectorized pavement marker type II-A-A672-7004EACH12681 (64%)$5.00$5.00
Electrical conductor (no.8) insulated620-7008LF12474 (60%)$1.75$2.00
Remove metal beam guard fence542-7001LF14273 (51%)$2.33$3.00
Install small roadside sign support and assembly type 10BWG(1)SA(T)644-7004EACH14971 (48%)$732.00$825.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF10468 (65%)$1.00$1.10
Temporary sediment control fence (install)506-7039LF16267 (41%)$3.31$4.00
Biodegradable erosion control logs (remove)506-7046LF16267 (41%)$1.00$1.40
Electrical conductor (no.6) bare620-7009LF12166 (55%)$1.81$2.10
Pavement surface preparation for marking (8")678-7004LF11566 (57%)$0.20$0.20
Eliminating existing pavement marking & markers (4")677-6001LF11466 (58%)$0.46$0.60
Temporary sediment control fence (remove)506-7041LF16264 (40%)$0.91$1.00
Webber, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Webber, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00212892Dallas DistrictWiden Road - Add Lanes, IH 35 (North of Rector to South of FM 455)4 of 6$153,499,152+11%
03 NOV 2026A00184974Austin DistrictHighway Improvement, IH 35 (US 290 E to Martin Luther King Jr Blvd)5 of 6$477,564,067+16%
07 OCT 2026A00064192San Antonio DistrictWiden Road - Add Shoulders, US 87 (Bexar/Wilson County Line to FM 1346)3 of 8$44,378,700+11%
03 SEP 2026A00184830Amarillo DistrictBridge Replacement, IH 40 (IH 40 AT SH 207 to .)3 of 7$11,346,486+15%
06 AUG 2026A00119935Laredo DistrictInterchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE)2 of 4$217,055,849+5.0%
05 AUG 2026A00007222Fort Worth DistrictReconstruct Existing Roadway, US 81 (NORTH OF HARMON ROAD to NORTH OF IH 35W)7 of 11$72,890,348+10%
02 JUL 2026A00212065Austin DistrictTransportation Non-Roadway, Various (At Bolm Sub to Pump Station and to At Kingsbery Sub to Pump Station)6 of 6$23,827,063+206%
01 JUL 2026A00080576Odessa DistrictConstruct Bridge, US 385 (AT SOUTH SL 338 to .)5 of 6$63,315,500+18%
03 JUN 2026A00062698San Antonio DistrictWiden Road - Add Lanes, SH 123 (Cordova Ln. to IH 10)2 of 6$40,931,6400.0%
02 JUN 2026A00119468Laredo DistrictConstruct Direct Connectors, IH 35 (0.187 MI SOUTH OF IH 35/US 59 INT. to 0.205 MI NORTH OF IH 35/ US 59 INT.)4 of 6$80,299,234+15%
07 MAY 2026A00031457San Antonio DistrictHighway Improvement, IH 410 (At US 281/San Pedro to .)1 of 3$155,584,592Low, 0.0% under the second
07 MAY 2026A00183655Lubbock DistrictRoadway Rehabilitation/Reconstruction With No Added Capacity, FM 179 (South of US 62 to LP 88 (FM 1585))2 of 6$11,395,000+18%
06 MAY 2026A00014162Dallas DistrictWiden Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road)1 of 9$111,363,901Low, 1.0% under the second
08 APR 2026A00133118Houston DistrictWiden Road - Add Lanes, SH 99 (IH 10(W) to West Road)2 of 10$123,649,965+3.0%
07 APR 2026A00084334Laredo DistrictConstruct New Road, SL 480 (0.259 MILES SOUTH OF US 57 to US 277 N)4 of 7$115,893,120+24%
07 APR 2026A00207258Lubbock DistrictBridge Replacement, FM 835 (FM 835 to at NFK DBL MTN FK Brazos River)1 of 2$5,991,100Low, 40% under the second
04 MAR 2026A00020688Dallas DistrictInterchange Improvement, US 67 (AT LAKE RIDGE PKWY to .)4 of 9$67,440,046+6.0%
04 MAR 2026A00062293Atlanta DistrictWiden Road - Add Lanes And Shoulders, US 82 (Red River C/L to 0.1 Mi W of US 259)6 of 7$65,973,000+20%
04 MAR 2026A00132533Dallas DistrictBridge Replacement, SS 348 (LP 12 NB to IH 35E NB DIRECT CONNECTORS)7 of 9$19,951,728+20%
04 FEB 2026A00205634Dallas DistrictConstruct New Road, SS 394 (IH 35E to FM 877)3 of 11$21,710,736+15%
04 FEB 2026A00045441Dallas DistrictWiden Road - Add Lanes, FM 549 (SH 205 to SH 276)2 of 12$31,956,749+7.0%
04 FEB 2026A00121975Houston DistrictHighway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290)6 of 10$84,127,222+14%
07 JAN 2026A00059128Tyler DistrictInterchange Improvement (New Or Update), IH 20 (1.55 MI WEST OF SH 31 (MM 588) to 1.14 MI EAST OF SH 31 (MM 590))4 of 7$224,683,973+13%
03 DEC 2025A00186339San Antonio DistrictWiden Road - Add Lanes, IH 35 (N. Walters St. to IH 410 S)4 of 5$301,117,030+36%
02 DEC 2025A00213139Lubbock DistrictConstruct Bridge, US 87 (0.75 MI NORTH OF FM 41 to 0.75 MI SOUTH OF FM 41)1 of 2$26,039,017Low, 3.0% under the second
Webber, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy