TxDOT contract A00212065 bid tabulation
Transportation Non-Roadway, Various (At Bolm Sub to Pump Station and to At Kingsbery Sub to Pump Station). Let by Texas DOT on July 2, 2026, Travis, Austin District. 6 bids received; low bid $7,779,122 by Texas Road LLC, -52% against the engineer's estimate of $16,306,479.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 114
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Road LLC | $7,779,122 | Low | -52% |
| 2 | E-Z Bel Construction, LLC | $15,620,588 | +101% | -4.0% |
| 3 | Jay-Reese Contractors, Inc. | $15,891,035 | +104% | -3.0% |
| 4 | Joe Bland Construction LLC | $19,561,041 | +151% | +20% |
| 5 | Zachry Construction Corporation | $22,146,359 | +185% | +36% |
| 6 | Webber, LLC | $23,827,063 | +206% | +46% |
Engineer's estimate: $16,306,479.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Road LLC | 2. E-Z Bel Construction, LLC | 3. Jay-Reese Contractors, Inc. | 4. Joe Bland Construction LLC | 5. Zachry Construction Corporation | 6. Webber, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 112 | $6,550.00 | $3,200.00 | $5,500.00 | $1,050.00 | $2,750.00 | $17,500 | $35,534 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 17 | $2,000.00 | $2,300.00 | $2,000.00 | $1,015.00 | $750.00 | $2,763.05 | $8,377.61 |
| 3 | Tree protection (install) (100-7014) | LF | 148 | $80.00 | $5.60 | $5.00 | $6.00 | $5.00 | $6.93 | $55.00 |
| 4 | Tree protection (remove) (100-7016) | LF | 148 | $10.00 | $1.70 | $3.00 | $2.00 | $2.00 | $2.19 | $5.00 |
| 5 | Removing concrete (pavement) (104-7001) | SY | 20 | $40.00 | $10.00 | $1.00 | $90.00 | $50.00 | $242.42 | $95.30 |
| 6 | Removing concrete (mowstrip) (104-7005) | LF | 112 | $20.00 | $18.00 | $1.00 | $12.00 | $45.00 | $21.49 | $117.48 |
| 7 | Removing concrete (medians) (104-7008) | SY | 58 | $30.00 | $12.00 | $1.00 | $40.00 | $45.00 | $79.75 | $97.89 |
| 8 | Removing concrete (driveways) (104-7011) | SY | 65 | $35.00 | $53.00 | $1.00 | $45.00 | $40.00 | $76.99 | $89.59 |
| 9 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 627 | $55.00 | $9.50 | $1.00 | $25.00 | $35.00 | $22.69 | $68.11 |
| 10 | Removing concrete (curb ramp) (104-7015) | SY | 21 | $150.00 | $35.00 | $1.00 | $45.00 | $45.00 | $118.76 | $401.21 |
| 11 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 311 | $30.00 | $11.00 | $1.00 | $30.00 | $15.00 | $22.17 | $76.29 |
| 12 | Removing concrete (foundations) (104-7023) | SY | 19 | $42.00 | $40.00 | $1.00 | $75.00 | $85.00 | $260.55 | $395.71 |
| 13 | Removing concrete (miscellaneous) (104-7046) | SY | 13 | $70.00 | $23.00 | $1.00 | $45.00 | $75.00 | $197.58 | $403.96 |
| 14 | Furn & place topsoil (4") (160-7002) | SY | 23,692 | $1.80 | $1.00 | $6.00 | $6.00 | $3.00 | $2.92 | $20.96 |
| 15 | Broadcast seed (permanent_urban_clay) (164-7004) | SY | 23,692 | $2.00 | $0.25 | $1.00 | $0.25 | $0.50 | $0.29 | $0.20 |
| 16 | Fertilizer (166-7001) | ACRE | 4.88 | $750.00 | $1,100.00 | $665.00 | $1,250.00 | $1,150.00 | $1,394.28 | $955.00 |
| 17 | Vegetative watering (168-7001) | TGL | 399 | $60.00 | $30.00 | $50.00 | $60.00 | $65.00 | $73.00 | $120.05 |
| 18 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 393 | $135.00 | $150.00 | $270.00 | $210.00 | $120.00 | $204.39 | $224.15 |
| 19 | D-GR HMA type-C PG76-22 (exempt) (341-7040) | TON | 314 | $125.00 | $150.00 | $290.00 | $240.00 | $350.00 | $262.79 | $264.59 |
| 20 | D-GR HMA type D PG70-22 (exempt) (341-7069) | TON | 1,100 | $110.00 | $260.00 | $208.00 | $230.00 | $360.00 | $303.67 | $214.24 |
| 21 | Tom-C PG76-22 sac-B (347-7002) | TON | 1,130 | $125.00 | $240.00 | $189.00 | $210.00 | $150.00 | $280.31 | $197.76 |
| 22 | Flexible pavement structure repair(4") (351-7003) | SY | 6,547 | $30.00 | $38.00 | $35.00 | $70.00 | $60.00 | $87.60 | $86.67 |
| 23 | Plane & text asphalt concrete pavement(2") (354-7019) | SY | 20,000 | $1.35 | $1.25 | $1.00 | $1.25 | $4.00 | $1.46 | $5.73 |
| 24 | Full - depth repair CRCP (10") (361-7005) | CY | 6 | $1,750.00 | $3,200.00 | $900.00 | $1,525.00 | $1,500.00 | $1,532.98 | $750.00 |
| 25 | Trench excavation protection (402-7001) | LF | 9,493 | $12.50 | $4.50 | $0.01 | $30.00 | $15.00 | $9.85 | $48.47 |
| 26 | Riprap (concrete)(4 in) (432-7001) | CY | 113 | $675.00 | $540.00 | $780.00 | $700.00 | $775.00 | $912.48 | $958.46 |
| 27 | Riprap (mow strip)(4 in) (432-7013) | CY | 7 | $730.00 | $280.00 | $700.00 | $930.00 | $725.00 | $948.98 | $1,445.01 |
| 28 | Mobilization (500-7001) | LS | 1 | $2,250,000 | $700,000 | $1,500,000 | $1,400,000 | $425,000 | $2,000,000 | $4,250,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $45,000 | $7,300.00 | $6,000.00 | $32,750 | $4,500.00 | $25,000 | $250,000 |
| 30 | Portable changeable message sign (503-7002) | EACH | 4 | $12,500 | $13,000 | $22,800 | $18,925 | $20,000 | $27,658 | $20,000 |
| 31 | TMA (stationary) (505-7001) | DAY | 90 | $275.00 | $280.00 | $277.00 | $350.00 | $340.00 | $276.66 | $350.00 |
| 32 | TMA (mobile operation) (505-7003) | DAY | 45 | $350.00 | $80.00 | $750.00 | $1,600.00 | $340.00 | $1,053.26 | $600.00 |
| 33 | Rock filter dams (install) (type 1) (506-7001) | LF | 30 | $75.00 | $45.00 | $43.00 | $230.00 | $60.00 | $62.05 | $50.00 |
| 34 | Rock filter dams (remove) (506-7011) | LF | 30 | $20.00 | $35.00 | $38.00 | $40.00 | $35.00 | $54.75 | $29.75 |
| 35 | Construction exits (install) (type 1) (506-7020) | SY | 333 | $35.00 | $42.00 | $22.00 | $45.00 | $50.00 | $31.39 | $35.75 |
| 36 | Construction exits (remove) (506-7024) | SY | 333 | $14.00 | $11.00 | $16.00 | $10.00 | $10.00 | $22.99 | $10.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 3,623 | $5.50 | $3.00 | $4.00 | $3.00 | $5.00 | $5.47 | $7.50 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 3,623 | $2.00 | $1.00 | $0.50 | $1.00 | $2.00 | $0.73 | $0.95 |
| 39 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 564 | $8.00 | $4.50 | $8.00 | $5.00 | $8.00 | $10.95 | $4.00 |
| 40 | Biodegradable erosion control logs (remove) (506-7046) | LF | 564 | $2.00 | $1.50 | $1.00 | $1.50 | $2.00 | $1.46 | $1.25 |
| 41 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,740 | $60.00 | $17.00 | $105.00 | $100.00 | $115.00 | $57.36 | $86.91 |
| 42 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 140 | $75.00 | $13.00 | $35.00 | $100.00 | $110.00 | $136.85 | $81.34 |
| 43 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 2,060 | $12.00 | $10.00 | $19.00 | $25.00 | $25.00 | $24.22 | $34.38 |
| 44 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 260 | $20.00 | $18.00 | $19.00 | $25.00 | $25.00 | $42.09 | $35.81 |
| 45 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,740 | $20.00 | $6.50 | $24.00 | $20.00 | $15.00 | $28.97 | $42.45 |
| 46 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 140 | $22.00 | $5.50 | $15.00 | $20.00 | $15.00 | $49.30 | $29.69 |
| 47 | Colored textured concrete (4") (527-7001) | SY | 73 | $165.00 | $120.00 | $125.00 | $235.00 | $140.00 | $20.00 | $642.73 |
| 48 | Colored textured concrete (6") (527-7003) | SY | 280 | $145.00 | $95.00 | $127.00 | $245.00 | $155.00 | $33.79 | $647.87 |
| 49 | Concrete curb & gutter (type II) (529-7009) | LF | 263 | $46.00 | $31.00 | $32.00 | $80.00 | $35.00 | $43.80 | $221.17 |
| 50 | Driveways (concrete) (hes) (530-7007) | SY | 63 | $300.00 | $32.00 | $180.00 | $225.00 | $245.00 | $29.31 | $237.02 |
| 51 | Concrete sidewalks (5") (531-7002) | SY | 274 | $102.00 | $68.00 | $110.00 | $210.00 | $95.00 | $19.24 | $234.52 |
| 52 | Curb ramps (type 1) (531-7005) | EACH | 2 | $3,000.00 | $3,400.00 | $3,000.00 | $3,700.00 | $1,750.00 | $4,306.94 | $4,050.83 |
| 53 | Curb ramps (type 7) (531-7010) | EACH | 3 | $3,000.00 | $3,700.00 | $3,200.00 | $4,700.00 | $1,750.00 | $5,328.93 | $4,146.44 |
| 54 | Concrete median (536-7002) | SY | 56 | $112.00 | $100.00 | $120.00 | $225.00 | $115.00 | $200.74 | $630.65 |
| 55 | Concrete median (nose) (536-7005) | SY | 11 | $850.00 | $260.00 | $850.00 | $250.00 | $250.00 | $138.70 | $461.88 |
| 56 | Metal W-beam guard fence (timber post) (540-7001) | LF | 75 | $33.00 | $27.00 | $35.00 | $34.00 | $25.00 | $51.10 | $50.00 |
| 57 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | $3,000.00 | $2,000.00 | $4,500.00 | $2,600.00 | $2,000.00 | $4,744.95 | $2,500.00 |
| 58 | Remove metal beam guard fence (542-7001) | LF | 77 | $5.00 | $1.50 | $15.00 | $2.00 | $2.00 | $7.30 | $5.00 |
| 59 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 3 | $310.00 | $175.00 | $1,500.00 | $220.00 | $150.00 | $364.99 | $150.00 |
| 60 | Guardrail end treatment (move & reset) (544-7002) | EACH | 3 | $5,000.00 | $1,300.00 | $4,500.00 | $1,600.00 | $1,250.00 | $1,094.98 | $1,100.00 |
| 61 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 4 | $850.00 | $1,250.00 | $650.00 | $700.00 | $750.00 | $1,569.48 | $1,075.00 |
| 62 | Remove SM RD SN sup&AM (644-7073) | EACH | 5 | $250.00 | $84.00 | $100.00 | $160.00 | $115.00 | $105.12 | $125.00 |
| 63 | Work zone pavement marking non-removing (W)4"(broken) (662-7001) | LF | 2,090 | $1.00 | $0.30 | $2.00 | $2.00 | $2.50 | $0.48 | $0.33 |
| 64 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 1,834 | $1.00 | $0.25 | $2.00 | $2.00 | $2.50 | $0.32 | $0.22 |
| 65 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 4,550 | $1.00 | $0.25 | $2.00 | $2.00 | $2.50 | $0.32 | $0.22 |
| 66 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 1,715 | $1.00 | $0.30 | $3.00 | $3.00 | $3.50 | $0.42 | $0.29 |
| 67 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 1 | $500.00 | $91.00 | $200.00 | $200.00 | $240.00 | $116.80 | $380.00 |
| 68 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 1 | $500.00 | $105.00 | $200.00 | $200.00 | $240.00 | $138.70 | $495.00 |
| 69 | Reflectorized pavement marking type I (W)4"(lane drop)(100MIL) (666-7006) | LF | 10 | $2.50 | $1.50 | $1.00 | $1.00 | $1.20 | $2.12 | $2.45 |
| 70 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 95 | $3.75 | $5.00 | $3.50 | $3.50 | $4.00 | $6.50 | $6.45 |
| 71 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 940 | $8.50 | $8.00 | $7.00 | $7.00 | $8.00 | $10.95 | $10.50 |
| 72 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 7 | $250.00 | $5.00 | $200.00 | $200.00 | $220.00 | $211.69 | $445.00 |
| 73 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 2 | $200.00 | $165.00 | $150.00 | $150.00 | $175.00 | $211.69 | $645.00 |
| 74 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 2 | $300.00 | $245.00 | $200.00 | $200.00 | $220.00 | $313.89 | $600.00 |
| 75 | Reflectorized pavement marking type I (Y)4"(DOT)(100MIL) (666-7108) | LF | 8 | $6.25 | $1.80 | $1.00 | $1.00 | $1.50 | $2.34 | $3.60 |
| 76 | Reflectorized pavement marking type II (W) 4" (lane drop) (666-7170) | LF | 10 | $1.50 | $1.00 | $2.00 | $2.00 | $2.00 | $1.46 | $2.00 |
| 77 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 1,460 | $0.35 | $0.30 | $0.65 | $0.65 | $1.00 | $0.39 | $0.27 |
| 78 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 6,703 | $0.35 | $0.30 | $0.65 | $0.65 | $1.00 | $0.39 | $0.27 |
| 79 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 136 | $1.50 | $0.40 | $0.65 | $0.65 | $1.00 | $0.53 | $0.86 |
| 80 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 95 | $2.75 | $1.40 | $2.50 | $2.50 | $3.00 | $1.90 | $1.30 |
| 81 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 940 | $4.75 | $5.40 | $5.00 | $5.00 | $6.00 | $6.93 | $4.75 |
| 82 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 7 | $125.00 | $9.00 | $100.00 | $100.00 | $115.00 | $124.10 | $85.00 |
| 83 | Reflectorized pavement marking type II (W) (bike arrow) (666-7203) | EACH | 2 | $125.00 | $40.00 | $100.00 | $100.00 | $115.00 | $51.10 | $35.00 |
| 84 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 2 | $175.00 | $45.00 | $100.00 | $100.00 | $115.00 | $58.40 | $40.00 |
| 85 | Reflectorized pavement marking type II (Y) 4" (DOT) (666-7209) | LF | 8 | $10.00 | $1.30 | $0.65 | $0.65 | $1.00 | $1.75 | $1.20 |
| 86 | Reflectorized pavement marking type II (Y) 4" (solid) (666-7210) | LF | 1,648 | $0.30 | $0.30 | $0.65 | $0.65 | $1.00 | $0.36 | $0.25 |
| 87 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 5,820 | $0.35 | $0.35 | $0.65 | $0.65 | $1.00 | $0.44 | $0.30 |
| 88 | Pavement sler 4" (666-7346) | LF | 1,666 | $0.65 | $0.30 | $0.30 | $0.30 | $1.00 | $0.36 | $0.25 |
| 89 | Pavement sler 6" (666-7347) | LF | 13,983 | $0.30 | $0.35 | $0.40 | $0.40 | $1.00 | $0.44 | $0.30 |
| 90 | Pavement sler 12" (666-7350) | LF | 95 | $1.50 | $1.40 | $1.50 | $1.50 | $2.00 | $1.90 | $1.30 |
| 91 | Pavement sler 24" (666-7352) | LF | 940 | $3.00 | $5.00 | $3.00 | $3.00 | $4.00 | $6.93 | $4.75 |
| 92 | Pavement sler (arrow) (666-7353) | EACH | 7 | $50.00 | $97.00 | $50.00 | $50.00 | $60.00 | $124.10 | $85.00 |
| 93 | Pavement sler (bike arrow) (666-7368) | EACH | 2 | $72.50 | $40.00 | $25.00 | $25.00 | $30.00 | $51.10 | $35.00 |
| 94 | Pavement sler (bike symbol) (666-7369) | EACH | 2 | $100.00 | $45.00 | $25.00 | $25.00 | $30.00 | $58.40 | $40.00 |
| 95 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,460 | $0.75 | $0.80 | $1.00 | $1.00 | $1.20 | $1.09 | $0.75 |
| 96 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 6,703 | $0.50 | $0.80 | $1.00 | $1.00 | $1.20 | $0.99 | $0.68 |
| 97 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 1,648 | $0.45 | $0.50 | $1.00 | $1.00 | $1.20 | $0.73 | $0.50 |
| 98 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 5,820 | $0.80 | $0.70 | $1.00 | $1.00 | $1.20 | $0.99 | $0.68 |
| 99 | Eliminating existing PM & markers (4") (677-7001) | LF | 7,875 | $1.00 | $0.50 | $1.50 | $1.50 | $2.00 | $0.73 | $0.50 |
| 100 | Eliminating existing PM & markers (8") (677-7004) | LF | 173 | $1.00 | $1.10 | $1.50 | $1.50 | $2.00 | $1.46 | $1.00 |
| 101 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 3 | $200.00 | $51.00 | $200.00 | $200.00 | $220.00 | $65.70 | $255.00 |
| 102 | Eliminating existing PM & markers (word) (677-7015) | EACH | 1 | $500.00 | $62.00 | $200.00 | $200.00 | $220.00 | $80.30 | $255.00 |
| 103 | Pavement surface preparation for marking (4") (678-7001) | LF | 1,666 | $0.30 | $0.40 | $0.02 | $0.02 | $0.50 | $0.51 | $0.35 |
| 104 | Pavement surface preparation for marking (6") (678-7002) | LF | 13,983 | $0.20 | $0.60 | $0.04 | $0.04 | $0.50 | $0.77 | $0.53 |
| 105 | Pavement surface preparation for marking (12") (678-7006) | LF | 95 | $0.50 | $0.80 | $0.25 | $0.25 | $0.50 | $1.02 | $0.70 |
| 106 | Pavement surface preparation for marking (24") (678-7008) | LF | 940 | $2.00 | $0.90 | $0.50 | $0.50 | $0.50 | $1.17 | $0.80 |
| 107 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 7 | $28.00 | $45.00 | $25.00 | $25.00 | $30.00 | $58.40 | $40.00 |
| 108 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 2 | $85.00 | $51.00 | $25.00 | $25.00 | $30.00 | $65.70 | $45.00 |
| 109 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 2 | $85.00 | $51.00 | $25.00 | $25.00 | $30.00 | $65.70 | $45.00 |
| 110 | Bonding course (3007-7001) | GAL | 3,600 | $3.70 | $4.00 | $3.25 | $3.25 | $5.00 | $4.74 | $3.35 |
| 111 | LED roadside sign (6066-7001) | EACH | 1 | $5,000.00 | $2,600.00 | $2,100.00 | $2,800.00 | $3,500.00 | $14,600 | $3,500.00 |
| 112 | Duct bank (concrete encase) (trench) (6159-7001) | LF | 9,485 | $500.00 | $248.00 | $678.00 | $750.00 | $1,270.00 | $955.38 | $542.49 |
| 113 | Duct bank (steel encase) (bore) (6159-7002) | LF | 1,413 | $2,200.00 | $1,200.00 | $2,350.00 | $2,150.00 | $1,950.00 | $2,962.32 | $1,735.49 |
| 114 | Manhole (6’X12’) (all depths) (6159-7003) | EACH | 35 | $95,500 | $30,000 | $50,000 | $35,600 | $45,750 | $60,870 | $35,788 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.