Zachry Construction Corporation: TxDOT bid record

Zachry Construction Corporation submitted 84 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 12 of them (14%). When it was not low, its total sat a median +12% above the low bid.

Owner
Texas DOT
Low bid volume
$1,332,829,380
Latest bid
04 NOV 2026
Data through
19 NOV 2026
84Bids
12Low bids
14Win rate, percent
+12%Median gap to the low bid when not low, 72 bids

By year

YearBidsLow bidsWin rate
202019526%
202115320%
20221100%
202310110%
20248225%
20258113%
20261300%
Zachry Construction Corporation, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District19316%
Dallas District16213%
Fort Worth District11436%
San Antonio District8113%
Yoakum District7114%
Corpus Christi District600%
Austin District4125%
Paris District300%
Wichita Falls District200%
Bryan District200%
Laredo District200%
Lufkin District100%
Zachry Construction Corporation, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type II-C-R672-7006EACH6334 (54%)$4.15$5.00
Eliminating existing pavement marking & markers (4")677-6001LF5432 (59%)$0.40$0.60
Temporary sediment control fence (install)506-7039LF8431 (37%)$2.58$4.00
Work zone pavement marking removing (Y)4"(solid)662-7097LF5230 (58%)$0.85$0.88
Work zone pavement marking removing (W)4"(solid)662-7064LF5029 (58%)$0.84$0.89
Pavement surface preparation for marking (8")678-7004LF4829 (60%)$0.14$0.20
Excavation (roadway)110-7001CY8327 (33%)$8.00$20.00
Construction exits (install) (type 1)506-7020SY7327 (37%)$25.59$30.00
Reflectorized pavement marker type II-A-A672-7004EACH6227 (44%)$4.65$5.00
Reflectorized pavement marker type I-C672-7002EACH5025 (50%)$4.38$5.00
Pavement surface preparation for marking (6")678-7002LF4725 (53%)$0.10$0.18
Guardrail end treatment (install)544-7001EACH7524 (32%)$2,925.00$3,245.00
Zachry Construction Corporation, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Zachry Construction Corporation, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00124162Bryan DistrictBridge Replacement, SH 30 (0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch)9 of 12$42,444,061+40%
04 NOV 2026A00212892Dallas DistrictWiden Road - Add Lanes, IH 35 (North of Rector to South of FM 455)6 of 6$154,873,429+12%
06 AUG 2026A00119935Laredo DistrictInterchange Improvement (New Or Update), IH 35 (0.47 MI S OF UNIROYAL INTERCHANGE to 3.22 MI N OF UNIROYAL INTERCHANGE)4 of 4$274,867,526+34%
05 AUG 2026A00068611Houston DistrictWiden Road - Add Lanes, UA 90 (FM 359 to W of SH 99)3 of 7$49,951,826+2.0%
02 JUL 2026A00124174Lubbock DistrictConvert Non-Freeway, FM 1585 (CR 2240 (AVE U) to 0.5 MI EAST OF US 87)4 of 5$276,846,375+25%
02 JUL 2026A00212065Austin DistrictTransportation Non-Roadway, Various (At Bolm Sub to Pump Station and to At Kingsbery Sub to Pump Station)5 of 6$22,146,359+185%
01 JUL 2026A00190685Houston DistrictConstruct Frontage Roads, SH 99 (Cinco Ranch Blvd to Bay Hill Blvd)7 of 11$21,656,182+11%
02 JUN 2026A00119468Laredo DistrictConstruct Direct Connectors, IH 35 (0.187 MI SOUTH OF IH 35/US 59 INT. to 0.205 MI NORTH OF IH 35/ US 59 INT.)5 of 6$85,984,574+23%
06 MAY 2026A00014162Dallas DistrictWiden Road - Add Lanes, US 377 (South of FM 1171 to Crawford Road)8 of 9$135,215,129+21%
08 APR 2026A00133118Houston DistrictWiden Road - Add Lanes, SH 99 (IH 10(W) to West Road)7 of 10$134,004,995+12%
08 APR 2026A00188972Yoakum DistrictBridge Replacement, SH 35 (AT CARANCAHUA BAY to STR# 0179-09-062)4 of 4$37,617,685+46%
04 MAR 2026A00020688Dallas DistrictInterchange Improvement, US 67 (AT LAKE RIDGE PKWY to .)7 of 9$73,861,075+16%
04 FEB 2026A00121975Houston DistrictHighway Improvement, US 290 (US 290/Greenhouse Rd, From Mound Rd to Skinner Rd at US 290)9 of 10$95,000,760+28%
03 DEC 2025A00186339San Antonio DistrictWiden Road - Add Lanes, IH 35 (N. Walters St. to IH 410 S)3 of 5$283,295,810+28%
08 OCT 2025A00062536Abilene DistrictInterchange Improvement (New Or Update), US 83 (AT to US 83/84 "Y" INTERCHANGE)4 of 9$76,964,482+6.0%
07 AUG 2025A00138368Dallas DistrictConstruct New Roadway Lanes, IH 35 (North of FM 455 to North of View Rd)6 of 8$152,052,007+18%
01 JUL 2025A00125991Corpus Christi DistrictConstruct New Roadway Lanes, US 77 (1.5 MI N. OF SH 285 INTERSECTION to KENEDY/KLEBERG COUNTY LINE)5 of 6$204,759,271+15%
05 JUN 2025A00011238San Antonio DistrictWiden Road - Add Lanes, US 90 (LP 1604 to 0.8 MILES W OF IH 410)8 of 9$141,899,615+14%
05 JUN 2025A00064825Dallas DistrictInterchange Improvement, IH 35E (South of Mayhill Road to South of SL 288)1 of 6$123,539,232Low, 6.0% under the second
04 JUN 2025A00060771Austin DistrictHighway Improvement, SH 71 (TRAVIS/BASTROP COUNTY LINE to 0.65 MI. EAST OF TUCKER HILL LANE)9 of 9$68,648,699+17%
04 MAR 2025A00063250Dallas DistrictWiden Road - Add Lanes, US 380 (West of Bridge Farmer Rd to 4th Street)3 of 3$147,971,439+5.0%
09 JUL 202407243001Fort Worth DistrictIH 30 Reconstruct existing roadway from LINKCREST DRIVE to IH 8201 of 2$267,014,970Low, 8.0% under the second
05 JUN 202406243002Houston DistrictUS 90 Construct bridge from AT GREENS BAYOU6 of 7$71,724,654+7.0%
03 MAY 202405243202Fort Worth DistrictIH 20 Highway improvement from FM 1187/3325 to IH 20/30 SPLIT1 of 5$98,670,164Low, 5.0% under the second
05 MAR 202403243002Houston DistrictIH 69 Highway improvement from AT BRAZOS RIVER3 of 4$57,358,974+8.0%
Zachry Construction Corporation: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy