TxDOT contract A00062536 bid tabulation

Interchange Improvement (New Or Update), US 83 (AT to US 83/84 "Y" INTERCHANGE). Let by Texas DOT on October 8, 2025, Taylor, Abilene District. 9 bids received; low bid $72,482,832 by James Construction Group, LLC, -15% against the engineer's estimate of $84,918,829.

Owner
Texas DOT
Letting
08 OCT 2025
Pay items
243
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1James Construction Group, LLC$72,482,832Low-15%
2Sundt Construction, Inc.$75,599,988+4.0%-11%
3Webber, LLC$76,238,518+5.0%-10%
4Zachry Construction Corporation$76,964,482+6.0%-9.0%
5FNF Construction, Inc.$76,984,994+6.0%-9.0%
6Pulice Construction, Inc.$77,537,913+7.0%-9.0%
7J. H. Strain & Sons, Inc.$79,191,280+9.0%-7.0%
8Mario Sinacola & Sons Excavating, Inc.$82,273,503+14%-3.0%
9A. L. Helmcamp, Inc.$86,326,123+19%+2.0%
TxDOT contract A00062536: bids by rank

Engineer's estimate: $84,918,829.

Bid tabulation

LinePay itemUnitQuantityEstimate1. James Construction Group, LLC2. Sundt Construction, Inc.3. Webber, LLC4. Zachry Construction Corporation5. FNF Construction, Inc.6. Pulice Construction, Inc.
1Preparing row (100-7002)STA190.30$2,500.00$37,500$39,000$40,062$36,784$1,000.00$35,000
2Removing concrete (riprap) (104-7006)SY5$65.00$35.43$125.00$103.20$475.11$150.00$118.85
3Removing concrete (driveways) (104-7011)SY847$8.09$50.00$15.49$14.17$25.00$43.06
4Removing concrete (curb & gutter) (104-7017)LF260$7.49$25.00$3.62$18.53$15.00$13.08
5Remove (18"-22") TRT/untrt base & asphalt pavement (105-7018)SY125,018$22.00$8.34$5.00$11.22$8.66$14.25$12.69
6Remove (0"-8") TRT/untrt base & asphalt pavement (105-7048)SY5,502$22.00$5.40$5.00$6.26$8.35$5.75$4.86
7Excavation (roadway) (110-7001)CY65,966.02$22.50$17.36$8.00$24.61$14.20$8.25$11.00
8Embankment (final)(DC)(type C) (132-7006)CY190,921.27$18.00$28.24$8.00$30.49$14.08$11.25$19.00
9Furn & place topsoil (4") (160-7002)SY251,514$6.00$1.02$1.00$1.21$3.48$0.75$2.00
10Block sodding (162-7002)SY5,664$6.46$7.50$6.23$7.17$7.50$7.50
11Broadcast seed (permanent_rural_clay) (164-7002)SY245,850$1.10$0.17$0.24$0.13$0.15$0.15$0.24
12Broadcast seed (temporary_warm) (164-7005)SY122,931$1.00$0.10$0.20$0.12$0.14$0.15$0.20
13Broadcast seed (temporary_cool) (164-7006)SY122,931$1.00$0.13$0.20$0.12$0.14$0.15$0.20
14Vegetative watering (168-7001)TGL8,279$32.50$36.45$25.00$16.61$36.83$70.00$50.85
15Soil ret BLKT(SL_steep_clay_long) (169-7006)SY1,175$2.40$3.00$3.56$4.10$4.50$3.00
16FL BS (compacted in place)(type A GR 1-2) (6") (247-7044)SY160,943$45.00$17.80$9.20$1.03$11.42$14.00$14.00
17FL BS (compacted in place)(type A GR 1-2) (12") (247-7113)SY61,021$45.00$25.26$15.00$17.09$23.01$27.00$30.00
18Lime (com or QK)(slurry) or QK(dry) (260-7001)TON2,414$400.00$338.05$340.00$27.09$366.44$425.00$350.00
19Lime TRT (existing material)(6") (260-7006)SY203,150$7.00$5.05$3.25$1.07$5.34$3.00$2.00
20Prime coat (MC-30) (310-7004)GAL55,497$6.00$4.80$4.85$0.64$5.61$6.00$4.80
21D-GR HMA type-B PG64-22 (341-7001)TON47,378$125.00$130.00$130.00$8.98$151.91$135.00$132.00
22SP mixes SP-C sac-B PG70-22 (344-7021)TON23,576$135.00$149.00$149.00$9.67$174.12$146.00$153.00
23Planing asphalt concrete pavement(0" to 2") (354-7032)SY1,312$5.30$8.00$3.94$6.87$7.00$3.95
24Struct excavation (400-7001)CY18,475$50.00$24.16$3.00$6.05$13.91$25.00$15.70
25Cem stabil BKFL (400-7010)CY15,529$200.00$124.89$225.00$50.11$39.50$185.00$100.00
26Trench excavation protection (402-7001)LF2,611$40.00$2.08$1.00$11.78$24.00$52.00$5.00
27Temporary special shoring (403-7001)SF38,025$40.00$12.11$2.30$13.00$21.40$25.00$17.89
28Drilled shaft (18 in) (416-7002)LF232$200.00$152.00$175.00$138.38$146.48$245.00$116.61
29Drilled shaft (36 in) (416-7006)LF1,195$350.00$234.22$325.00$297.24$267.55$440.00$309.60
30Drilled shaft (42 in) (416-7007)LF1,708$525.00$259.16$400.00$319.81$336.50$490.00$323.50
31Drilled shaft (48 in) (416-7008)LF783$560.00$338.74$500.00$441.28$480.20$710.00$527.76
32Drilled shaft (54 in) (416-7009)LF432$705.00$411.19$550.00$525.34$564.28$600.00$539.46
33Drilled shaft (sign mounts) (24 in) (416-7028)LF72$250.00$225.00$230.00$331.00$384.32$340.00$145.00
34Drilled shaft (sign mounts) (48 in) (416-7032)LF43$936.00$250.00$975.00$961.00$1,115.83$980.00$901.32
35Drilled shaft (sign mounts) (54 in) (416-7033)LF36$900.00$850.00$842.00$977.66$860.00$816.89
36Drilled shaft (high mast pole) (60 in) (416-7037)LF324$950.00$950.00$860.00$850.50$987.52$870.00$913.71
37Class B concrete (flume) (420-7010)CY132.90$825.00$961.86$1,000.00$1,369.38$945.17$500.00$625.00
38Class C concrete (abutment)(HPC) (420-7013)CY130.20$2,000.00$1,215.44$1,500.00$2,265.30$1,254.71$3,050.00$1,600.00
39Class C concrete (cap)(HPC) (420-7023)CY444.90$2,100.00$1,096.27$1,600.00$2,677.28$1,869.87$2,390.00$1,800.00
40Class C concrete (cap)(HPC)(mass) (420-7025)CY254.40$1,925.00$1,339.46$2,000.00$2,759.59$2,068.37$2,790.00$2,000.00
41Class C concrete (column)(HPC) (420-7039)CY218.40$2,000.00$1,330.97$1,500.00$2,455.63$1,609.49$3,100.00$2,000.00
42Class C concrete (column)(HPC)(mass) (420-7041)CY492$1,200.00$1,188.81$1,400.00$1,176.18$1,166.76$1,550.00$2,200.00
43Class C concrete (footing)(HPC)(mass) (420-7047)CY592.80$1,450.00$810.77$1,000.00$736.86$897.23$1,050.00$1,000.00
44Class C concrete (rail foundation)(HPC) (420-7054)CY891.60$1,000.00$513.21$725.00$786.65$698.90$700.00$659.42
45Reinforced concrete slab (HPC) (422-7002)SF88,764$30.00$38.00$30.00$42.11$31.77$40.00$27.00
46Approach slab (HPC) (422-7014)CY179.70$1,000.00$700.90$725.00$742.09$754.29$1,450.00$1,000.00
47Retaining wall (MSE) (423-7001)SF75,860$85.00$60.00$116.00$125.42$107.68$107.00$125.00
48Prestressed concrete girder (TX40) (425-7003)LF2,818.88$275.00$242.03$250.00$576.36$254.14$390.00$250.00
49Prestressed concrete girder (TX62) (425-7006)LF9,778.18$225.00$239.21$325.00$598.21$248.44$345.00$270.00
50Riprap (concrete)(4 in) (432-7001)CY180.90$725.00$635.14$1,000.00$714.81$663.38$900.00$600.00
51Riprap (concrete) (CL B) (4 in) (432-7007)CY34.47$850.00$732.07$1,250.00$784.63$1,318.42$1,300.00$600.00
52Riprap (mow strip)(4 in) (432-7013)CY97$700.00$662.74$1,000.00$753.16$866.20$900.00$500.00
53Riprap (mow strip)(5 in) (432-7014)CY122.80$600.00$662.74$900.00$753.15$626.52$500.00$515.00
54Riprap (stone common)(dry)(12 in) (432-7031)CY210$200.00$135.00$125.00$170.00$181.44$200.00$752.15
55Rirrap (stone common)(dry)(15 in) (432-7032)CY17$135.87$200.00$172.00$460.40$205.00$700.93
56Riprap (stone common)(dry)(18 in) (432-7033)CY128$250.00$138.85$125.00$175.00$164.72$215.00$664.67
57Rail (type SSTR)(HPC) (450-7025)LF16,956.70$100.00$69.36$85.00$76.50$78.24$95.00$80.00
58Rail (handrail)(type F) (450-7063)LF170$139.60$160.00$189.22$183.49$265.00$168.30
59Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF423$230.00$206.63$235.00$302.29$281.24$300.00$459.19
60Concrete box culvert (3 FT X 2 FT) (462-7001)LF237.80$405.00$209.89$220.00$262.64$319.80$950.00$318.40
61Concrete box culvert (4 FT X 2 FT) (462-7003)LF346.10$500.00$263.19$250.00$288.93$364.44$1,100.00$362.40
62Concrete box culvert (5 FT X 2 FT) (462-7006)LF559$1,000.00$317.48$280.00$336.05$477.55$600.00$432.00
63Concrete box culvert (6 FT X 3 FT) (462-7011)LF282$850.00$419.19$400.00$434.03$596.10$1,450.00$558.40
64Concrete box culvert (6 FT X 6 FT) (462-7014)LF131$978.61$475.00$610.09$774.29$950.00$709.80
65Concrete box culvert (8 FT X 3 FT) (462-7020)LF188$531.00$500.00$755.38$843.09$950.00$738.60
66Concrete box culvert (3 FT X 2 FT)(extend) (462-7056)LF78$518.66$250.00$419.20$419.88$1,150.00$418.40
67Concrete box culvert (4 FT X 2 FT)(extend) (462-7058)LF62$683.17$300.00$527.11$541.20$1,300.00$462.40
68Concrete box culvert (4 FT X 3 FT)(extend) (462-7059)LF52$1,000.00$810.94$350.00$641.58$686.76$1,450.00$490.40
69Concrete box culvert (5 FT X 2 FT)(extend) (462-7061)LF29$1,000.00$1,254.37$400.00$623.17$869.45$1,600.00$632.00
70RC pipe (CL III)(18 in) (464-7003)LF3,538.32$75.00$100.00$110.00$92.15$87.63$100.00$82.60
71RC pipe (CL III)(24 in) (464-7005)LF707.70$100.00$150.00$130.00$160.67$135.70$115.00$100.20
72RC pipe (arch)(CL III)(des 1) (464-7040)LF4,501.34$250.00$173.44$148.00$190.10$178.97$200.00$157.80
73Junction box(complete)(PJB)(3FTX3FT) (465-7005)EACH3$7,000.00$6,205.75$6,000.00$7,407.63$7,644.93$10,000$3,196.00
74Inlet (complete)(pco)(3FT)(none) (465-7013)EACH6$7,423.72$6,000.00$7,835.19$9,407.70$8,700.00$4,556.00
75Inlet (complete)(pco)(3FT)(left) (465-7014)EACH4$7,182.09$7,500.00$8,339.85$10,139$9,400.00$5,188.00
76Inlet (complete)(pco)(3FT)(right) (465-7015)EACH2$7,423.73$7,500.00$8,340.56$10,432$9,400.00$5,284.00
77Inlet (complete)(pco)(3FT)(both) (465-7016)EACH2$7,423.73$8,500.00$8,839.06$11,209$10,100$5,640.00
78Inlet (complete)(pco)(5FT)(both) (465-7024)EACH3$7,000.00$8,283.15$10,000$10,700$13,208$12,500$7,508.00
79Inlet (complete)(pcu)(5FT)(both) (465-7040)EACH2$10,500$8,442.13$10,000$9,980.26$13,425$11,600$8,124.00
80Inlet (complete)(PMBD)(4FT) (465-7045)EACH4$10,000$6,483.18$9,000.00$9,171.45$10,138$10,500$6,228.00
81Inlet (complete)(pod)(FG)(3FTX3FT) (465-7048)EACH2$5,000.00$6,447.39$11,000$11,291$12,307$13,500$5,288.00
82Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH24$8,750.00$6,405.81$5,600.00$6,585.62$8,513.61$8,200.00$4,588.00
83Inlet (complete)(PSL)(FG)(3FTX5FT-3FTX5FT) (465-7130)EACH1$11,500$9,458.59$7,000.00$8,368.01$10,883$9,100.00$6,148.00
84Inlet (complete)(PSL)(FG)(5FTX6FT-3FTX3FT) (465-7137)EACH1$12,000$9,458.59$9,000.00$10,107$12,902$11,500$8,720.00
85Inlet (comp)(type sidewalk bridge) (465-7336)EACH1$8,023.45$18,000$37,732$23,390$37,500$22,520
86Inlet (complete) (type MSE2) (465-7352)EACH2$9,000.00$12,677$14,000$17,141$15,214$8,000.00$14,676
87Inlet (complete)(wall) (465-7373)EACH4$8,000.00$18,149$10,000$15,566$10,270$9,000.00$14,676
88Inlet (complete)(type sidewalk bridge)(mod) (465-7374)EACH6$9,857.59$24,000$39,887$32,271$40,000$22,520
89Wingwall (FW - 0) (HW=3 FT) (466-7145)EACH2$13,070$10,000$9,466.34$18,385$7,000.00$16,850
90Wingwall (FW - 0) (HW=4 FT) (466-7146)EACH1$18,000$15,480$16,000$19,675$31,960$14,200$17,555
91Wingwall (PW - 1) (HW=3 FT) (466-7173)EACH4$13,000$13,778$14,000$10,291$15,310$11,600$18,650
92Wingwall (PW - 1) (HW=4 FT) (466-7174)EACH5$15,000$14,861$18,000$19,046$22,385$17,100$19,750
93Wingwall (PW - 1) (HW=5 FT) (466-7175)EACH2$17,500$20,535$30,000$21,581$34,802$25,500$24,650
94Wingwall (PW - 1) (HW=6 FT) (466-7176)EACH1$26,867$44,000$39,116$49,243$33,500$25,550
95Wingwall (PW - 1) (HW=7 FT) (466-7177)EACH2$29,116$48,000$46,643$60,308$44,900$27,850
96Set (type I)(S= 3 FT)(HW= 3 FT)(6:1)(C) (467-7042)EACH2$20,000$18,367$6,500.00$12,266$10,890$11,000$8,550.00
97Set (type I)(S= 4 FT)(HW= 3 FT)(6:1)(C) (467-7069)EACH2$20,000$18,564$7,000.00$12,421$13,219$11,750$9,365.00
98Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096)EACH1$10,000$18,760$11,000$13,625$18,837$15,000$11,685
99Set (type I)(S= 5 FT)(HW= 3 FT)(6:1)(P) (467-7098)EACH6$18,760$9,000.00$13,518$9,194.35$14,750$13,555
100Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH3$1,118.77$1,500.00$1,735.94$2,112.76$1,800.00$1,072.80
101Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH1$1,250.46$1,500.00$1,888.03$2,302.73$1,900.00$1,072.80
102Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH3$1,500.00$1,249.37$1,400.00$1,888.04$2,302.73$1,900.00$1,152.00
103Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH2$2,400.00$1,412.68$1,700.00$2,242.64$3,200.14$3,000.00$1,418.40
104Set (type II) (des 1) (RCP) (6: 1) (C) (467-7417)EACH5$1,531.26$1,500.00$3,008.74$2,245.16$2,250.00$1,148.00
105Set (type II) (des 1) (RCP) (6: 1) (P) (467-7418)EACH128$3,000.00$1,531.26$1,350.00$3,008.74$2,245.17$1,500.00$1,148.00
106Grate and frame (bridge drain) (471-7006)EACH7$2,500.00$3,441.54$2,500.00$5,129.87$2,245.92$4,500.00$3,885.00
107Clean existing culverts (480-7001)EACH4$4,000.00$4,592.01$4,500.00$6,026.65$3,847.95$7,000.00$3,500.00
108Pipe (PVC) (schedule 40) (6 in) (481-7013)LF348$125.00$38.16$200.00$298.20$207.65$80.00$185.27
109Removing structure (set) (496-7004)EACH60$1,000.00$468.77$800.00$1,188.46$719.08$2,200.00$500.00
110Removing structure (wingwall) (496-7005)EACH4$2,300.00$1,145.72$5,000.00$2,689.42$3,595.36$4,050.00$1,500.00
111Removing structure (pipe) (496-7007)LF2,065.40$35.00$10.10$30.00$55.79$22.77$25.00$5.00
112Removing structure (box culvert) (496-7008)LF481$200.00$65.25$100.00$66.31$52.42$75.00$50.00
113Mobilization (500-7001)LS1$7,700,000$7,104,224$8,399,300$7,623,851$7,000,000$7,698,000$7,734,761
114Barricades, signs and traffic handling (502-7001)MO43$15,000$24,454$41,000$94,178$25,496$25,500$11,089
115Portable changeable message sign (503-7002)EACH3$10,000$17,044$25,000$25,384$20,724$23,000$30,000
116TMA (stationary) (505-7001)DAY681$300.00$713.01$165.00$100.00$201.13$240.00$500.00
117TMA (mobile operation) (505-7003)DAY90$500.00$1,089.16$1,200.00$100.00$1,625.88$650.00$165.84
118Rock filter dams (install) (type 2) (506-7002)LF808$50.00$28.00$45.00$48.64$56.00$60.00$44.00
119Rock filter dams (install) (type 3) (506-7003)LF20$50.00$100.00$134.25$154.57$150.00$100.00
120Rock filter dams (remove) (506-7011)LF828$25.00$13.50$15.00$17.39$20.02$18.00$15.00
121Temporary sediment control fence (install) (506-7039)LF5,672$5.00$3.99$5.00$4.61$5.31$6.00$4.99
122Temporary sediment control fence (remove) (506-7041)LF5,672$2.00$1.00$1.25$1.14$1.31$1.00$1.25
123Biodegradable erosion control logs (install) (12") (506-7044)LF2,033$8.00$3.75$6.00$7.50$8.63$10.00$6.00
124Biodegradable erosion control logs (remove) (506-7046)LF2,033$2.50$1.00$1.25$1.14$1.31$1.00$1.25
125Constructing detours (508-7001)SY21,979$100.00$80.99$90.00$121.78$83.75$110.00$100.00
126One-way traffic control (port traffic signal) (510-7003)MO86$2,500.00$4,380.00$3,100.00$675.00$6,605.44$1,600.00$3,537.91
127Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013)LF16,230$24.00$6.84$13.00$13.58$16.18$9.00$22.53
128Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF42,960$15.00$5.31$6.00$9.72$7.51$4.50$6.25
129Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF16,230$13.00$6.84$10.00$13.04$12.34$7.50$18.75
130Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF1,193.50$120.00$98.09$140.00$155.38$84.47$175.00$148.16
131Permanent CTB (single slope) (type 3) (42 ) (514-7002)LF624$270.00$151.40$250.00$254.58$487.00$300.00$324.71
132Concrete curb & gutter (type I) (529-7008)LF1,965.30$55.00$20.68$55.00$51.86$42.54$50.00$26.71
133Concrete curb & gutter (type II) (529-7009)LF12,212.70$28.63$50.00$45.95$35.95$45.00$23.79
134Concrete curb (ribbon) (529-7028)LF55.40$50.00$55.70$50.00$23.00$79.12$70.00$33.25
135Intersections (concrete) (530-7001)SY744$126.15$150.00$125.22$116.79$150.00$85.00
136Driveways (concrete) (530-7006)SY448$122.92$145.00$132.34$96.62$150.00$85.00
137Driveways (ACP) (530-7010)SY3,833$60.00$57.49$80.00$104.97$65.48$90.00$109.52
138Driveways (ACP and concrete) (530-7014)SY1,524$182.92$120.00$159.05$149.45$120.00$60.00
139Concrete sidewalks (4") (531-7001)SY11,981$71.18$90.00$69.38$75.48$107.00$61.25
140Curb ramps (type 7) (531-7010)EACH13$3,009.65$5,500.00$3,119.53$3,988.50$4,000.00$2,825.00
141Curb ramps (type 10) (531-7011)EACH4$3,010.69$6,500.00$5,044.75$3,847.86$3,750.00$3,125.00
142Mill rumble strips (asphalt) (shoulder) (533-7001)LF39,764$0.25$1.00$0.09$0.59$0.09$0.15$0.11
143Concrete median (536-7001)LF336$80.00$120.58$60.00$111.56$382.04$290.00$75.35
144Metal W-beam guard fence (timber post) (540-7001)LF1,500$30.00$27.00$28.00$27.00$32.24$30.00$27.70
145Metal beam guard fence trans (thrie-beam) (540-7005)EACH6$2,500.00$2,170.00$1,700.00$2,170.00$2,878.31$2,540.00$3,949.99
146Downstream anchor terminal section (540-7015)EACH1$1,800.00$1,650.00$1,400.00$1,650.00$1,036.17$915.00$1,400.00
147Cable barrier system (install)(TL-4) (543-7002)LF1,945$20.00$25.50$19.00$25.50$28.78$25.00$22.70
148Cable barrier terminal sec (install)(TL-4) (543-7018)EACH2$4,000.00$490.00$2,900.00$4,900.00$6,332.30$5,600.00$4,775.00
149Cable barrier (remove) (543-7037)LF1,643$7.00$5.00$5.00$5.00$13.82$16.00$3.90
150Cable barrier terminal section (remove) (543-7038)EACH3$950.00$900.00$900.00$900.00$3,453.98$3,100.00$385.00
151Guardrail end treatment (install) (544-7001)EACH7$3,500.00$3,010.00$3,200.00$3,010.00$4,029.64$4,000.00$3,260.00
152Crash cushion attenuator (move & reset) (545-7002)EACH69$2,100.00$950.00$1,150.00$950.00$1,727.00$320.00$1,445.00
153Crash cushion attenuator (remove) (545-7004)EACH33$1,450.00$750.00$400.00$750.00$1,151.33$645.00$810.00
154Crash cushion attenuator (install)(L)(N)(TL3) (545-7006)EACH7$28,000$23,780$25,000$23,780$42,023$55,000$32,580
155Cca (install)(N)(TL3)(work zone) (545-7018)EACH33$12,000$7,200.00$6,900.00$7,200.00$9,325.74$5,000.00$7,600.00
156Mailbox install-S (TWG-post) type 2 (560-7002)EACH8$360.00$265.00$270.00$265.00$316.62$300.00$230.00
157Mailbox install-D (TWG-post) type 2 (560-7003)EACH1$303.00$310.00$303.00$402.96$385.00$270.00
158HI MST IL pole (150 FT)( 80 MPH) (613-7005)EACH8$52,250$62,000$50,000$46,250$53,701$46,800$53,765
159HI MST IL pole (175 FT)( 80 MPH) (613-7007)EACH4$67,325$69,000$60,000$56,500$65,603$57,100$66,429
160LED HI MST IL asm (6 fixt) (type B) (614-7003)EACH9$42,650$40,500$40,000$35,050$40,697$35,500$47,393
161LED HI MST IL asm (6 fixt) (type C) (614-7004)EACH3$41,110$39,500$40,000$34,760$40,360$35,200$48,716
162Conduit (PVC) (schedule 80) (2") (618-7054)LF8,095$20.50$16.00$11.00$10.75$12.48$11.00$16.52
163Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF975$32.00$32.00$38.00$37.65$43.71$39.00$46.64
164Electrical conductor (no.8) bare (620-7007)LF3,150$2.25$1.75$2.20$2.15$2.50$2.50$2.80
165Electrical conductor (no.8) insulated (620-7008)LF7,150$3.00$2.00$2.45$2.42$2.81$3.00$3.16
166Electrical conductor (no.6) bare (620-7009)LF5,970$3.50$2.00$2.75$2.70$3.13$3.00$3.29
167Electrical conductor (no.6) insulated (620-7010)LF10,860$3.75$2.25$3.00$2.96$3.44$3.50$3.83
168Electrical conductor (no.2) insulated (620-7016)LF4,670$4.00$3.00$4.35$4.30$4.99$5.00$6.23
169ITS GND box type 2 (603636)W/apron (623-7038)EACH3$8,750.00$5,625.00$15,500$15,050$17,475$17,000$7,755.14
170Ground box type A (122311)W/apron (624-7002)EACH36$2,250.00$1,400.00$2,500.00$2,260.00$2,624.10$3,700.00$2,513.67
171Remove ground box (624-7013)EACH6$400.00$475.00$550.00$538.00$624.68$700.00$807.90
172Remove electrical services (628-7002)EACH2$1,000.00$950.00$825.00$807.00$937.02$1,000.00$1,386.90
173Elc SRV type A 240/480 060(SS)SS(E)SP(O) (628-7057)EACH4$17,000$9,500.00$16,000$15,050$17,475$15,500$13,809
174Elc SRV type D 120/240 100(NS)SS(N)SP(O) (628-7259)EACH3$5,075.00$7,300.00$15,000$13,975$16,227$14,500$9,968.74
175Aluminum signs (type G) (636-7002)SF936$30.00$40.00$35.00$33.45$38.84$35.00$30.25
176Aluminum signs (type O) (636-7003)SF418.50$60.00$40.00$33.00$32.15$37.33$35.00$37.64
177Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH46$1,000.00$775.00$700.00$1,028.00$892.28$1,100.00$695.00
178Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH13$1,000.00$850.00$815.00$1,196.00$978.63$1,300.00$740.00
179Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH22$1,000.00$850.00$900.00$1,189.00$1,036.19$1,300.00$970.00
180Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH4$1,100.00$975.00$1,050.00$1,520.00$1,237.68$1,600.00$1,235.00
181Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH6$1,100.00$1,050.00$1,225.00$1,489.00$1,439.16$1,600.00$1,135.00
182Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,150.00$1,150.00$1,795.00$1,381.60$1,900.00$1,215.00
183In bridge MNT clearance sign assembly(type N) (644-7061)EACH2$2,500.00$2,700.00$2,400.00$4,463.00$5,182.02$4,600.00$2,135.00
184In bridge MNT clearance sign assembly(type S) (644-7062)EACH2$3,000.00$3,000.00$2,450.00$4,463.00$5,182.02$4,600.00$2,190.00
185Remove SM RD SN sup&AM (644-7073)EACH93$120.00$125.00$125.00$343.00$398.26$450.00$95.00
186Install LRSS (struct steel) (647-7001)LB7,062.90$6.50$12.00$8.30$6.65$7.72$7.00$6.35
187Install overhead sign support(30 FT bal tee) (650-7028)EACH3$86,500$46,200$90,000$85,850$99,681$87,000$46,243
188Install overhead sign support(30 FT cant) (650-7032)EACH1$40,500$52,000$50,845$59,037$52,000$44,131
189Install overhead sign support(35 FT cant) (650-7038)EACH1$41,350$60,000$58,570$68,215$60,000$47,418
190Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH16$50.00$90.00$86.00$90.00$46.05$60.00$44.75
191Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH13$50.00$90.00$86.00$90.00$46.05$60.00$44.75
192Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF34,886$0.75$0.76$0.75$0.86$1.00$0.75
193Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF41,360$0.75$0.76$0.75$0.86$1.00$0.75
194Work zone pavement marking removing (reflectorized) type II-C-R (662-7053)EACH639$6.00$6.50$6.62$6.50$7.48$8.00$6.50
195Work zone pavement marking removing (W)4"(broken) (662-7061)LF12,775$2.00$1.35$1.37$1.35$1.55$1.50$1.35
196Work zone pavement marking removing (W)4"(DOT) (662-7062)LF785$2.00$1.60$1.63$1.60$1.84$2.00$1.60
197Work zone pavement marking removing (W)4"(solid) (662-7064)LF86,720$2.00$1.00$1.02$1.00$1.15$1.25$1.00
198Work zone pavement marking removing (W)8"(solid) (662-7072)LF14,600$2.00$2.00$2.04$2.00$2.30$2.50$2.00
199Work zone pavement marking removing (W)12"(solid) (662-7075)LF300$5.00$12.00$12.21$12.00$13.82$15.00$12.00
200Work zone pavement marking removing (W)24"(solid) (662-7077)LF402$15.00$17.50$17.81$17.50$20.15$20.00$17.50
201Work zone pavement marking removing (W)18"(yld tri) (662-7093)EACH17$39.00$65.00$66.15$65.00$74.83$85.00$65.00
202Work zone pavement marking removing (Y)4"(solid) (662-7097)LF104,681$1.50$1.00$1.02$1.00$1.15$1.25$1.00
203Work zone pavement marking removing (Y)12"(solid) (662-7103)LF991$3.00$12.00$12.21$12.00$13.82$16.00$12.00
204Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF1,050$1.20$1.00$1.02$1.00$1.15$1.25$1.00
205Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF10,208$1.50$1.25$1.27$1.25$1.44$1.50$1.25
206Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027)LF578$2.50$2.54$2.50$2.88$2.75$2.50
207Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF693$5.00$7.50$7.63$7.50$8.63$7.75$7.50
208Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF347$11.00$11.00$11.20$11.00$12.66$12.00$11.00
209Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117)LF155$8.00$8.00$8.14$8.00$9.21$9.00$8.00
210Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF2,880$1.00$5.00$5.09$5.00$5.76$5.50$5.00
211Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF140$1.25$5.00$5.09$5.00$5.76$5.50$5.00
212Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF2,866$1.00$5.00$5.09$5.00$5.76$5.50$5.00
213Pavement sler 6" (666-7347)LF106,991$1.00$0.25$0.25$0.25$0.29$0.25$0.25
214Pavement sler 8" (666-7348)LF10,208$1.00$0.50$0.51$0.50$0.58$0.50$0.50
215Pavement sler 12" (666-7350)LF1,426$1.50$4.00$4.07$4.00$4.61$4.50$4.00
216Pavement sler 24" (666-7352)LF347$3.00$6.00$6.11$6.00$6.91$6.50$6.00
217Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF8,233$1.50$0.80$0.81$0.80$0.92$1.00$0.80
218Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF38,490$1.50$0.80$0.81$0.80$0.92$1.00$0.80
219Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF4,594$1.50$0.80$0.81$0.80$0.92$1.00$0.80
220Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF48,738$1.50$0.80$0.81$0.80$0.92$1.00$0.80
221Prefabricated PM type C (W)(arrow) (668-7091)EACH21$300.00$275.00$280.00$275.00$316.62$280.00$275.00
222Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH4$400.00$500.00$509.00$500.00$575.67$550.00$500.00
223Prefabricated PM type C (W)(word) (668-7103)EACH15$325.00$375.00$382.00$375.00$431.75$400.00$375.00
224Prefabricated PM type C (W)(RR crossing) (668-7108)EACH2$900.00$916.00$900.00$1,036.19$1,000.00$900.00
225Reflectorized pavement marker type I-C (672-7002)EACH608$7.00$6.00$6.11$6.00$6.91$7.00$6.00
226Reflectorized pavement marker type II-A-A (672-7004)EACH667$9.00$6.00$6.11$6.00$6.91$7.00$6.00
227Reflectorized pavement marker type II-C-R (672-7006)EACH506$5.00$6.00$6.11$6.00$6.91$7.00$6.00
228Eliminating existing PM & markers (6") (677-7002)LF38,754$4.00$1.25$1.27$1.25$1.44$1.50$1.25
229Eliminating existing PM & markers (8") (677-7004)LF1,672$1.50$1.35$1.37$1.35$1.55$1.75$1.35
230Eliminating existing PM & markers (24") (677-7008)LF94$5.50$6.00$6.11$6.00$6.91$8.00$6.00
231Eliminating existing PM & markers (arrow) (677-7009)EACH4$85.00$100.00$102.00$100.00$115.14$130.00$100.00
232Eliminating existing PM & markers (word) (677-7015)EACH2$90.00$100.00$102.00$100.00$115.14$130.00$100.00
233Eliminating existing PM & markers (rumble strip) (677-7030)LF17,708$2.00$0.35$4.25$0.13$0.01$0.50$1.53
234Relocate RDSD flash beacon assembly (685-7002)EACH2$15,000$6,000.00$5,915.00$6,867.96$8,000.00$5,714.52
235Remove luminaire pole (690-7127)EACH9$1.00$1,000.00$550.00$540.00$627.00$700.00$842.91
236Bonding course (3007-7001)GAL41,061$6.00$4.00$4.00$0.36$4.67$5.00$4.00
237ITS com CBL (ethernet) (6005-7001)LF810$6.00$2.75$11.35$11.25$13.06$12.00$23.84
238ITS pole (50 FT) (90 MPH) (6011-7005)EACH3$19,750$19,200$17,000$16,415$19,060$17,000$21,054
239ITS pole MNTD cab (type 2)(conf 1) (6011-7028)EACH3$7,900.00$6,800.00$8,000.00$7,465.00$8,667.68$7,750.00$10,084
240Installation of cellular modem (6015-7001)EACH3$2,000.00$850.00$1,800.00$1,780.00$2,066.77$1,800.00$1,014.75
241CCTV field equipment (digital) (6018-7002)EACH3$5,000.00$9,800.00$12,000$11,340$13,167$12,000$9,621.89
242CCTV mount (pole) (6018-7003)EACH3$1,035.00$450.00$1,500.00$1,420.00$1,648.77$1,500.00$427.76
243Full color matrix DMS (pole mounted) (6123-7001)EACH3$80,000$13,500$150,000$142,670$165,655$150,000$150,560
TxDOT contract A00062536: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy