FNF Construction, Inc.: TxDOT bid record
FNF Construction, Inc. submitted 78 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 06 AUG 2026, and was the low bidder on 15 of them (19%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $598,877,916
- Latest bid
- 06 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 17 | 3 | 18% |
| 2021 | 19 | 1 | 5% |
| 2022 | 10 | 1 | 10% |
| 2023 | 5 | 0 | 0% |
| 2024 | 10 | 5 | 50% |
| 2025 | 8 | 2 | 25% |
| 2026 | 9 | 3 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Odessa District | 45 | 10 | 22% |
| Abilene District | 7 | 3 | 43% |
| El Paso District | 5 | 0 | 0% |
| San Angelo District | 5 | 0 | 0% |
| Brownwood District | 4 | 0 | 0% |
| Amarillo District | 3 | 1 | 33% |
| Lubbock District | 2 | 0 | 0% |
| Loving | 2 | 1 | 50% |
| Austin District | 1 | 0 | 0% |
| Edwards | 1 | 0 | 0% |
| Corpus Christi District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 65 | 23 (35%) | $1.50 | $1.40 |
| Crash cushion attenuator (move & reset) | 545-7002 | EACH | 36 | 21 (58%) | $625.00 | $1,535.40 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 35 | 18 (51%) | $1.00 | $1.45 |
| Excavation (roadway) | 110-7001 | CY | 54 | 15 (28%) | $15.00 | $20.00 |
| Blading | 150-7002 | HR | 43 | 15 (35%) | $210.00 | $148.00 |
| Fog seal (CSS-1H) | 315-7004 | GAL | 29 | 15 (52%) | $3.65 | $5.00 |
| TMA (stationary) | 505-7001 | DAY | 70 | 14 (20%) | $213.50 | $230.00 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 42 | 14 (33%) | $4.88 | $5.00 |
| Portable changeable message sign | 503-7002 | EACH | 53 | 13 (25%) | $20,000 | $10,000 |
| Proof rolling | 216-7001 | HR | 49 | 13 (27%) | $115.00 | $115.00 |
| Asphalt (AC-20-5TR) | 316-7007 | GAL | 34 | 13 (38%) | $4.00 | $4.75 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 32 | 13 (41%) | $1.50 | $1.41 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Dirt & Paving Contractors, Inc. | 35 | 25 of 35 |
| RK Hall, LLC | 23 | 13 of 23 |
| Dan Williams Company | 18 | 8 of 18 |
| Reece Albert, Inc. | 17 | 11 of 17 |
| Kiewit Infrastructure South Co. | 16 | 8 of 16 |
| A. L. Helmcamp, Inc. | 14 | 5 of 14 |
| James Construction Group, LLC | 12 | 9 of 12 |
| Johnson Bros. Corporation, A Southland Company | 11 | 5 of 11 |
| Ragle Construction, Inc. | 11 | 6 of 11 |
| Webber, LLC | 9 | 4 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 AUG 2026 | A00199843 | Odessa District | Rehabilitate Existing Roadway, FM 2448 (SH 17 to IH 10) | 2 of 5 | $9,182,210 | +7.0% |
| 06 AUG 2026 | A00140254 | San Angelo District | Construct Rest Area, IH 10 (IH 10 Approx 3 miles Pecos County Line to .) | 6 of 6 | $21,852,939 | +59% |
| 05 AUG 2026 | A00187841 | Odessa District | Highway Improvement, IH 10 (1.2 MI E OF FM 3078 to 1.6 MI W OF FM 2903) | 1 of 5 | $14,980,840 | Low |
| 01 JUL 2026 | A00080576 | Odessa District | Construct Bridge, US 385 (AT SOUTH SL 338 to .) | 3 of 6 | $58,921,034 | +10% |
| 03 JUN 2026 | A00132662 | Abilene District | Widen Road - Add Lanes, IH 20 (FM 600 to SH 351) | 1 of 3 | $136,705,244 | Low |
| 06 MAY 2026 | A00200125 | Odessa District | Highway Improvement, SH 302 (SH 158 to 1.0 mi W of SL 338) | 5 of 5 | $12,957,366 | +40% |
| 07 APR 2026 | A00207258 | Lubbock District | Bridge Replacement, FM 835 (FM 835 to at NFK DBL MTN FK Brazos River) | 2 of 2 | $8,396,937 | +40% |
| 05 FEB 2026 | A00196659 | Odessa District | Rehabilitate Existing Roadway, IH 10 (1.8 mi W of FM 11 to FM 2886) | 1 of 7 | $14,714,263 | Low |
| 06 JAN 2026 | A00190019 | Childress District | Highway Improvement, US 83 (FM 1038, South to King C/L) | 5 of 9 | $51,673,397 | +11% |
| 02 DEC 2025 | A00206578 | Amarillo District | Hazard Elimination & Safety, US 385 (US 87 to SH 354 IN CHANNING) | 3 of 6 | $18,297,530 | +15% |
| 08 OCT 2025 | A00062536 | Abilene District | Interchange Improvement (New Or Update), US 83 (AT to US 83/84 "Y" INTERCHANGE) | 5 of 9 | $76,984,994 | +6.0% |
| 04 SEP 2025 | A00127796 | Amarillo District | Construct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE) | 1 of 6 | $99,678,127 | Low, 29% under the second |
| 02 JUL 2025 | A00125917 | Odessa District | Highway Improvement, SH 18 (South of IH 20 to South of FM 1776) | 2 of 7 | $18,598,136 | +8.0% |
| 01 JUL 2025 | A00214692 | Odessa District | MILL AND INLAY, IH0010 (VARIOUS to VARIOUS) | 4 of 5 | $2,214,738 | +24% |
| 05 MAR 2025 | A00208564 | Odessa District | Highway Improvement, US 285 (CR 232 to SH 302) | 1 of 6 | $10,373,162 | Low, 6.0% under the second |
| 06 FEB 2025 | A00121423 | San Angelo District | Preventive Maintenance, IH 10 (Pecos County line to 15.9 miles E of Pecos County line) | 5 of 6 | $30,265,623 | +23% |
| 06 FEB 2025 | A00199805 | Odessa District | Highway Improvement, SH 115 (Sycamore St to CR 133) | 5 of 7 | $3,565,284 | +34% |
| 07 NOV 2024 | A00005346 | Abilene District | Construct Rest Area, IH 20 (From 0.7 miles east of CR 226 to 1.9 miles east of CR 226) | 1 of 3 | $34,593,730 | Low, 0.0% under the second |
| 07 NOV 2024 | A00180194 | Odessa District | Highway Improvement, IH 20 (3.5 MI W OF FM 2903 to 0.35 MI W OF CR 210) | 1 of 6 | $31,497,131 | Low, 6.0% under the second |
| 06 NOV 2024 | A00178419 | Odessa District | Highway Improvement, IH 20 (0.35 Miles W of CR 210 to 0.15 MI W OF CR 209) | 1 of 6 | $27,943,635 | Low, 18% under the second |
| 02 AUG 2024 | 08243203 | San Angelo District | US 67 Preventive maintenance from TOM GREEN COUNTY LINE to 10.2 MI SOUTH OF TOM GREEN CO LINE | 3 of 5 | $56,263,862 | +8.0% |
| 09 JUL 2024 | 07243005 | Abilene District | US 83 Widen road - add shoulders from .67 MILES NORTH OF FM 3034 to .28 MILES SOUTH OF FM 3034 | 1 of 3 | $39,496,851 | Low, 6.0% under the second |
| 06 JUN 2024 | 06243207 | Odessa District | FM 846 Highway improvement from SH 137 to HOWARD COUNTY LINE | 3 of 4 | $32,469,431 | +20% |
| 05 JUN 2024 | 06243006 | Brownwood District | FM 45 Reconstruct existing roadway from MILLS C/L to FM 502 | 2 of 4 | $36,946,650 | +14% |
| 04 APR 2024 | 04243017 | El Paso District | US 85 Bridge replacement from US 85 EB to RIO GRANDE RIVER | 4 of 4 | $9,203,572 | +87% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.