TxDOT contract A00132662 bid tabulation
Widen Road - Add Lanes, IH 20 (FM 600 to SH 351). Let by Texas DOT on June 3, 2026, Taylor, Abilene District. 3 bids received; low bid $136,705,244 by FNF Construction, Inc., +8.2% against the engineer's estimate of $126,337,929.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 368
- Data through
- 19 NOV 2026
1 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | FNF Construction, Inc. | $136,705,244 | Low | +8.0% |
Engineer's estimate: $126,337,929.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. FNF Construction, Inc. |
|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 72.43 | $20,000 | $500.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 8,940 | $14.00 | $17.00 |
| 3 | Removing concrete (mowstrip) (104-7003) | SY | 3,075 | $17.00 | $33.00 |
| 4 | Removing concrete (riprap) (104-7006) | SY | 7,357 | $20.00 | $18.00 |
| 5 | Removing concrete (medians) (104-7008) | SY | 810 | $20.00 | $37.00 |
| 6 | Removing concrete (driveways) (104-7011) | SY | 2,213 | $25.00 | $20.50 |
| 7 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 1,056 | $25.00 | $21.00 |
| 8 | Removing concrete (curb) (104-7016) | LF | 8,122 | $7.00 | $10.00 |
| 9 | Removing concrete (curb & gutter) (104-7017) | LF | 23,012 | $8.00 | $11.00 |
| 10 | Removing concrete (rail) (104-7036) | LF | 1,142 | $30.00 | $23.00 |
| 11 | Remove (6"-10") TRT/untrt base & asphalt pavement (105-7006) | SY | 824 | $8.00 | $26.00 |
| 12 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 49,570 | $7.00 | $2.00 |
| 13 | Remove (24") TRT/untrt base & asphalt pavement (105-7044) | SY | 38,736 | $10.00 | $1.50 |
| 14 | Excavation (roadway) (110-7001) | CY | 56,979 | $16.00 | $12.00 |
| 15 | Excavation (special) (110-7003) | CY | 3,279 | $22.00 | $12.00 |
| 16 | Embankment (final)(OC)(type C1) (132-7007) | CY | 192,911 | $30.00 | $58.00 |
| 17 | Embankment (final)(DC)(type C2) (132-7010) | CY | 241,286 | $17.00 | $10.00 |
| 18 | Furn & place topsoil (4") (160-7009) | STA | 74 | $800.00 | $1,800.00 |
| 19 | Drill seed (permanent_rural_clay) (164-7042) | ACRE | 14.75 | $800.00 | $615.00 |
| 20 | Drill seed (temporary_warm_cool) (164-7047) | ACRE | 14.75 | $800.00 | $520.00 |
| 21 | Vegetative watering (168-7001) | TGL | 579.73 | $35.00 | $90.00 |
| 22 | Soil ret BLKT(SL_mod_clay_short) (169-7001) | SY | 2,147 | $5.00 | $3.00 |
| 23 | Proof rolling (216-7001) | HR | 1,000 | $100.00 | $100.00 |
| 24 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 172,189 | $14.00 | $9.00 |
| 25 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 10,802 | $20.00 | $12.00 |
| 26 | FL BS (roadway del)(type A GR 1-2)(final pos) (247-7259) | CY | 3,279 | $100.00 | $45.00 |
| 27 | Lime (com or QK)(slurry) (260-7005) | TON | 1,615 | $320.00 | $350.00 |
| 28 | Lime TRT (existing material)(6") (260-7006) | SY | 86,789 | $4.00 | $2.50 |
| 29 | Lime TRT (existing material)(8") (260-7007) | SY | 5,573 | $8.00 | $5.00 |
| 30 | Cement (275-7001) | TON | 2,480 | $265.00 | $250.00 |
| 31 | Cement TRT (new base)(6") (275-7010) | SY | 172,189 | $2.50 | $2.00 |
| 32 | Salvage,haul & stockpile reclaimed asphalt PV (12"TO18") (305-7027) | SY | 61,567 | $12.00 | $10.00 |
| 33 | Salvage haul & stockpile reclaimed asphalt PV (6") (305-7032) | SY | 49,570 | $11.00 | $4.50 |
| 34 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 45,768 | $5.00 | $5.50 |
| 35 | D-GR HMA type-B PG64-22 (341-7001) | TON | 30,273 | $250.00 | $140.00 |
| 36 | D-GR HMA type-C PG64-22 (341-7015) | TON | 550 | $260.00 | $160.00 |
| 37 | Tack coat (341-7082) | GAL | 692 | $5.00 | $7.00 |
| 38 | SP mixes SP-C PG70-22 (344-7019) | TON | 1,330 | $260.00 | $150.00 |
| 39 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 1,342 | $280.00 | $165.00 |
| 40 | Tack coat (344-7077) | GAL | 2,639 | $5.00 | $7.00 |
| 41 | Stone-MTRX-asphalt SMA-D PG76-22 (346-7015) | TON | 2,026 | $340.00 | $180.00 |
| 42 | Tack coat (346-7028) | GAL | 3,448 | $5.00 | $6.50 |
| 43 | Flexible pavement structure repair(4") (351-7003) | SY | 250 | $40.00 | $140.00 |
| 44 | Planing asphalt concrete pavement(2") (354-7051) | SY | 7,248 | $4.00 | $3.00 |
| 45 | Planing asphalt concrete pavement (1.5") (354-7074) | SY | 19,820 | $2.00 | $1.50 |
| 46 | Concrete pavement (CRCP) (9") (360-7003) | SY | 7,597 | $95.00 | $150.00 |
| 47 | Concrete pavement (CRCP) (10") (360-7004) | SY | 66,717 | $95.00 | $138.00 |
| 48 | Concrete pavement (CRCP) (13") (360-7007) | SY | 84,216 | $105.00 | $149.00 |
| 49 | Concrete pavement(transition slab) (10") (360-7033) | SY | 402 | $200.00 | $130.00 |
| 50 | Concrete pavement(transition slab) (13") (360-7036) | SY | 268 | $210.00 | $150.00 |
| 51 | Concrete pavement (CRCP)(hes) (13") (360-7052) | SY | 3,965 | $215.00 | $185.00 |
| 52 | Struct excavation (bridge) (400-7004) | CY | 9,489.60 | $45.00 | $25.00 |
| 53 | Cem stabil BKFL (400-7010) | CY | 13,441.40 | $130.00 | $100.00 |
| 54 | Trench excavation protection (402-7001) | LF | 12,576 | $3.00 | $15.00 |
| 55 | Temporary special shoring (403-7001) | SF | 65,156 | $15.00 | $2.00 |
| 56 | Drilled shaft (18 in) (416-7002) | LF | 754 | $150.00 | $150.00 |
| 57 | Drilled shaft (36 in) (416-7006) | LF | 9,299 | $270.00 | $325.00 |
| 58 | Drilled shaft (48 in) (416-7008) | LF | 63 | $400.00 | $640.00 |
| 59 | Drilled shaft (non - reinforced) (12 in) (416-7024) | LF | 27 | $150.00 | $220.00 |
| 60 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 186 | $260.00 | $225.00 |
| 61 | Drilled shaft (sign mounts) (42 in) (416-7031) | LF | 19 | $540.00 | $500.00 |
| 62 | Drilled shaft (sign mounts) (48 in) (416-7032) | LF | 41 | $600.00 | $600.00 |
| 63 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 119 | $710.00 | $700.00 |
| 64 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 346 | $910.00 | $900.00 |
| 65 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $450.00 | $350.00 |
| 66 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 78 | $475.00 | $400.00 |
| 67 | Class A concrete (collar) (420-7008) | EACH | 2 | $1,700.00 | $900.00 |
| 68 | Class C concrete (abutment)(HPC) (420-7013) | CY | 752.60 | $1,300.00 | $1,600.00 |
| 69 | Class C concrete (cap)(HPC) (420-7023) | CY | 567.70 | $1,300.00 | $1,700.00 |
| 70 | Class C concrete (column)(HPC) (420-7039) | CY | 447.50 | $1,350.00 | $1,100.00 |
| 71 | Class C concrete (rail foundation) (420-7052) | CY | 317 | $850.00 | $1,100.00 |
| 72 | Reinforced concrete slab (HPC) (422-7002) | SF | 183,676 | $30.00 | $33.00 |
| 73 | Approach slab (HPC) (422-7014) | CY | 1,254.10 | $800.00 | $1,000.00 |
| 74 | Retaining wall (MSE) (423-7001) | SF | 201,671 | $60.00 | $54.00 |
| 75 | Retaining wall (temporary wall) (423-7012) | SF | 48,437 | $20.00 | $28.00 |
| 76 | Prestressed concrete girder (TX46) (425-7004) | LF | 19,494.59 | $250.00 | $290.00 |
| 77 | Prestressed concrete girder (TX54) (425-7005) | LF | 6,828.84 | $260.00 | $280.00 |
| 78 | Riprap (concrete)(4 in) (432-7001) | CY | 2,632.48 | $600.00 | $550.00 |
| 79 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 91 | $750.00 | $610.00 |
| 80 | Riprap (mow strip)(4 in) (432-7013) | CY | 386 | $650.00 | $600.00 |
| 81 | Riprap (stone protection)(18 in) (432-7043) | CY | 5,876 | $200.00 | $240.00 |
| 82 | Rail (type T223)(HPC) (450-7009) | LF | 1,254.30 | $150.00 | $190.00 |
| 83 | Rail (type SSTR) (450-7024) | LF | 18,614 | $65.00 | $97.00 |
| 84 | Rail (type SSTR)(HPC) (450-7025) | LF | 3,902.80 | $70.00 | $124.00 |
| 85 | Rail (type C223) (450-7034) | LF | 2,676 | $110.00 | $213.00 |
| 86 | Rail (type C223)(HPC) (450-7035) | LF | 2,444 | $175.00 | $216.00 |
| 87 | Rail (type PR22) (450-7045) | LF | 566 | $190.00 | $210.00 |
| 88 | Rail (handrail)(type E) (450-7062) | LF | 30 | $190.00 | $235.00 |
| 89 | Rail (type SSTR)(mod) (450-7066) | LF | 430 | $300.00 | $350.00 |
| 90 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 1,274 | $230.00 | $265.00 |
| 91 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 144 | $400.00 | $575.00 |
| 92 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 78 | $210.00 | $540.00 |
| 93 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 402 | $440.00 | $450.00 |
| 94 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 859 | $500.00 | $480.00 |
| 95 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 1,575 | $550.00 | $600.00 |
| 96 | Concrete box culvert (6 FT X 4 FT) (462-7012) | LF | 1,545 | $615.00 | $635.00 |
| 97 | Concrete box culvert (8 FT X 6 FT) (462-7023) | LF | 594 | $1,400.00 | $4,700.00 |
| 98 | RC pipe (CL III)(18 in) (464-7003) | LF | 0 | $100.00 | $0.00 |
| 99 | RC pipe (CL III)(24 in) (464-7005) | LF | 0 | $145.00 | $0.00 |
| 100 | RC pipe (CL III)(30 in) (464-7007) | LF | 0 | $155.00 | $0.00 |
| 101 | RC pipe (CL III)(36 in) (464-7009) | LF | 0 | $200.00 | $0.00 |
| 102 | RC pipe (CL III)(42 in) (464-7010) | LF | 0 | $240.00 | $0.00 |
| 103 | RC pipe (CL IV)(24 in) (464-7021) | LF | 141 | $215.00 | $210.00 |
| 104 | Manh (complete)(PRM)(60IN) (465-7003) | EACH | 9 | $10,000 | $13,000 |
| 105 | Manh (complete)(PRM)(72IN) (465-7004) | EACH | 11 | $11,500 | $15,000 |
| 106 | Junction box(complete)(PJB)(3FTX3FT) (465-7005) | EACH | 11 | $6,200.00 | $8,000.00 |
| 107 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 4 | $13,500 | $12,000 |
| 108 | Junction box(complete)(PJB)(6FTX6FT) (465-7011) | EACH | 2 | $14,000 | $17,000 |
| 109 | Inlet (complete)(pco)(3FT)(none) (465-7013) | EACH | 5 | $7,500.00 | $6,500.00 |
| 110 | Inlet (complete)(pco)(3FT)(left) (465-7014) | EACH | 10 | $7,600.00 | $7,000.00 |
| 111 | Inlet (complete)(pco)(3FT)(right) (465-7015) | EACH | 7 | $7,600.00 | $7,000.00 |
| 112 | Inlet (complete)(pco)(4FT)(none) (465-7017) | EACH | 1 | $9,300.00 | $7,500.00 |
| 113 | Inlet (complete)(pco)(4FT)(left) (465-7018) | EACH | 1 | $9,000.00 | $9,000.00 |
| 114 | Inlet (complete)(pco)(4FT)(right) (465-7019) | EACH | 3 | $7,700.00 | $8,500.00 |
| 115 | Inlet (complete)(pco)(5FT)(left) (465-7022) | EACH | 1 | $11,250 | $11,000 |
| 116 | Inlet (complete)(pcu)(3FT)(none) (465-7029) | EACH | 1 | $8,700.00 | $7,500.00 |
| 117 | Inlet (complete)(PMBD)(4FT) (465-7045) | EACH | 9 | $6,500.00 | $9,500.00 |
| 118 | Inlet (complete)(PMBD)(5FT) (465-7046) | EACH | 3 | $10,200 | $13,000 |
| 119 | Inlet (complete)(PMBD)(6FT) (465-7047) | EACH | 1 | $14,000 | $12,500 |
| 120 | Inlet (complete)(PSL)(RH)(5FTX5FT) (465-7066) | EACH | 3 | $12,500 | $700.00 |
| 121 | Inlet (complete)(PSL)(RH)(6FTX6FT) (465-7068) | EACH | 2 | $14,200 | $700.00 |
| 122 | Inlet (complete)(PSL)(RH)(8FTX8FT) (465-7069) | EACH | 5 | $19,000 | $700.00 |
| 123 | Inlet (complete)(PSL)(SH)(5FTX5FT-4FTX4FT) (465-7095) | EACH | 2 | $13,750 | $8,000.00 |
| 124 | Inlet (complete)(PSL)(SH)(6FTX6FT-4FTX4FT) (465-7101) | EACH | 3 | $14,375 | $12,000 |
| 125 | Inlet (complete)(PSL)(SH)(8FTX8FT-4FTX4FT) (465-7104) | EACH | 3 | $27,500 | $19,000 |
| 126 | Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126) | EACH | 5 | $6,500.00 | $3,000.00 |
| 127 | Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128) | EACH | 17 | $9,700.00 | $4,500.00 |
| 128 | Inlet(complete)(pazd)(FG)(4FTX4FT-4FTX4FT) (465-7160) | EACH | 5 | $11,000 | $5,500.00 |
| 129 | Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162) | EACH | 1 | $11,500 | $6,500.00 |
| 130 | Inlet (complete) (type MSE2) (465-7352) | EACH | 30 | $12,500 | $6,500.00 |
| 131 | Manh(top & riser only) (465-7405) | EACH | 3 | $5,000.00 | $2,200.00 |
| 132 | Wingwall (PW - 1) (HW=11 FT) (466-7181) | EACH | 2 | $65,000 | $22,500 |
| 133 | Set (type I)(S= 3 FT)(HW= 2 FT)(6:1)(P) (467-7039) | EACH | 2 | $4,200.00 | $15,000 |
| 134 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 0 | $1,200.00 | $0.00 |
| 135 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 0 | $2,000.00 | $0.00 |
| 136 | Jack bor or tun pipe(24 in)(RC)(CL III) (476-7011) | LF | 101 | $1,925.00 | $350.00 |
| 137 | Jack bor tun box culvert (4 FT X 3 FT) (476-7043) | LF | 67 | $4,500.00 | $1,350.00 |
| 138 | Adjusting manholes (479-7001) | EACH | 1 | $3,000.00 | $1,750.00 |
| 139 | Adjusting manholes & inlets (479-7003) | EACH | 45 | $2,000.00 | $550.00 |
| 140 | Adjusting inlets (cap) (479-7006) | EACH | 3 | $3,200.00 | $1,700.00 |
| 141 | Clean existing culverts (480-7001) | EACH | 1 | $3,400.00 | $6,000.00 |
| 142 | Removing structure (box culvert) (496-7001) | EACH | 9 | $2,000.00 | $7,500.00 |
| 143 | Removing structure (inlet) (496-7002) | EACH | 1 | $1,200.00 | $2,200.00 |
| 144 | Removing structure (set) (496-7004) | EACH | 8 | $600.00 | $700.00 |
| 145 | Removing structure (wingwall) (496-7005) | EACH | 5 | $2,000.00 | $2,000.00 |
| 146 | Removing structure (pipe) (496-7007) | LF | 1,766 | $25.00 | $15.00 |
| 147 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 8 | $135,000 | $100,000 |
| 148 | Mobilization (500-7001) | LS | 1 | $10,832,954 | $13,000,000 |
| 149 | Barricades, signs and traffic handling (502-7001) | MO | 40 | $50,000 | $30,000 |
| 150 | Portable changeable message sign (503-7002) | EACH | 12 | $20,000 | $10,000 |
| 151 | TMA (stationary) (505-7001) | DAY | 94 | $300.00 | $275.00 |
| 152 | TMA (mobile operation) (505-7003) | DAY | 120 | $300.00 | $600.00 |
| 153 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,680 | $45.00 | $55.00 |
| 154 | Rock filter dams (install) (type 3) (506-7003) | LF | 80 | $85.00 | $85.00 |
| 155 | Rock filter dams (remove) (506-7011) | LF | 1,760 | $15.00 | $14.00 |
| 156 | Construction exits (install) (type 1) (506-7020) | SY | 2,464 | $25.00 | $50.00 |
| 157 | Construction exits (remove) (506-7024) | SY | 2,464 | $10.00 | $3.25 |
| 158 | Temporary sediment control fence (install) (506-7039) | LF | 15,910 | $5.00 | $4.25 |
| 159 | Temporary sediment control fence (remove) (506-7041) | LF | 15,910 | $1.50 | $1.00 |
| 160 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 4,555 | $8.00 | $9.00 |
| 161 | Biodegradable erosion control logs (remove) (506-7046) | LF | 4,555 | $2.00 | $1.00 |
| 162 | Constructing detours (type 1) (508-7003) | SY | 46,500 | $100.00 | $130.00 |
| 163 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 30,930 | $30.00 | $110.00 |
| 164 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 14,420 | $20.00 | $40.00 |
| 165 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 420 | $35.00 | $40.00 |
| 166 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 31,590 | $7.00 | $4.00 |
| 167 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 36,620 | $8.00 | $4.00 |
| 168 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 740 | $12.00 | $65.00 |
| 169 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 30,930 | $14.90 | $5.50 |
| 170 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 14,420 | $17.00 | $5.50 |
| 171 | Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046) | LF | 420 | $22.00 | $50.00 |
| 172 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 6,462 | $100.00 | $123.00 |
| 173 | Permanent CTB (tran SSCB to SSTR) (mod) (514-7038) | LF | 126 | $600.00 | $274.00 |
| 174 | Prem CTB (trans T223 to SSTR) (514-7055) | LF | 36 | $600.00 | $343.00 |
| 175 | Concrete curb (mono) (type II) (529-7007) | LF | 8,218 | $8.00 | $24.00 |
| 176 | Concrete curb & gutter (type II) (529-7009) | LF | 1,555 | $40.00 | $31.00 |
| 177 | Concrete curb (doweled) (529-7012) | LF | 8,824 | $20.00 | $25.00 |
| 178 | Concrete curb (slotted) (529-7013) | LF | 62 | $50.00 | $28.00 |
| 179 | Concrete curb (type F3) (529-7022) | LF | 30 | $200.00 | $243.00 |
| 180 | Driveways (concrete) (530-7006) | SY | 2,321 | $130.00 | $133.00 |
| 181 | Driveways (concrete) (hes) (530-7007) | SY | 656 | $185.00 | $140.00 |
| 182 | Concrete sidewalks (6") (531-7003) | SY | 17,112 | $115.00 | $80.00 |
| 183 | Curb ramps (type 3) (531-7017) | SY | 312 | $210.00 | $185.00 |
| 184 | Curb ramps (type 7) (531-7020) | SY | 140 | $230.00 | $191.00 |
| 185 | Curb ramps (type 21) (531-7023) | SY | 37 | $250.00 | $202.00 |
| 186 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 7,419 | $0.75 | $2.00 |
| 187 | Concrete median (536-7002) | SY | 266 | $75.00 | $124.00 |
| 188 | Metal W-beam guard fence (timber post) (540-7001) | LF | 789 | $25.00 | $32.00 |
| 189 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 7 | $2,500.00 | $2,520.00 |
| 190 | Remove metal beam guard fence (542-7001) | LF | 6,804 | $3.00 | $3.75 |
| 191 | Remove terminal anchor section (542-7002) | EACH | 1 | $275.00 | $323.00 |
| 192 | Remove downstream anchor terminal (542-7003) | EACH | 11 | $400.00 | $323.00 |
| 193 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 18 | $350.00 | $323.00 |
| 194 | RM metal beam guard fence trans (T101) (542-7005) | EACH | 4 | $275.00 | $323.00 |
| 195 | Cable barrier terminal sec (install)(TL-3) (543-7017) | EACH | 1 | $7,000.00 | $4,390.00 |
| 196 | Cable barrier (remove) (543-7037) | LF | 6,405 | $5.00 | $6.00 |
| 197 | Guardrail end treatment (install) (544-7001) | EACH | 7 | $3,500.00 | $4,130.00 |
| 198 | Guardrail end treatment (remove) (544-7003) | EACH | 18 | $280.00 | $323.00 |
| 199 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 12 | $2,000.00 | $217.00 |
| 200 | Crash cushion attenuator (remove) (545-7004) | EACH | 13 | $1,000.00 | $875.00 |
| 201 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 8 | $30,000 | $26,400 |
| 202 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 13 | $9,000.00 | $14,400 |
| 203 | Pipe underdrains (type 6) (6") (556-7006) | LF | 14,466 | $23.00 | $35.00 |
| 204 | Remove RD IL asm (CTB mount) (610-7008) | EACH | 5 | $876.00 | $470.00 |
| 205 | Remove RD IL asm (trans-base) (610-7009) | EACH | 24 | $1,000.00 | $470.00 |
| 206 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 12 | $1,800.00 | $1,750.00 |
| 207 | In RD IL (U/P) (type 2) (150W EQ) LED (610-7016) | EACH | 4 | $1,800.00 | $1,750.00 |
| 208 | HI MST IL pole (150 FT)( 80 MPH) (613-7005) | EACH | 10 | $56,500 | $55,000 |
| 209 | HI MST IL pole (175 FT)( 80 MPH) (613-7007) | EACH | 2 | $69,000 | $70,000 |
| 210 | LED HI MST IL asm (6 fixt) (type B) (614-7003) | EACH | 12 | $40,500 | $50,000 |
| 211 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 6,075 | $14.00 | $18.00 |
| 212 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 820 | $16.00 | $18.00 |
| 213 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,820 | $32.00 | $40.00 |
| 214 | Conduit (PVC) (schedule 80) (2") (concrete encse) (618-7057) | LF | 60 | $30.00 | $30.00 |
| 215 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,345 | $35.00 | $19.00 |
| 216 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 2,620 | $33.00 | $35.00 |
| 217 | Conduit (RM) (1") (618-7072) | LF | 470 | $45.00 | $32.00 |
| 218 | Electrical conductor (no.12) bare (620-7003) | LF | 1,765 | $1.50 | $1.75 |
| 219 | Electrical conductor (no.12) insulated (620-7004) | LF | 3,530 | $2.00 | $2.00 |
| 220 | Electrical conductor (no.8) bare (620-7007) | LF | 8,015 | $2.00 | $2.00 |
| 221 | Electrical conductor (no.8) insulated (620-7008) | LF | 15,600 | $2.50 | $2.00 |
| 222 | Electrical conductor (no.6) bare (620-7009) | LF | 6,100 | $2.25 | $2.25 |
| 223 | Electrical conductor (no.6) insulated (620-7010) | LF | 765 | $2.50 | $2.50 |
| 224 | Tray cable (3 conductor) (8 AWG) (621-7004) | LF | 2,240 | $4.00 | $6.00 |
| 225 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 3 | $5,000.00 | $6,000.00 |
| 226 | Ground box type A (122311) (624-7001) | EACH | 2 | $1,500.00 | $900.00 |
| 227 | Ground box type A (122311)W/apron (624-7002) | EACH | 20 | $1,700.00 | $1,000.00 |
| 228 | Ground box type D (162922) (624-7007) | EACH | 12 | $2,000.00 | $1,200.00 |
| 229 | Ground box type D (162922)W/apron (624-7008) | EACH | 25 | $1,800.00 | $1,200.00 |
| 230 | Remove ground box (624-7013) | EACH | 18 | $500.00 | $300.00 |
| 231 | Remove electrical services (628-7002) | EACH | 2 | $1,000.00 | $600.00 |
| 232 | Elc SRV type A 240/480 060(SS)SS(E)SP(O) (628-7057) | EACH | 3 | $9,785.00 | $9,000.00 |
| 233 | Elc SRV type A 240/480 100(SS)SS(E)SP(O) (628-7091) | EACH | 1 | $10,200 | $9,000.00 |
| 234 | Elc SRV type A 240/480 150(NS)SS(E)SP(O) (628-7108) | EACH | 1 | $10,850 | $10,000 |
| 235 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 4 | $7,100.00 | $6,000.00 |
| 236 | Aluminum signs (type A) (636-7001) | SF | 45 | $40.00 | $30.00 |
| 237 | Aluminum signs (type G) (636-7002) | SF | 1,552 | $40.00 | $30.00 |
| 238 | Aluminum signs (type O) (636-7003) | SF | 1,711 | $40.00 | $32.00 |
| 239 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 79 | $950.00 | $800.00 |
| 240 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 32 | $1,000.00 | $850.00 |
| 241 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $1,250.00 | $1,100.00 |
| 242 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 25 | $1,200.00 | $1,200.00 |
| 243 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 5 | $1,250.00 | $1,300.00 |
| 244 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 3 | $1,800.00 | $1,400.00 |
| 245 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 4 | $3,250.00 | $2,500.00 |
| 246 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 15 | $4,500.00 | $6,500.00 |
| 247 | Remove SM RD SN sup&AM (644-7073) | EACH | 83 | $300.00 | $175.00 |
| 248 | Install LRSS (struct steel) (647-7001) | LB | 11,095.77 | $15.00 | $9.00 |
| 249 | Relocate lrsa (647-7002) | EACH | 2 | $3,000.00 | $2,500.00 |
| 250 | Remove lrsa (647-7003) | EACH | 8 | $2,000.00 | $600.00 |
| 251 | Install overhead sign support(25 FT cant) (650-7025) | EACH | 2 | $40,000 | $40,000 |
| 252 | Install overhead sign support(30 FT cant) (650-7032) | EACH | 1 | $42,500 | $50,000 |
| 253 | Install overhead sign support(35 FT cant) (650-7038) | EACH | 3 | $45,000 | $52,000 |
| 254 | Install overhead sign support(40 FT cant) (650-7045) | EACH | 2 | $70,000 | $55,000 |
| 255 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 4 | $100.00 | $90.00 |
| 256 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 182 | $45.00 | $55.00 |
| 257 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 9 | $45.00 | $60.00 |
| 258 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 30 | $40.00 | $55.00 |
| 259 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 75 | $35.00 | $55.00 |
| 260 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 9 | $35.00 | $60.00 |
| 261 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 124 | $50.00 | $30.00 |
| 262 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 26 | $50.00 | $29.00 |
| 263 | Install OM LG RD sign (2-OM-PW)Y (658-7321) | EACH | 5 | $50.00 | $35.00 |
| 264 | Install OM LG RD sign (3-OM-PW)Y (658-7322) | EACH | 7 | $50.00 | $40.00 |
| 265 | Install OM SM RD sign (1-OM-odcon)R (658-7330) | EACH | 10 | $50.00 | $80.00 |
| 266 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 11,771 | $1.00 | $1.30 |
| 267 | Work zone pavement marking removing (W)6"(DOT) (662-7066) | LF | 2,182 | $2.00 | $1.30 |
| 268 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 98,033 | $0.80 | $1.00 |
| 269 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 386 | $3.00 | $1.35 |
| 270 | Work zone pavement marking removing (W)8"(lane drop) (662-7071) | LF | 1,000 | $2.00 | $1.35 |
| 271 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 14,884 | $2.00 | $1.25 |
| 272 | Work zone pavement marking removing (W)12"(solid) (662-7075) | LF | 2,782 | $4.00 | $12.00 |
| 273 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 94 | $18.00 | $14.00 |
| 274 | Work zone pavement marking removing (W)(arrow) (662-7082) | EACH | 17 | $120.00 | $525.00 |
| 275 | Work zone pavement marking removing (W)(word) (662-7092) | EACH | 16 | $120.00 | $725.00 |
| 276 | Work zone pavement marking removing (W)18"(yld tri) (662-7093) | EACH | 94 | $65.00 | $80.00 |
| 277 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 114,667 | $0.80 | $1.00 |
| 278 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,400 | $1.50 | $5.25 |
| 279 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 60 | $1.50 | $5.25 |
| 280 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 388 | $1.00 | $1.60 |
| 281 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 22,123 | $0.75 | $1.00 |
| 282 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 4,110 | $1.00 | $1.00 |
| 283 | Reflectorized pavement marking type III (W)(6")(DOT) (666-7238) | LF | 1,460 | $4.00 | $1.10 |
| 284 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 11,266 | $1.25 | $1.20 |
| 285 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 3,101 | $3.00 | $2.20 |
| 286 | Reflectorized pavement marking type III (W)(12")(DOT) (666-7243) | LF | 117 | $3.00 | $2.75 |
| 287 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 39,980 | $0.75 | $1.00 |
| 288 | Reflectorized pavement marking type III (Y)(12")(solid) (666-7252) | LF | 393 | $4.00 | $2.25 |
| 289 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 4,320 | $1.00 | $1.00 |
| 290 | All-WTHR PM type III (W)6"(broken)(025 mil) (666-7340) | LF | 4,300 | $1.00 | $1.20 |
| 291 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,220 | $0.50 | $1.60 |
| 292 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 6,679 | $3.00 | $1.60 |
| 293 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 190 | $0.75 | $1.60 |
| 294 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 9,075 | $0.50 | $1.60 |
| 295 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 1,624 | $20.00 | $22.00 |
| 296 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 20 | $350.00 | $350.00 |
| 297 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 10 | $300.00 | $550.00 |
| 298 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 6 | $350.00 | $600.00 |
| 299 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 3 | $175.00 | $375.00 |
| 300 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 21 | $455.00 | $390.00 |
| 301 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 26 | $15.00 | $42.00 |
| 302 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 12 | $30.00 | $65.00 |
| 303 | Plowable reflectorized pavement marker type I-C (672-7011) | EACH | 44 | $15.00 | $80.00 |
| 304 | Plowable reflectorized pavement marker type II-A-A (672-7013) | EACH | 193 | $50.00 | $80.00 |
| 305 | Plowable reflectorized pavement marker type II-C-R (672-7015) | EACH | 1,185 | $50.00 | $80.00 |
| 306 | Recessed reflectorized pavement marker type I-C (672-7023) | EACH | 24 | $30.00 | $130.00 |
| 307 | Recessed reflectorized pavement marker type II-A-A (672-7025) | EACH | 87 | $30.00 | $130.00 |
| 308 | Recessed reflectorized pavement marker type II-C-R (672-7027) | EACH | 125 | $30.00 | $130.00 |
| 309 | Eliminating existing PM & markers (6") (677-7002) | LF | 21,464 | $0.80 | $3.25 |
| 310 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,503 | $1.00 | $4.00 |
| 311 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,449 | $1.50 | $4.25 |
| 312 | Eliminating existing PM & markers (24") (677-7008) | LF | 603 | $5.00 | $5.25 |
| 313 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 18 | $80.00 | $110.00 |
| 314 | Eliminating existing PM & markers (word) (677-7015) | EACH | 12 | $80.00 | $165.00 |
| 315 | Install highway traffic signal (system) (680-7003) | EACH | 2 | $46,000 | $50,000 |
| 316 | Removing traffic signals (680-7004) | EACH | 1 | $13,000 | $5,500.00 |
| 317 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 26 | $350.00 | $325.00 |
| 318 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 9 | $350.00 | $325.00 |
| 319 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 26 | $350.00 | $325.00 |
| 320 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 9 | $350.00 | $325.00 |
| 321 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 26 | $350.00 | $325.00 |
| 322 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 5 | $350.00 | $325.00 |
| 323 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 20 | $950.00 | $750.00 |
| 324 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 23 | $200.00 | $160.00 |
| 325 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 8 | $300.00 | $250.00 |
| 326 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 6,175 | $3.00 | $3.00 |
| 327 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 6,980 | $3.50 | $4.00 |
| 328 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 5,245 | $2.00 | $1.80 |
| 329 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $14,500 | $15,000 |
| 330 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $14,000 | $14,000 |
| 331 | Ins traffic signal PL AM(S)1 arm(40') (686-7041) | EACH | 1 | $16,000 | $15,000 |
| 332 | Ins traffic signal PL AM(S)1 arm(44') (686-7045) | EACH | 2 | $18,500 | $15,000 |
| 333 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 2 | $20,000 | $20,000 |
| 334 | Pedestrian pole assembly (687-7001) | EACH | 19 | $3,250.00 | $3,000.00 |
| 335 | Pedestrian detect push button (APS) (688-7001) | EACH | 18 | $1,150.00 | $1,100.00 |
| 336 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $4,500.00 | $4,000.00 |
| 337 | Strip mowing (730-7018) | CYC | 10 | $4,000.00 | $2,500.00 |
| 338 | Full - width mowing (730-7019) | CYC | 10 | $6,000.00 | $2,500.00 |
| 339 | Litter removal (734-7002) | CYC | 10 | $2,500.00 | $2,500.00 |
| 340 | Cleaning / sweeping (spot) (738-7104) | MI | 15 | $120.00 | $500.00 |
| 341 | Anti-graffiti coating (permnent-type II) (740-7005) | SF | 153,887 | $1.00 | $0.60 |
| 342 | ITS com CBL connector (6005-7005) | EACH | 15 | $35.00 | $80.00 |
| 343 | VIVDS prosr sys (6006-7001) | EACH | 2 | $12,000 | $16,000 |
| 344 | VIVDS cam assy var LNS (6006-7003) | EACH | 12 | $5,750.00 | $7,500.00 |
| 345 | VIVDS CNTRL software (6006-7005) | EACH | 2 | $4,400.00 | $900.00 |
| 346 | VIVDS cabling (6006-7007) | LF | 4,360 | $3.35 | $3.00 |
| 347 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $9,650.00 | $11,000 |
| 348 | ITS RVSD system (data collection only) (6010-7002) | EACH | 1 | $10,100 | $17,000 |
| 349 | ITS pole MNT cab (type 2)(conf 2) (6011-7002) | EACH | 3 | $8,000.00 | $8,000.00 |
| 350 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 3 | $31,000 | $30,000 |
| 351 | Temporary speed monitor (2 sys) (6016-7002) | DAY | 1,650 | $40.00 | $17.00 |
| 352 | CCTV field equipment (digital) (6018-7002) | EACH | 3 | $9,900.00 | $9,000.00 |
| 353 | ITS com CBL (ethernet) (6018-7004) | LF | 1,005 | $7.50 | $2.00 |
| 354 | CCTV mount (pole) (6018-7006) | EACH | 3 | $970.00 | $550.00 |
| 355 | CCTV field controller (6018-7011) | EACH | 3 | $3,490.00 | $400.00 |
| 356 | Ethernet switch (install only) (6023-7001) | EACH | 3 | $400.00 | $600.00 |
| 357 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 550 | $3.00 | $4.00 |
| 358 | WWD solar power system (6028-7004) | EACH | 3 | $1,900.00 | $75,000 |
| 359 | Cofw cellular router (inst only) (6049-7001) | EACH | 3 | $1,250.00 | $325.00 |
| 360 | Temporary Q-detect (type 2) (2 sys) (6069-7003) | DAY | 1,650 | $80.00 | $65.00 |
| 361 | Temporary construction equipment alert (2 sys) (6090-7003) | DAY | 1,650 | $60.00 | $30.00 |
| 362 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 658 | $100.00 | $110.00 |
| 363 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 5,907 | $145.00 | $120.00 |
| 364 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 2,109 | $155.00 | $159.00 |
| 365 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 2,573 | $200.00 | $200.00 |
| 366 | Thermoplastic pipe (PP) (42") (468-7005) | LF | 373 | $240.00 | $255.00 |
| 367 | Set (type II) (18 in) (TP) (6: 1) (P) (467-7312) | EACH | 8 | $1,200.00 | $2,000.00 |
| 368 | Set (type II) (24 in) (TP) (6: 1) (P) (467-7332) | EACH | 11 | $2,000.00 | $2,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.