Kiewit Infrastructure South Co.: TxDOT bid record
Kiewit Infrastructure South Co. submitted 71 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 06 NOV 2025, and was the low bidder on 8 of them (11%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $193,291,513
- Latest bid
- 06 NOV 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 18 | 2 | 11% |
| 2021 | 9 | 1 | 11% |
| 2022 | 7 | 2 | 29% |
| 2023 | 7 | 0 | 0% |
| 2024 | 18 | 1 | 6% |
| 2025 | 12 | 2 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Amarillo District | 20 | 4 | 20% |
| Odessa District | 12 | 2 | 17% |
| Childress District | 9 | 0 | 0% |
| Lubbock District | 8 | 0 | 0% |
| San Angelo District | 6 | 1 | 17% |
| Abilene District | 4 | 0 | 0% |
| El Paso District | 3 | 0 | 0% |
| Fort Worth District | 3 | 1 | 33% |
| Corpus Christi District | 1 | 0 | 0% |
| Laredo District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation (roadway) | 110-7001 | CY | 46 | 14 (30%) | $15.31 | $20.00 |
| Planing asphalt concrete pavement(0" to 2") | 354-7032 | SY | 29 | 12 (41%) | $3.31 | $4.40 |
| Rumble strips (shoulder) | 533-6001 | LF | 32 | 10 (31%) | $0.15 | $0.20 |
| Backfill (type A or B) | 134-7004 | STA | 13 | 9 (69%) | $116.39 | $250.00 |
| Crash cushion attenuator (remove) | 545-7004 | EACH | 28 | 8 (29%) | $1,325.97 | $1,000.00 |
| Planing asphalt concrete pavement (2") | 354-6045 | SY | 18 | 8 (44%) | $2.95 | $2.70 |
| Fog seal (CSS-1H) | 315-7004 | GAL | 17 | 8 (47%) | $3.52 | $5.00 |
| Backfill (type A) | 134-7001 | STA | 16 | 8 (50%) | $240.75 | $250.00 |
| Rumble strips (centerline) asphalt | 533-6004 | LF | 10 | 7 (70%) | $0.14 | $0.24 |
| Cement treat (subgrade) (8") | 275-7017 | SY | 9 | 7 (78%) | $2.00 | $4.50 |
| Barricades, signs and traffic handling | 502-7001 | MO | 70 | 6 (9%) | $35,000 | $5,000.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 47 | 6 (13%) | $120.92 | $110.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| RK Hall, LLC | 39 | 22 of 39 |
| Duininck, Inc. | 28 | 22 of 28 |
| J. Lee Milligan, Inc. | 27 | 16 of 27 |
| A. L. Helmcamp, Inc. | 25 | 22 of 25 |
| Gilvin-Terrill, LTD. | 18 | 8 of 18 |
| FNF Construction, Inc. | 16 | 8 of 16 |
| Jones Bros. Dirt & Paving Contractors, Inc. | 8 | 6 of 8 |
| Webber, LLC | 8 | 5 of 8 |
| Reece Albert, Inc. | 7 | 4 of 7 |
| James Hamilton Construction Co. | 7 | 7 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 NOV 2025 | A00203773 | Childress District | Highway Improvement, US 287 (Hall C/L, East to 2100' West of FM 164) | 8 of 8 | $7,548,471 | +46% |
| 09 OCT 2025 | A00132096 | Lubbock District | Widen Road - Add Lanes, SH 137 (US 62 to Dawson County Line) | 5 of 5 | $28,823,132 | +29% |
| 05 SEP 2025 | A00127834 | Amarillo District | Highway Improvement, SH 207 (SH 15 IN SPEARMAN to HUTCHINSON COUNTY LINE) | 4 of 5 | $15,475,567 | +24% |
| 04 SEP 2025 | A00127796 | Amarillo District | Construct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE) | 6 of 6 | $182,077,390 | +83% |
| 02 JUL 2025 | A00215570 | Fort Worth District | HOT MIX, IH0020 (VARIOUS LOCATIONS WITHIN to Parker County) | 1 of 6 | $598,000 | Low, 7.0% under the second |
| 04 JUN 2025 | A00132273 | El Paso District | Widen Road - Add Lanes And Shoulders, FM 2185 (750 feet south of Looney Spur Road to Junction with FM 3541) | 4 of 4 | $149,255,443 | +21% |
| 01 MAY 2025 | A00127651 | Lubbock District | Surfacing/Roadway Restoration, US 70 (FARWELL EAST CITY LIMITS to BAILEY COUNTY LINE) | 7 of 8 | $37,257,716 | +26% |
| 05 MAR 2025 | A00128677 | Childress District | Highway Improvement, SH 152 (Gray C/L, East to FM 2473) | 6 of 6 | $18,125,883 | +28% |
| 04 MAR 2025 | A00120208 | Lubbock District | Rehabilitate Existing Roadway, US 84 (FM 2458 to CR 386) | 5 of 5 | $18,368,117 | +38% |
| 04 MAR 2025 | A00130847 | Amarillo District | Bridge Replacement, SH 23 (At Gilaloo Creek to .) | 4 of 5 | $23,149,076 | +24% |
| 06 FEB 2025 | A00121423 | San Angelo District | Preventive Maintenance, IH 10 (Pecos County line to 15.9 miles E of Pecos County line) | 1 of 6 | $24,564,337 | Low, 5.0% under the second |
| 08 JAN 2025 | A00123308 | Lubbock District | Widen Road - Add Lanes, SH 214 (MORTON SOUTH CITY LIMITS to YOAKUM COUNTY LINE) | 5 of 5 | $34,825,666 | +21% |
| 04 DEC 2024 | A00124675 | Lubbock District | Surfacing/Roadway Restoration, US 84 (EAST LITTLEFIELD CITY LIMITS to HOCKLEY COUNTY LINE) | 5 of 6 | $31,163,966 | +20% |
| 06 NOV 2024 | A00195667 | Amarillo District | Preventive Maintenance, US 287 (CARSON CO LINE to 8.6 MILES EAST) | 4 of 5 | $20,958,037 | +5.0% |
| 02 AUG 2024 | 08243203 | San Angelo District | US 67 Preventive maintenance from TOM GREEN COUNTY LINE to 10.2 MI SOUTH OF TOM GREEN CO LINE | 2 of 5 | $52,793,315 | +1.0% |
| 10 JUL 2024 | 07243203 | Pharr District | FM 755 Reconstruct existing roadway from FM 1017 to FM 2294 | 4 of 4 | $41,902,672 | +70% |
| 09 JUL 2024 | 07243005 | Abilene District | US 83 Widen road - add shoulders from .67 MILES NORTH OF FM 3034 to .28 MILES SOUTH OF FM 3034 | 3 of 3 | $46,292,239 | +17% |
| 06 JUN 2024 | 06243204 | Abilene District | IH 20 Construct rest area from FROM 0.7 MILES EAST OF CR 226 to 1.9 MILES EAST OF CR 226 | 2 of 2 | $79,817,932 | +7.0% |
| 06 JUN 2024 | 06243206 | Childress District | US 287 Bridge replacement from @ BNSF RR & LP 285 | 2 of 4 | $32,210,206 | +11% |
| 06 JUN 2024 | 06243207 | Odessa District | FM 846 Highway improvement from SH 137 to HOWARD COUNTY LINE | 4 of 4 | $37,415,775 | +39% |
| 05 JUN 2024 | 06243008 | Wichita Falls District | SH 25 Widen road - add shoulders from FM 1811 to ARCHER COUNTY LINE | 3 of 4 | $27,699,121 | +35% |
| 05 JUN 2024 | 06243012 | Amarillo District | IH 40 Highway improvement from IH 40 to DEAF SMITH COUNTY LINE | 1 of 4 | $15,078,258 | Low, 6.0% under the second |
| 02 MAY 2024 | 05243009 | Amarillo District | SH 152 Highway improvement from CARSON CO LINE to SH 70 | 3 of 3 | $18,105,003 | +4.0% |
| 02 MAY 2024 | 05243011 | Yoakum District | SH 35 Bridge replacement from COLORADO RIVER to STR# 179-04-059 & 179-04-069 | 2 of 2 | $35,337,094 | +6.0% |
| 04 APR 2024 | 04243004 | Amarillo District | US 60 Preventive maintenance from OCHILTREE CO LINE to CANADIAN RIVER | 3 of 4 | $21,600,858 | +11% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.