James Hamilton Construction Co.: TxDOT bid record

James Hamilton Construction Co. submitted 17 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 06 AUG 2026, and was the low bidder on 7 of them (41%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
Texas DOT
Low bid volume
$107,311,273
Latest bid
06 AUG 2026
Data through
19 NOV 2026
17Bids
7Low bids
41Win rate, percent
+8.0%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
2020300%
2022100%
202322100%
20243267%
20257343%
2026100%
James Hamilton Construction Co., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Lubbock District11545%
El Paso District2150%
Odessa District200%
Loving100%
Yoakum11100%
James Hamilton Construction Co., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction exits (remove)506-7024SY129 (75%)$6.25$10.00
Biodegradable erosion control logs (install) (18")506-7045LF128 (67%)$7.50$7.90
Barricades, signs and traffic handling502-7001MO166 (38%)$32,000$5,000.00
Construction exits (install) (type 1)506-7020SY106 (60%)$27.50$30.00
Full - width mowing730-7019CYC106 (60%)$4,600.00$4,000.00
Litter removal734-7002CYC106 (60%)$2,707.50$2,183.19
Prime coat (MC-30)310-7004GAL96 (67%)$5.00$6.42
Flexible pavement structure repair(6")351-7005SY86 (75%)$60.00$60.00
Excavation (roadway)110-7001CY105 (50%)$15.00$20.00
Flexible pavement structure repair(3")351-7002SY75 (71%)$33.00$46.00
Portable changeable message sign503-7001DAY124 (33%)$50.00$100.00
Emuls asphalt (erosion control)(CSS-1H)314-7011GAL104 (40%)$3.75$4.32
James Hamilton Construction Co., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

James Hamilton Construction Co., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00120927Lubbock DistrictSurfacing/Roadway Restoration, US 60 (5TH STREET IN FRIONA to WALNUT AVE IN FRIONA)5 of 5$12,539,274+28%
09 OCT 2025A00132096Lubbock DistrictWiden Road - Add Lanes, SH 137 (US 62 to Dawson County Line)3 of 5$23,457,089+5.0%
08 OCT 2025A00126079Lubbock DistrictHazard Elimination & Safety, US 62 (CR 319 to WEST SEMINOLE CITY LIMITS)1 of 3$8,218,152Low, 4.0% under the second
05 SEP 2025A00128981Lubbock DistrictSurfacing/Roadway Restoration, SH 349 (FM 2052 to Martin County Line)6 of 9$21,430,036+25%
07 AUG 2025A00207057Lubbock DistrictHazard Elimination & Safety, SH 83 (Intersection of to FM2056)1 of 2$698,729Low, 11% under the second
01 MAY 2025A00127651Lubbock DistrictSurfacing/Roadway Restoration, US 70 (FARWELL EAST CITY LIMITS to BAILEY COUNTY LINE)3 of 8$30,719,988+4.0%
04 MAR 2025A00120208Lubbock DistrictRehabilitate Existing Roadway, US 84 (FM 2458 to CR 386)4 of 5$17,314,509+30%
08 JAN 2025A00123308Lubbock DistrictWiden Road - Add Lanes, SH 214 (MORTON SOUTH CITY LIMITS to YOAKUM COUNTY LINE)1 of 5$28,894,124Low, 13% under the second
02 MAY 202405243006El Paso DistrictRM 652 Surfacing/roadway restoration from FM 1108 INTERSECTION to 0.17 MI E OF FM 11081 of 3$29,265,512Low, 1.0% under the second
04 APR 202404243041Lubbock DistrictUS 87 Widen road - add lanes and shoulders from 0.5 MILES NORTH OF US 349 to 0.5 MILES SOUTH OF US 3492 of 4$14,978,220+1.0%
05 JAN 202401243220YoakumUS 380 Rehabilitate existing roadway from WEST PLAINS CITY LIMITS to US 821 of 1$6,041,330Low
06 DEC 202312233226Lubbock DistrictUS 62 Rehabilitate existing roadway from WELLMAN to FM 303 N1 of 4$11,408,519Low, 26% under the second
07 SEP 202309233205Lubbock DistrictUS 62 Surfacing/roadway restoration from FM 213 IN WELLMAN to BEG OF 4 LN DIVIDED S OF BROWNFIELD1 of 3$22,784,907Low, 12% under the second
02 DEC 202212223202LovingSH 302 Roadway widening to a super 2 from EAST OF PURPLE CATTLE GUARD RD to WINKLER COUNTY LINE3 of 3$32,663,783+4.0%
05 JUN 202006203239Odessa DistrictUS 285 Roadway rehabilitation from RM 652 to CR 2322 of 11$5,276,700+2.0%
08 APR 202004203003Odessa DistrictRM 652 Roadway rehabilitation from CULBERSON COUNTY LINE to US 2852 of 7$22,243,058+10%
09 JAN 202001203009El Paso DistrictRM 652 Full depth rehabilitation from 4.507 MI W OF RM 1165 to RM 1165 INTERSECTION3 of 4$21,306,151+24%
James Hamilton Construction Co.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy