TxDOT letting results, January 8, 2025
49 contracts let by Texas DOT on January 8, 2025, $405,015,910 in low bids, a median of 5 bidders per contract. On the 49 with an engineer's estimate, the low bid came in under it 41 times; median low bid -17% against the estimate.
- Owner
- Texas DOT
- Contracts
- 49
- Low bids, total
- $405,015,910
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00064403 | Interchange Improvement, IH 35E (AT CORPORATE DRIVE to .) | Dallas District | 4 | Sema Construction, Inc. | $217,964,539 | $221,370,118 | +2.0% | +8.0% | TxDOT |
| A00123308 | Widen Road - Add Lanes, SH 214 (MORTON SOUTH CITY LIMITS to YOAKUM COUNTY LINE) | Lubbock District | 5 | James Hamilton Construction Co. | $28,894,124 | $32,788,634 | +13% | -24% | TxDOT |
| A00210409 | Widen Road - Add Lanes And Shoulders, US 67 (REAGAN COUNTY LINE to EAST OF CR 225) | Odessa District | 2 of 4 | Jones Bros. Dirt & Paving Contractors, Inc. | $13,723,466 | $13,893,001 | +1.0% | -33% | TxDOT |
| A00210890 | MOWING HIGHWAY RIGHT OF WAY, IH0610 (Various Hwys in Houston Metro Area to Various Hwys in Houston Metro Area) | Houston District | 4 | Central North Construction, LLC | $12,667,795 | $14,351,648 | +13% | +4.0% | TxDOT |
| A00184816 | Highway Improvement, FM 2164 (Milam Rd to North of SL 288) | Dallas District | 5 | Eurovia Atlantic Coast LLC | $9,988,206 | $10,042,875 | +1.0% | -5.0% | TxDOT |
| A00186881 | Hazard Elimination & Safety, SH 6 (Brazoria County Line to IH 45) | Houston District | 5 | Sice, Inc. | $9,176,025 | $9,229,692 | +1.0% | -6.0% | TxDOT |
| A00178547 | Preventive Maintenance, SH 29 (US 183 to Jack Nicklaus) | Austin District | 3 | Lone Star Paving Company | $9,163,865 | $10,506,603 | +15% | -11% | TxDOT |
| A00196216 | Resurface Roadway, SH 31 (Henderson CL to FM 206) | Tyler District | 3 | East Texas Bridge, Inc. | $7,385,033 | $7,450,760 | +1.0% | -21% | TxDOT |
| A00063792 | Bridge Replacement, SS 303 (SPUR 303/RUSH CREEK RELIEF to .) | Fort Worth District | 7 | Ibctx, LLC | $7,221,685 | $7,574,410 | +5.0% | -11% | TxDOT |
| A00197927 | Widen Road - Add Shoulders, SH 101 (0.4 mi south of US 81 to FM 1749) | Wichita Falls District | 4 | Eurovia Atlantic Coast LLC | $6,806,246 | $7,318,983 | +8.0% | -14% | TxDOT |
| A00187419 | Rehabilitate Existing Roadway, FM 36 (US 380 to SH 66) | Paris District | 3 | CDM Holdings | $6,730,504 | $7,124,327 | +6.0% | -13% | TxDOT |
| A00124561 | Surfacing/Roadway Restoration, BU 59S (US 59 EL CAMPO to 1.19 Mi SOUTHWEST of US 59) | Yoakum District | 5 | Cornerstone Paving and Construction, L.L.C. | $6,366,588 | $6,507,459 | +2.0% | -13% | TxDOT |
| A00212994 | BUNDLED BID, IH0035 (VARIOUS LOCATIONS IN to COMAL COUNTY) | San Antonio District | 2 | Garret Shields Infrastructure | $6,284,857 | $6,835,613 | +9.0% | -27% | TxDOT |
| A00207320 | Highway Improvement, US 287 (South of FM 281 to Dumas) | Amarillo District | 4 | HJC Farms, Inc. | $5,565,020 | $6,104,867 | +10% | -7.0% | TxDOT |
| A00212242 | Total Maintenance, IH0045 (Southern Street to SH 87) | Houston District | 2 | Isi Contracting, Inc. | $4,290,486 | $4,410,005 | +3.0% | -9.0% | TxDOT |
| A00188231 | Preventive Maintenance, US 290 (0.094 mi E of SH 95 to 0.132 mi W of FM 696) | Austin District | 6 | Texas Materials Group, Inc. | $4,270,055 | $4,415,263 | +3.0% | -22% | TxDOT |
| A00196248 | Rehabilitate Existing Roadway, SS 73 (US 67 to BS 287Q) | Dallas District | 5 | Texas Materials Group, Inc. | $3,784,310 | $4,350,497 | +15% | -13% | TxDOT |
| A00186805 | Hazard Elimination & Safety, FM 517 (FM 646 to Owens Drive) | Houston District | 7 | Highway Intelligent Traffic Solutions, Inc. | $3,005,355 | $3,486,385 | +16% | +20% | TxDOT |
| A00181043 | Bridge Replacement, 1 MILE RD W (Mile 1 West Rd., NBI #: 211090AA0824001 to @ Main Supply Channel) | Pharr District | 4 | Texas Cordia Construction, LLC | $2,537,955 | $2,694,661 | +6.0% | -27% | TxDOT |
| A00178155 | Bridge Maintenance, Various (Districtwide to .) | Odessa District | 8 | Pathfield Investments LLC | $2,477,220 | $2,517,929 | +2.0% | -19% | TxDOT |
| A00207978 | Surfacing/Roadway Restoration, US 59 (0.5 Mi S of FM 2148 to Sulphur River) | Atlanta District | 4 | O. Trevino Construction, LLC | $2,402,680 | $2,438,635 | +1.0% | -20% | TxDOT |
| A00187241 | Construct Pedestrian Infrastructure, Various (On NETT from East City Limits of Annona to Bowie County Line) | Paris District | 6 | CDM Holdings | $2,074,733 | $2,085,348 | +1.0% | -14% | TxDOT |
| A00125824 | Bridge Replacement, COUNTY ROAD 331 (On CR 331 Over west Fork Branch to 0.5 miles north of CR 262) | San Angelo District | 8 | J. H. Strain & Sons, Inc. | $1,997,089 | $2,262,627 | +13% | -25% | TxDOT |
| A00190132 | Bridge Replacement, COUNTY ROAD 139 (CR 139 @ BIG SANDY CREEK to EXISTING (STR#201220AA0291002)) | Beaumont District | 8 | Isi Contracting, Inc. | $1,980,225 | $2,021,862 | +2.0% | +6.0% | TxDOT |
| A00210076 | ASPHALT, US0281 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 2 | Wright Asphalt Products Company LLC | $1,825,710 | $1,855,460 | +2.0% | -17% | TxDOT |
| A00139041 | Bridge Replacement, SISTER GROVE RD (Sister Grove Road to At West Prong Sister Grove Creek) | Paris District | 6 | THK Construction LLC | $1,816,247 | $1,972,279 | +9.0% | +5.0% | TxDOT |
| A00212233 | HOT MIX, SH0006 (VARIOUS ROADWAYS to ACROSS BOSQUE AND HAMILTON COUNTIES.) | Waco District | 3 | Big Creek Construction, LTD. | $1,801,950 | $1,855,125 | +3.0% | +2.0% | TxDOT |
| A00196613 | Hazard Elimination & Safety, Various (DISTRICT WIDE to .) | Beaumont District | 5 | TRP Infrastructure Services, LLC | $1,798,959 | $1,886,148 | +5.0% | -41% | TxDOT |
| A00124048 | Hazard Elimination & Safety, Various (2025 District Wide Striping to .) | Childress District | 6 | Texas Panhandle Construction, Inc. | $1,788,475 | $2,236,434 | +25% | -23% | TxDOT |
| A00131097 | Advanced Traffic Management System, FM 521 (SH 6 to Harris C/L) | Houston District | 7 | Florida Traffic Control Devices, Inc. | $1,585,585 | $1,721,016 | +9.0% | +35% | TxDOT |
| A00212503 | TRAFFIC SIGNAL MAINTENANCE, US0059 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | Atlanta District | 3 | Texas Traffic Control Systems, Inc. | $1,391,848 | $1,777,689 | +28% | -5.0% | TxDOT |
| A00178805 | Resurface Roadway, SH 29 (Autumn Avenue to Wells Avenue) | Austin District | 6 | Texas Materials Group, Inc. | $1,386,823 | $1,567,173 | +13% | -29% | TxDOT |
| A00212234 | HOT MIX, US0190 (VARIOUS LOCATIONS to ACROSS BELL AND CORYELL COUNTIES.) | Waco District | 4 | Texas Materials Group, Inc. | $1,283,290 | $1,316,813 | +3.0% | -5.0% | TxDOT |
| A00187856 | Bridge Replacement, E TYLER ST (E. Tyler St. to at Mill Creek) | Tyler District | 8 | East Texas Bridge, Inc. | $1,162,543 | $1,190,685 | +2.0% | -29% | TxDOT |
| A00212544 | MOWING HIGHWAY RIGHT OF WAY, IH0045 (State Highways in Montgomery County to State Highways in Montgomery County) | Houston District | 4 | Wayne Yancey, Inc. | $1,094,425 | $1,340,093 | +22% | -33% | TxDOT |
| A00130684 | Surfacing/Roadway Restoration, FM 526 (North of US 90 to BU 90) | Houston District | 6 | Durwood Greene Construction Co. | $1,067,872 | $1,169,016 | +9.0% | -43% | TxDOT |
| A00141141 | Preventive Maintenance, US 183 (AVENUE E IN LAMPASAS to NINTH STREET) | Brownwood District | 6 | Lone Star Paving Company | $1,066,350 | $1,255,467 | +18% | -17% | TxDOT |
| A00209696 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0030 (ON IH 30 IN to EAST DALLAS COUNTY MAINTENANCES) | Dallas District | 4 | Peachtree Construction, LTD. | $1,020,538 | $1,231,171 | +21% | -27% | TxDOT |
| A00178602 | Widen Road - Add Shoulders, FM 1977 (FM 621 to Guadalupe/Caldwell County Line) | San Antonio District | 5 | Hunter Industries, LTD. | $1,001,033 | $1,292,451 | +29% | -48% | TxDOT |
| A00207923 | Resurface Roadway, Various (Various Locations Districtwide to .) | Lufkin District | 3 | Isi Contracting, Inc. | $938,603 | $947,027 | +1.0% | +20% | TxDOT |
| A00210586 | FULL DEPTH CONCRETE REPAIR, FM0407 (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | Dallas District | 6 | Procure Services, LLC | $924,427 | $927,373 | 0.0% | -13% | TxDOT |
| A00193200 | Hazard Elimination & Safety, SH 87 (AT TIMPSON ST to .) | Lufkin District | 4 | Third Coast Services LLC | $909,248 | $1,113,551 | +22% | -4.0% | TxDOT |
| A00213022 | MILL AND INLAY, FM2154 (FM 2818 to Rock Prairie Road) | Bryan District | 5 | Cornerstone Paving and Construction, L.L.C. | $898,734 | $1,058,062 | +18% | -21% | TxDOT |
| A00184668 | Hazard Elimination & Safety, FM 24 (1.5 MI N OF SH 44 to 1.75 MI N OF SH 44) | Corpus Christi District | 7 | Salinas Construction Technologies, LTD. | $846,576 | $895,502 | +6.0% | -4.0% | TxDOT |
| A00196607 | Install/Replace Signs, Various (DISTRICT WIDE to .) | Beaumont District | 10 | Hazmat International, Inc. | $797,582 | $849,005 | +6.0% | -23% | TxDOT |
| A00176429 | Bridge Maintenance, Various (DISTRICT WIDE to .) | Amarillo District | 4 | Scout 5 Construction LLC | $652,372 | $900,000 | +38% | -43% | TxDOT |
| A00211485 | MOWING HIGHWAY RIGHT OF WAY, SH0031 (Navarro to Navarro County Maintenance Section) | Dallas District | 7 | Serna Contractors, LLC | $631,956 | $813,452 | +29% | -38% | TxDOT |
| A00188228 | Preventive Maintenance, Various (Travis & Hays Counties to .) | Austin District | 7 | Stripe Lines, Inc. | $425,581 | $427,713 | +1.0% | -36% | TxDOT |
| A00138757 | Bridge Replacement, EVANS RD (Evans Rd At Drain to .) | San Antonio District | 4 | A-1 DOT Solutions LLC | $141,123 | $159,805 | +13% | -21% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.