Ibctx, LLC: TxDOT bid record
Ibctx, LLC submitted 72 bids on Texas DOT contracts in the data, from 10 MAR 2020 to 12 NOV 2026, and was the low bidder on 13 of them (18%). When it was not low, its total sat a median +35% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $36,625,738
- Latest bid
- 12 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 3 | 33% |
| 2021 | 14 | 2 | 14% |
| 2022 | 9 | 3 | 33% |
| 2023 | 5 | 1 | 20% |
| 2024 | 4 | 1 | 25% |
| 2025 | 17 | 2 | 12% |
| 2026 | 14 | 1 | 7% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 41 | 7 | 17% |
| Fort Worth District | 17 | 5 | 29% |
| Wichita Falls District | 6 | 0 | 0% |
| Paris District | 3 | 1 | 33% |
| Bryan District | 2 | 0 | 0% |
| Amarillo District | 2 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 55 | 38 (69%) | $100.00 | $230.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 60 | 10 (17%) | $5,750.00 | $5,000.00 |
| Preparing row | 100-7002 | STA | 28 | 8 (29%) | $5,000.00 | $2,750.00 |
| Portable changeable message sign | 503-7001 | DAY | 19 | 6 (32%) | $100.00 | $100.00 |
| Removing concrete (riprap) | 104-7006 | SY | 14 | 6 (43%) | $30.00 | $25.00 |
| Temporary special shoring | 403-7001 | SF | 14 | 5 (36%) | $51.00 | $35.73 |
| TMA (mobile operation) | 505-7003 | DAY | 11 | 5 (45%) | $250.00 | $291.17 |
| Mobilization (callout) | 500-7002 | EACH | 11 | 5 (45%) | $800.00 | $688.00 |
| Constructing detours | 508-7001 | SY | 14 | 3 (21%) | $116.00 | $87.00 |
| Flowable backfill | 401-7001 | CY | 13 | 3 (23%) | $500.00 | $350.00 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 11 | 3 (27%) | $33.00 | $33.00 |
| Portable concrete traffic barrier (aligning) | 512-7108 | LF | 10 | 3 (30%) | $19.00 | $16.10 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ed Bell Construction Company | 23 | 11 of 23 |
| Ragle Construction, Inc. | 21 | 8 of 21 |
| Hodges and Son Construction Company, Inc. | 19 | 10 of 19 |
| Garret Shields Infrastructure | 17 | 13 of 17 |
| Gibson & Associates, Inc. | 16 | 9 of 16 |
| Built Right Construction of Oklahoma, LLC | 13 | 3 of 13 |
| FNH Construction, LLC | 10 | 1 of 10 |
| Altus Construction LLC | 10 | 4 of 10 |
| Structural Integrity Group LLC | 10 | 4 of 10 |
| Shalom Services Corporation | 8 | 8 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | A00223438 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, IH0045 (Various Roadways in the to Navarro County Maintenance Section) | 4 of 6 | $448,900 | +78% |
| 14 OCT 2026 | A00215965 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, FM1385 (At Little Elm Creek Bridge to and Little Elm Creek Relief) | 5 of 6 | $135,565 | +63% |
| 14 OCT 2026 | A00222230 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, IH0035E (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | 2 of 3 | $199,750 | +20% |
| 12 AUG 2026 | A00219680 | Dallas District | MISCELLANEOUS CONCRETE REPAIR, IH0035W (VARIOUS ROADWAYS IN THE to DENTON COUNTY MAINTENANCE SECTION) | 7 of 8 | $302,000 | +79% |
| 06 AUG 2026 | A00193283 | Fort Worth District | Rehabilitate Bridge, SS 347 (SH 121 WB to @ IH 35W SB) | 2 of 2 | $4,002,559 | +40% |
| 05 AUG 2026 | A00132718 | Fort Worth District | Bridge Replacement, IH 35W (North of Woodbine Dr to South of CR 530B) | 2 of 8 | $2,932,360 | +5.0% |
| 03 JUN 2026 | A00185405 | Dallas District | Bridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .) | 4 of 5 | $2,876,413 | +23% |
| 02 JUN 2026 | A00219663 | Fort Worth District | Install Noise Barrier, SH 360 (Ave J to N of Ave J) | 1 of 7 | $1,177,759 | Low, 4.0% under the second |
| 16 APR 2026 | A00214351 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Paris District) | 4 of 7 | $576,523 | +38% |
| 07 APR 2026 | A00211984 | Dallas District | Bridge Maintenance, IH 30 (At Hunnicut Road to In Dallas County) | 7 of 12 | $480,540 | +51% |
| 11 MAR 2026 | A00218809 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Various Roadways in the to Ellis County Maintenance Section) | 10 of 12 | $614,875 | +66% |
| 04 MAR 2026 | A00188550 | Amarillo District | Rehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .) | 2 of 6 | $6,120,788 | +35% |
| 05 FEB 2026 | A00194041 | Dallas District | Bridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .) | 15 of 15 | $2,206,176 | +80% |
| 06 JAN 2026 | A00193318 | Fort Worth District | Transportation Non-Roadway, IH 35W (Luella Bridge to 0.2 mi S of Altamesa Bridge) | 5 of 9 | $4,993,594 | +29% |
| 10 DEC 2025 | A00217115 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, IH0045 (Navarro to Maintenance Section) | 7 of 9 | $298,850 | +140% |
| 10 DEC 2025 | A00217375 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION) | 3 of 7 | $210,680 | +135% |
| 02 DEC 2025 | A00185406 | Dallas District | Bridge Replacement, W PARKER (At Pittman Creek to .) | 6 of 8 | $2,641,480 | +46% |
| 12 NOV 2025 | A00217331 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, IH0035E (Various Roadways in the to Ellis County Maintenance Section) | 3 of 7 | $562,300 | +38% |
| 15 OCT 2025 | A00217553 | Dallas District | BRIDGE SCOUR REPAIR, SH0114 (ON SH 114 IN THE to WEST DALLAS COUNTY MAINTENANCE SECTIONS) | 4 of 5 | $610,479 | +39% |
| 08 OCT 2025 | A00216261 | Dallas District | BRIDGE SCOUR REPAIR, US 175 (US 175 to At Prairie Creek) | 6 of 15 | $1,474,425 | +48% |
| 18 SEP 2025 | A00213015 | Fort Worth District | BRIDGE BEAM REPAIR, SH0199 (SH 199 to At FM 730) | 5 of 5 | $444,738 | +213% |
| 04 SEP 2025 | A00043203 | Dallas District | Bridge Replacement, N TRINITY RD (TRINITY ROAD AT COOPER CREEK to IN CITY OF DENTON) | 5 of 8 | $1,783,810 | +9.0% |
| 13 AUG 2025 | A00214674 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, FM1393 (Navarro County to Maintenance Section) | 5 of 9 | $471,400 | +40% |
| 13 AUG 2025 | A00214926 | Dallas District | MISCELLANEOUS CONCRETE REPAIR, US0080 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | 2 of 5 | $330,600 | +4.0% |
| 01 JUL 2025 | A00064769 | Dallas District | Bridge Replacement, S OLD ALMA RD (OLD ALMA ROAD AT DRAW to .) | 9 of 13 | $3,530,862 | +13% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.