TxDOT contract A00132718 bid tabulation
Bridge Replacement, IH 35W (North of Woodbine Dr to South of CR 530B). Let by Texas DOT on August 5, 2026, Johnson, Fort Worth District. 8 bids received; low bid $2,800,124 by Foutsco Paving Company, LLC, -30% against the engineer's estimate of $3,991,946.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 52
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Foutsco Paving Company, LLC | $2,800,124 | Low | -30% |
| 2 | Ibctx, LLC | $2,932,360 | +5.0% | -27% |
| 3 | Ragle Construction, Inc. | $3,095,898 | +11% | -22% |
| 4 | Ed Bell Construction Company | $3,289,291 | +17% | -18% |
| 5 | Scott Tucker Construction Company, LLC | $3,360,054 | +20% | -16% |
| 6 | Bear Creek Contracting, LLC | $3,452,923 | +23% | -14% |
| 7 | Icos Management, LLC | $3,468,526 | +24% | -13% |
| 8 | STX Civil | $3,687,213 | +32% | -8.0% |
Engineer's estimate: $3,991,946.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Foutsco Paving Company, LLC | 2. Ibctx, LLC | 3. Ragle Construction, Inc. | 4. Ed Bell Construction Company | 5. Scott Tucker Construction Company, LLC | 6. Bear Creek Contracting, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 7 | $25,000 | $6,850.00 | $6,000.00 | $36,000 | $21,000 | $2,399.00 | $3,109.00 |
| 2 | Removing concrete (flume) (104-7041) | SY | 107 | $80.00 | $18.00 | $50.00 | $14.80 | $27.50 | $48.00 | $16.00 |
| 3 | Remove (10"-14") TRT/untrt base & asphalt pavement (105-7069) | CY | 1,422 | $12.00 | $13.00 | $20.00 | $2.00 | $5.25 | $25.00 | $39.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 400 | $105.00 | $9.00 | $25.00 | $88.00 | $38.00 | $38.00 | $18.00 |
| 5 | Excavation (channel) (110-7002) | CY | 1,205 | $137.00 | $20.00 | $20.00 | $20.60 | $34.00 | $31.00 | $8.00 |
| 6 | Embankment (final)(OC)(type B) (132-7003) | CY | 250 | $128.00 | $133.00 | $30.00 | $44.00 | $14.00 | $107.00 | $29.00 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 9,680 | $15.00 | $2.50 | $6.00 | $2.40 | $2.00 | $3.10 | $16.00 |
| 8 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 9,680 | $1.00 | $0.11 | $1.50 | $0.28 | $0.45 | $0.60 | $3.00 |
| 9 | Vegetative watering (168-7001) | TGL | 339 | $300.00 | $0.10 | $1.00 | $47.00 | $55.00 | $63.00 | $28.00 |
| 10 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 285 | $5.00 | $0.10 | $10.00 | $18.60 | $10.00 | $17.00 | $7.00 |
| 11 | D-GR HMA type-B PG64-22 (341-7001) | TON | 774 | $170.00 | $175.00 | $168.00 | $168.20 | $175.00 | $116.00 | $215.00 |
| 12 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 148 | $180.00 | $300.00 | $230.00 | $206.00 | $250.00 | $261.00 | $272.00 |
| 13 | Tack coat (344-7077) | GAL | 570 | $5.00 | $0.10 | $6.00 | $14.00 | $6.00 | $5.00 | $7.00 |
| 14 | Temporary special shoring (403-7001) | SF | 900 | $35.00 | $17.00 | $1.00 | $15.00 | $10.00 | $5.00 | $23.00 |
| 15 | Riprap (mow strip)(4 in) (432-7013) | CY | 67 | $900.00 | $650.00 | $1,000.00 | $642.00 | $750.00 | $782.00 | $617.00 |
| 16 | Riprap (stone protection)(24 in) (432-7045) | CY | 1,266 | $150.00 | $135.00 | $165.00 | $155.00 | $175.00 | $148.00 | $217.00 |
| 17 | Concrete box culvert (9 FT X 5 FT) (462-7027) | LF | 854 | $1,200.00 | $791.00 | $858.00 | $715.00 | $1,070.00 | $1,029.00 | $912.00 |
| 18 | Wingwall (FW - S) (HW=8 FT) (466-7164) | EACH | 2 | $30,000 | $58,000 | $25,000 | $26,000 | $52,500 | $28,723 | $17,750 |
| 19 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 1 | $35,000 | $60,000 | $28,000 | $29,200 | $73,500 | $44,769 | $20,212 |
| 20 | Wingwall (PW - 1) (HW=8 FT) (466-7178) | EACH | 1 | $35,000 | $62,000 | $30,000 | $39,000 | $84,000 | $47,041 | $27,949 |
| 21 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $60,000 | $50,000 | $30,000 | $90,000 | $15,750 | $21,931 | $4,225.00 |
| 22 | Mobilization (500-7001) | LS | 1 | $368,934 | $70,000 | $293,000 | $270,000 | $330,000 | $336,000 | $260,914 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $20,000 | $45,000 | $7,000.00 | $26,000 | $21,000 | $15,449 | $3,373.00 |
| 24 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $6,000.00 | $20,000 | $10,000 | $9,450.00 | $7,938.00 | $2,447.00 |
| 25 | TMA (stationary) (505-7001) | DAY | 128 | $450.00 | $0.10 | $130.00 | $287.00 | $75.00 | $380.00 | $196.00 |
| 26 | Rock filter dams (install) (type 1) (506-7001) | LF | 150 | $100.00 | $0.10 | $34.00 | $28.50 | $50.00 | $33.00 | $35.00 |
| 27 | Rock filter dams (remove) (506-7011) | LF | 150 | $20.00 | $0.10 | $17.00 | $11.00 | $25.00 | $18.00 | $8.00 |
| 28 | Temporary sediment control fence (install) (506-7039) | LF | 2,000 | $5.20 | $0.10 | $6.00 | $3.60 | $3.00 | $4.00 | $5.00 |
| 29 | Temporary sediment control fence (remove) (506-7041) | LF | 2,000 | $2.00 | $0.10 | $3.00 | $1.10 | $1.35 | $1.00 | $3.00 |
| 30 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 500 | $12.00 | $0.10 | $8.00 | $5.75 | $6.40 | $6.00 | $11.00 |
| 31 | Biodegradable erosion control logs (remove) (506-7046) | LF | 500 | $4.00 | $0.10 | $4.00 | $1.25 | $2.10 | $2.00 | $4.00 |
| 32 | Constructing detours (508-7001) | SY | 5,603 | $95.00 | $86.00 | $103.00 | $112.50 | $106.00 | $136.00 | $187.00 |
| 33 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 1,740 | $87.00 | $50.00 | $50.00 | $17.90 | $15.00 | $101.00 | $74.00 |
| 34 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 1,500 | $20.00 | $18.00 | $18.00 | $8.80 | $7.50 | $36.00 | $15.00 |
| 35 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 1,740 | $25.00 | $25.00 | $25.00 | $7.80 | $12.00 | $24.00 | $10.00 |
| 36 | Metal W-beam guard fence (steel post) (540-7002) | LF | 563 | $80.00 | $30.00 | $34.00 | $30.00 | $32.00 | $31.00 | $37.00 |
| 37 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,100.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,300.00 | $1,405.00 | $1,489.00 |
| 38 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 350 | $125.00 | $85.00 | $110.00 | $85.00 | $91.00 | $100.00 | $105.00 |
| 39 | Remove metal beam guard fence (542-7001) | LF | 425 | $10.00 | $3.00 | $4.00 | $3.00 | $3.50 | $3.00 | $4.00 |
| 40 | Remove downstream anchor terminal (542-7003) | EACH | 2 | $500.00 | $200.00 | $300.00 | $200.00 | $215.00 | $359.00 | $248.00 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,200.00 | $3,600.00 | $3,200.00 | $3,500.00 | $3,205.00 | $3,971.00 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $500.00 | $250.00 | $300.00 | $250.00 | $275.00 | $359.00 | $310.00 |
| 43 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 10,500 | $1.00 | $0.80 | $1.00 | $0.90 | $1.00 | $0.90 | $1.00 |
| 44 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 10,500 | $1.00 | $0.80 | $1.00 | $0.90 | $1.00 | $0.90 | $1.00 |
| 45 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 2,618 | $0.50 | $0.35 | $0.50 | $0.40 | $0.50 | $0.40 | $0.50 |
| 46 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 10,428 | $0.50 | $0.34 | $0.50 | $0.35 | $0.50 | $0.35 | $0.50 |
| 47 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 10,484 | $0.50 | $0.34 | $0.50 | $0.35 | $0.50 | $0.35 | $0.50 |
| 48 | Reflectorized pavement marker type I-C (672-7002) | EACH | 70 | $5.00 | $5.00 | $12.00 | $10.00 | $12.50 | $10.00 | $12.00 |
| 49 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 63 | $5.00 | $5.00 | $12.00 | $10.00 | $12.50 | $10.00 | $12.00 |
| 50 | Eliminating existing PM & markers (4") (677-7001) | LF | 12,370 | $0.25 | $0.57 | $0.55 | $0.50 | $0.60 | $0.50 | $1.00 |
| 51 | Eliminating existing PM & markers (6") (677-7002) | LF | 11,202 | $0.25 | $0.62 | $0.55 | $0.50 | $0.60 | $0.50 | $1.00 |
| 52 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 9 | $200.00 | $2,500.00 | $6,000.00 | $2,272.00 | $2,300.00 | $524.00 | $2,978.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.