TxDOT contract A00217375 bid tabulation
REPAIR/REPLACE CONCRETE BARRIER, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION). Let by Texas DOT on December 10, 2025, Collin, Dallas District. 7 bids received; low bid $89,809 by Fireman Excavating, Inc., -64% against the engineer's estimate of $249,736.
- Owner
- Texas DOT
- Letting
- 10 DEC 2025
- Pay items
- 12
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fireman Excavating, Inc. | $89,809 | Low | -64% |
| 2 | BK Field Operations LLC | $175,900 | +96% | -30% |
| 3 | Ibctx, LLC | $210,680 | +135% | -16% |
| 4 | Premier Contractors LLC | $221,040 | +146% | -11% |
| 5 | Structural Integrity Group LLC | $223,560 | +149% | -10% |
| 6 | Aad Contracting Inc. | $228,900 | +155% | -8.0% |
| 7 | O. Trevino Construction, LLC | $280,480 | +212% | +12% |
Engineer's estimate: $249,736.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Fireman Excavating, Inc. | 2. BK Field Operations LLC | 3. Ibctx, LLC | 4. Premier Contractors LLC | 5. Structural Integrity Group LLC | 6. Aad Contracting Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb) (104-7016) | LF | 1,000 | $4.75 | $1.00 | $15.00 | $16.00 | $25.00 | $31.00 | $10.00 |
| 2 | Removing concrete (curb & gutter) (104-7017) | LF | 100 | $20.86 | $1.00 | $40.00 | $25.00 | $25.00 | $42.00 | $15.00 |
| 3 | Opaque sealer finish (427-7003) | SF | 200 | $5.00 | $10.00 | $40.00 | $8.00 | $1.00 | $12.00 | $12.00 |
| 4 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 400 | $250.00 | $100.00 | $140.00 | $285.00 | $250.00 | $125.00 | $250.00 |
| 5 | Mobilization (callout) (500-7002) | EACH | 9 | $1,500.00 | $1.00 | $4,000.00 | $500.00 | $2,000.00 | $3,000.00 | $2,500.00 |
| 6 | Mobilization (emergency) (500-7033) | EACH | 3 | $2,000.00 | $1,000.00 | $4,000.00 | $800.00 | $2,000.00 | $3,000.00 | $5,000.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 100 | $400.00 | $1.00 | $1.00 | $50.00 | $1.00 | $225.00 | $350.00 |
| 8 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 120 | $160.00 | $80.00 | $125.00 | $90.00 | $37.00 | $87.00 | $75.00 |
| 9 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 120 | $100.00 | $50.00 | $70.00 | $30.00 | $150.00 | $30.00 | $50.00 |
| 10 | Portable concrete traffic barrier (aligning) (512-7108) | LF | 240 | $30.00 | $25.00 | $10.00 | $22.00 | $20.00 | $48.00 | $100.00 |
| 11 | Concrete curb (type II) (529-7002) | LF | 1,000 | $40.00 | $20.00 | $15.00 | $38.00 | $35.00 | $45.00 | $1.00 |
| 12 | Concrete curb & gutter (type II) (529-7009) | LF | 100 | $40.00 | $20.00 | $40.00 | $70.00 | $70.00 | $69.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 10, 2025. Compiled by Mirage Metrics.