Hodges and Son Construction Company, Inc.: TxDOT bid record
Hodges and Son Construction Company, Inc. submitted 271 bids on Texas DOT contracts in the data, from 04 MAR 2020 to 03 NOV 2026, and was the low bidder on 38 of them (14%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $92,060,611
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 28 | 4 | 14% |
| 2021 | 48 | 8 | 17% |
| 2022 | 32 | 5 | 16% |
| 2023 | 38 | 5 | 13% |
| 2024 | 24 | 5 | 21% |
| 2025 | 51 | 4 | 8% |
| 2026 | 50 | 7 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Paris District | 36 | 7 | 19% |
| Bryan District | 24 | 0 | 0% |
| Abilene District | 24 | 5 | 21% |
| Lufkin District | 23 | 2 | 9% |
| Fort Worth District | 20 | 4 | 20% |
| Childress District | 19 | 3 | 16% |
| Waco District | 17 | 2 | 12% |
| Wichita Falls District | 17 | 4 | 24% |
| Atlanta District | 17 | 2 | 12% |
| Dallas District | 14 | 3 | 21% |
| Yoakum District | 14 | 1 | 7% |
| Brownwood District | 13 | 2 | 15% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (install) | 506-7039 | LF | 239 | 222 (93%) | $1.00 | $4.00 |
| Rock filter dams (remove) | 506-7011 | LF | 211 | 203 (96%) | $1.00 | $12.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 240 | 140 (58%) | $1.00 | $1.00 |
| Construction exits (remove) | 506-7024 | SY | 101 | 99 (98%) | $1.00 | $10.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 135 | 85 (63%) | $50.00 | $110.00 |
| Drilled shaft (36 in) | 416-7006 | LF | 144 | 78 (54%) | $250.00 | $300.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 237 | 66 (28%) | $3,000.00 | $3,245.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 118 | 60 (51%) | $1,800.00 | $2,140.00 |
| Remove metal beam guard fence | 542-7001 | LF | 94 | 58 (62%) | $2.00 | $3.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 179 | 51 (28%) | $30.00 | $35.00 |
| Drilled shaft (24 in) | 416-7004 | LF | 91 | 51 (56%) | $185.00 | $245.78 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 150 | 49 (33%) | $26.00 | $27.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Earth Builders, L.P. | 71 | 29 of 71 |
| East Texas Bridge, Inc. | 65 | 27 of 65 |
| THK Construction LLC | 61 | 47 of 61 |
| Highway 19 Construction LLC | 58 | 38 of 58 |
| Skyline Bridge LLC | 56 | 36 of 56 |
| Coppell Construction Co., Inc. | 51 | 23 of 51 |
| Knife River Corporation - South | 48 | 27 of 48 |
| STX Civil | 37 | 24 of 37 |
| Stateline Construction, LLC | 36 | 24 of 36 |
| Pierce R & B LLC | 34 | 19 of 34 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 7 of 15 | $832,669 | +15% |
| 03 NOV 2026 | A00223831 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 13 of 15 | $1,995,650 | +152% |
| 03 SEP 2026 | A00139727 | Paris District | Bridge Replacement, FM 911 (FM 911 to At Anderson Creek) | 8 of 8 | $1,843,764 | +25% |
| 03 SEP 2026 | A00189990 | Bryan District | Bridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK) | 7 of 7 | $1,376,783 | +20% |
| 03 SEP 2026 | A00207389 | Childress District | Bridge Replacement, FM 1547 (@ Buck Creek to .) | 5 of 7 | $4,089,657 | +36% |
| 03 SEP 2026 | A00127879 | Paris District | Bridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK) | 6 of 8 | $2,601,427 | +22% |
| 02 SEP 2026 | A00195348 | Paris District | Bridge Replacement, FM 44 (At White Oak Creek to .) | 7 of 7 | $2,146,297 | +20% |
| 02 SEP 2026 | A00207438 | Wichita Falls District | Bridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw) | 2 of 6 | $2,845,260 | +1.0% |
| 02 SEP 2026 | A00207409 | Yoakum District | Bridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001) | 9 of 12 | $3,464,249 | +29% |
| 06 AUG 2026 | A00214454 | Fort Worth District | Bridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .) | 1 of 8 | $961,912 | Low, 1.0% under the second |
| 06 AUG 2026 | A00194392 | Lufkin District | Bridge Replacement, CR 1170 (At Sikes Creek to .) | 6 of 6 | $3,422,483 | +22% |
| 06 AUG 2026 | A00190819 | Paris District | Bridge Replacement, COUNTY ROAD 1018 (At Big Creek to .) | 1 of 5 | $1,492,466 | Low, 2.0% under the second |
| 05 AUG 2026 | A00217091 | Beaumont District | BRIDGE PREVENTATIVE MAINTENANCE, US0096 (Various to Various) | 8 of 8 | $3,596,745 | +91% |
| 05 AUG 2026 | A00189992 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (On CR 244 (F-CR 265) to At Eads Creek) | 2 of 8 | $2,579,009 | 0.0% |
| 05 AUG 2026 | A00065091 | Fort Worth District | Bridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .) | 1 of 10 | $1,531,854 | Low, 15% under the second |
| 05 AUG 2026 | A00190871 | Paris District | Bridge Replacement, COUNTY ROAD 35080 (At Cottonwood Creek to .) | 1 of 8 | $800,948 | Low, 15% under the second |
| 05 AUG 2026 | A00206283 | Yoakum District | Bridge Replacement, FREYBURG ENGLE RD (@ ROCKY CREEK to STR# AA02-75-002 (FREYBURG-ENGLE RD)) | 4 of 9 | $1,936,028 | +20% |
| 01 JUL 2026 | A00131299 | Waco District | Bridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82)) | 3 of 8 | $2,377,286 | +14% |
| 03 JUN 2026 | A00185405 | Dallas District | Bridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .) | 5 of 5 | $3,220,896 | +37% |
| 03 JUN 2026 | A00210173 | Lubbock District | Bridge Maintenance, US 87 (1.95 mi south of FM 145 to On US 87) | 8 of 9 | $4,592,854 | +67% |
| 02 JUN 2026 | A00184211 | Atlanta District | Bridge Replacement, COUNTY ROAD 430 (At McFaddin Creek Tributary to .) | 2 of 7 | $2,619,044 | +11% |
| 02 JUN 2026 | A00200068 | Childress District | Bridge Replacement, SH 70 (@ Quitaque River to .) | 3 of 9 | $3,932,668 | +16% |
| 07 MAY 2026 | A00178374 | Beaumont District | Bridge Replacement, S BURTON RD (S. BURTON RD @ SANDY CREEK to (STR#201810AA0237001)) | 2 of 3 | $1,972,581 | +11% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 16 of 17 | $1,636,689 | +72% |
| 07 MAY 2026 | A00203223 | Waco District | Removal And/Or Replacement And/Or Disposal, OLD ROBINSON DR (Old Robinson Rd @ Drain to Old Robinson Rd @ Drain) | 6 of 6 | $906,866 | +57% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.