Hodges and Son Construction Company, Inc.: TxDOT bid record

Hodges and Son Construction Company, Inc. submitted 271 bids on Texas DOT contracts in the data, from 04 MAR 2020 to 03 NOV 2026, and was the low bidder on 38 of them (14%). When it was not low, its total sat a median +20% above the low bid.

Owner
Texas DOT
Low bid volume
$92,060,611
Latest bid
03 NOV 2026
Data through
19 NOV 2026
271Bids
38Low bids
14Win rate, percent
+20%Median gap to the low bid when not low, 232 bids

By year

YearBidsLow bidsWin rate
202028414%
202148817%
202232516%
202338513%
202424521%
20255148%
202650714%
Hodges and Son Construction Company, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Paris District36719%
Bryan District2400%
Abilene District24521%
Lufkin District2329%
Fort Worth District20420%
Childress District19316%
Waco District17212%
Wichita Falls District17424%
Atlanta District17212%
Dallas District14321%
Yoakum District1417%
Brownwood District13215%
Hodges and Son Construction Company, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (install)506-7039LF239222 (93%)$1.00$4.00
Rock filter dams (remove)506-7011LF211203 (96%)$1.00$12.00
Temporary sediment control fence (remove)506-7041LF240140 (58%)$1.00$1.00
Construction exits (remove)506-7024SY10199 (98%)$1.00$10.00
Remove SM RD SN sup&AM644-7073EACH13585 (63%)$50.00$110.00
Drilled shaft (36 in)416-7006LF14478 (54%)$250.00$300.00
Guardrail end treatment (install)544-7001EACH23766 (28%)$3,000.00$3,245.00
Metal beam guard fence trans (thrie-beam)540-7005EACH11860 (51%)$1,800.00$2,140.00
Remove metal beam guard fence542-7001LF9458 (62%)$2.00$3.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI)658-7019EACH17951 (28%)$30.00$35.00
Drilled shaft (24 in)416-7004LF9151 (56%)$185.00$245.78
Metal W-beam guard fence (timber post)540-7001LF15049 (33%)$26.00$27.00
Hodges and Son Construction Company, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Hodges and Son Construction Company, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)7 of 15$832,669+15%
03 NOV 2026A00223831Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)13 of 15$1,995,650+152%
03 SEP 2026A00139727Paris DistrictBridge Replacement, FM 911 (FM 911 to At Anderson Creek)8 of 8$1,843,764+25%
03 SEP 2026A00189990Bryan DistrictBridge Replacement, BETHEL CEMETERY RD (ON CR 444 (BETHEL CEMETERY RD, F-CR 231) to AT BEDIAS CREEK)7 of 7$1,376,783+20%
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)5 of 7$4,089,657+36%
03 SEP 2026A00127879Paris DistrictBridge Replacement, FARMINGTON RD (Farmington Rd to AT CHOCTAW CREEK)6 of 8$2,601,427+22%
02 SEP 2026A00195348Paris DistrictBridge Replacement, FM 44 (At White Oak Creek to .)7 of 7$2,146,297+20%
02 SEP 2026A00207438Wichita Falls DistrictBridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw)2 of 6$2,845,260+1.0%
02 SEP 2026A00207409Yoakum DistrictBridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001)9 of 12$3,464,249+29%
06 AUG 2026A00214454Fort Worth DistrictBridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .)1 of 8$961,912Low, 1.0% under the second
06 AUG 2026A00194392Lufkin DistrictBridge Replacement, CR 1170 (At Sikes Creek to .)6 of 6$3,422,483+22%
06 AUG 2026A00190819Paris DistrictBridge Replacement, COUNTY ROAD 1018 (At Big Creek to .)1 of 5$1,492,466Low, 2.0% under the second
05 AUG 2026A00217091Beaumont DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0096 (Various to Various)8 of 8$3,596,745+91%
05 AUG 2026A00189992Bryan DistrictBridge Replacement, COUNTY ROAD 244 (On CR 244 (F-CR 265) to At Eads Creek)2 of 8$2,579,0090.0%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)1 of 10$1,531,854Low, 15% under the second
05 AUG 2026A00190871Paris DistrictBridge Replacement, COUNTY ROAD 35080 (At Cottonwood Creek to .)1 of 8$800,948Low, 15% under the second
05 AUG 2026A00206283Yoakum DistrictBridge Replacement, FREYBURG ENGLE RD (@ ROCKY CREEK to STR# AA02-75-002 (FREYBURG-ENGLE RD))4 of 9$1,936,028+20%
01 JUL 2026A00131299Waco DistrictBridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82))3 of 8$2,377,286+14%
03 JUN 2026A00185405Dallas DistrictBridge Replacement, FRANKFORD RD E (Frankford Rd WB AT Furneaux Creek to .)5 of 5$3,220,896+37%
03 JUN 2026A00210173Lubbock DistrictBridge Maintenance, US 87 (1.95 mi south of FM 145 to On US 87)8 of 9$4,592,854+67%
02 JUN 2026A00184211Atlanta DistrictBridge Replacement, COUNTY ROAD 430 (At McFaddin Creek Tributary to .)2 of 7$2,619,044+11%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)3 of 9$3,932,668+16%
07 MAY 2026A00178374Beaumont DistrictBridge Replacement, S BURTON RD (S. BURTON RD @ SANDY CREEK to (STR#201810AA0237001))2 of 3$1,972,581+11%
07 MAY 2026A00207502San Antonio DistrictBridge Replacement, FM 1107 (At Ecleto Creek to .)16 of 17$1,636,689+72%
07 MAY 2026A00203223Waco DistrictRemoval And/Or Replacement And/Or Disposal, OLD ROBINSON DR (Old Robinson Rd @ Drain to Old Robinson Rd @ Drain)6 of 6$906,866+57%
Hodges and Son Construction Company, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy