TxDOT contract A00065091 bid tabulation
Bridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .). Let by Texas DOT on August 5, 2026, Parker, Fort Worth District. 10 bids received; low bid $1,531,854 by Hodges and Son Construction Company, Inc., -15% against the engineer's estimate of $1,806,941.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 50
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hodges and Son Construction Company, Inc. | $1,531,854 | Low | -15% |
| 2 | Scott Tucker Construction Company, LLC | $1,755,898 | +15% | -3.0% |
| 3 | Garret Shields Infrastructure | $1,773,616 | +16% | -2.0% |
| 4 | Coppell Construction Co., Inc. | $1,783,475 | +16% | -1.0% |
| 5 | Pmco Construction LLC | $1,794,044 | +17% | -1.0% |
| 6 | Ed Bell Construction Company | $1,867,886 | +22% | +3.0% |
| 7 | Delgado'S Contractors, LLC | $1,888,841 | +23% | +5.0% |
| 8 | Earth Builders, L.P. | $2,065,827 | +35% | +14% |
| 9 | Tucan Contracting, LLC | $2,073,462 | +35% | +15% |
| 10 | Castillo Aranda LLC | $2,230,615 | +46% | +23% |
Engineer's estimate: $1,806,941.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hodges and Son Construction Company, Inc. | 2. Scott Tucker Construction Company, LLC | 3. Garret Shields Infrastructure | 4. Coppell Construction Co., Inc. | 5. Pmco Construction LLC | 6. Ed Bell Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 7.30 | $3,500.00 | $2,050.00 | $3,025.00 | $5,000.00 | $6,000.00 | $4,000.00 | $21,000 |
| 2 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 1,160 | $9.00 | $3.50 | $15.00 | $30.00 | $12.50 | $14.00 | $9.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 2,076 | $15.00 | $5.00 | $24.00 | $40.00 | $25.00 | $22.00 | $15.00 |
| 4 | Embankment (final)(OC)(type C) (132-7005) | CY | 607 | $20.00 | $30.00 | $71.00 | $40.00 | $27.00 | $24.00 | $1.00 |
| 5 | Backfill (type A or B) (134-7004) | STA | 6.50 | $166.00 | $100.00 | $280.00 | $40.00 | $1,500.00 | $500.00 | $525.00 |
| 6 | Block sodding (162-7002) | SY | 2,137 | $9.00 | $8.00 | $7.00 | $8.00 | $5.00 | $5.15 | $6.00 |
| 7 | Vegetative watering (168-7001) | TGL | 75 | $13.00 | $1.00 | $422.00 | $20.00 | $50.00 | $50.00 | $100.00 |
| 8 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 1,256 | $25.00 | $38.00 | $22.00 | $25.00 | $29.00 | $42.00 | $35.00 |
| 9 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 376 | $6.00 | $18.00 | $7.00 | $10.00 | $8.00 | $19.00 | $9.00 |
| 10 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 250 | $158.00 | $250.00 | $252.00 | $280.00 | $230.00 | $257.00 | $250.00 |
| 11 | Tack coat (344-7077) | GAL | 251 | $2.00 | $1.00 | $5.00 | $11.00 | $9.00 | $1.55 | $9.00 |
| 12 | Cem stabil BKFL (400-7010) | CY | 178 | $287.00 | $280.00 | $156.00 | $200.00 | $270.00 | $275.00 | $275.00 |
| 13 | Drilled shaft (36 in) (416-7006) | LF | 469 | $275.00 | $250.00 | $325.00 | $320.00 | $275.00 | $325.00 | $275.00 |
| 14 | Class C concrete (abutment)(HPC) (420-7013) | CY | 50.20 | $1,200.00 | $1,200.00 | $1,195.00 | $1,200.00 | $1,165.00 | $1,550.00 | $1,500.00 |
| 15 | Class C concrete (cap)(HPC) (420-7023) | CY | 37.40 | $1,500.00 | $1,200.00 | $2,372.00 | $2,500.00 | $1,075.00 | $2,400.00 | $1,500.00 |
| 16 | Class C concrete (column)(HPC) (420-7039) | CY | 30.10 | $1,515.00 | $1,200.00 | $1,934.00 | $2,500.00 | $1,300.00 | $2,400.00 | $1,500.00 |
| 17 | Reinforced concrete slab (HPC) (422-7002) | SF | 6,300 | $30.00 | $32.00 | $29.00 | $25.00 | $34.00 | $38.00 | $33.00 |
| 18 | Approach slab (HPC) (422-7014) | CY | 82 | $785.00 | $800.00 | $566.00 | $800.00 | $750.00 | $850.00 | $1,000.00 |
| 19 | Prestressed concrete girder (TX28) (425-7001) | LF | 742.42 | $309.00 | $250.00 | $355.00 | $260.00 | $255.00 | $228.00 | $300.00 |
| 20 | Riprap (mow strip)(4 in) (432-7013) | CY | 44 | $745.00 | $700.00 | $619.00 | $600.00 | $750.00 | $850.00 | $800.00 |
| 21 | Riprap (stone protection)(24 in) (432-7045) | CY | 902 | $195.00 | $160.00 | $150.00 | $200.00 | $200.00 | $160.00 | $200.00 |
| 22 | Rail (type T223)(HPC) (450-7009) | LF | 348 | $165.00 | $180.00 | $222.00 | $180.00 | $165.00 | $180.00 | $150.00 |
| 23 | Sealed expansion joint (4 in) (SEJ - B) (454-7006) | LF | 85 | $168.00 | $175.00 | $112.00 | $200.00 | $190.00 | $140.00 | $150.00 |
| 24 | Removing structure (box culvert) (496-7001) | EACH | 2 | $12,770 | $3,000.00 | $1,291.00 | $5,000.00 | $15,000 | $7,500.00 | $3,000.00 |
| 25 | Removing structure (headwall) (496-7006) | EACH | 4 | $1,693.00 | $800.00 | $583.00 | $2,000.00 | $6,000.00 | $2,500.00 | $2,000.00 |
| 26 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $115,000 | $40,000 | $40,377 | $50,000 | $60,000 | $35,000 | $40,000 |
| 27 | Mobilization (500-7001) | LS | 1 | $152,631 | $125,000 | $175,500 | $150,000 | $160,000 | $175,000 | $179,000 |
| 28 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $16,000 | $5,000.00 | $2,037.00 | $5,000.00 | $9,000.00 | $3,500.00 | $5,250.00 |
| 29 | Portable changeable message sign (503-7002) | EACH | 4 | $8,523.00 | $15,000 | $7,381.00 | $5,000.00 | $12,000 | $7,500.00 | $7,350.00 |
| 30 | Rock filter dams (install) (type 2) (506-7002) | LF | 164 | $48.00 | $1.00 | $30.00 | $20.00 | $42.00 | $30.00 | $55.00 |
| 31 | Rock filter dams (remove) (506-7011) | LF | 164 | $13.00 | $1.00 | $11.00 | $5.00 | $15.00 | $12.00 | $27.50 |
| 32 | Temporary sediment control fence (install) (506-7039) | LF | 1,094 | $4.00 | $1.00 | $4.00 | $5.00 | $3.25 | $4.00 | $5.00 |
| 33 | Temporary sediment control fence (remove) (506-7041) | LF | 1,094 | $1.10 | $1.00 | $2.00 | $1.00 | $1.25 | $1.25 | $2.50 |
| 34 | Metal W-beam guard fence (timber post) (540-7001) | LF | 400 | $25.00 | $25.00 | $28.00 | $35.00 | $28.00 | $24.50 | $25.00 |
| 35 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,050.00 | $1,800.00 | $2,717.00 | $1,500.00 | $2,300.00 | $2,025.00 | $3,300.00 |
| 36 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,200.00 | $3,400.00 | $3,487.00 | $3,500.00 | $3,400.00 | $3,180.00 | $3,200.00 |
| 37 | Wire fence (type C) (552-7003) | LF | 321 | $25.00 | $20.00 | $44.00 | $25.00 | $18.00 | $25.00 | $15.50 |
| 38 | Wire fence (type D) (552-7004) | LF | 321 | $17.00 | $20.00 | $26.00 | $25.00 | $21.00 | $35.00 | $22.00 |
| 39 | Aluminum signs (type A) (636-7001) | SF | 1.33 | $38.00 | $1,500.00 | $91.00 | $100.00 | $150.00 | $250.00 | $160.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $721.00 | $1,500.00 | $1,137.00 | $1,000.00 | $1,500.00 | $1,700.00 | $1,600.00 |
| 41 | Remove SM RD SN sup&AM (644-7073) | EACH | 12 | $134.00 | $50.00 | $115.00 | $100.00 | $150.00 | $100.00 | $160.00 |
| 42 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 2 | $23.00 | $20.00 | $14.00 | $20.00 | $15.00 | $82.00 | $22.00 |
| 43 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $35.00 | $25.00 | $29.00 | $20.00 | $30.00 | $38.00 | $27.00 |
| 44 | Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249) | EACH | 4 | $213.00 | $500.00 | $263.00 | $200.00 | $425.00 | $200.00 | $200.00 |
| 45 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 402 | $0.20 | $2.00 | $2.00 | $0.86 | $1.50 | $2.25 | $2.20 |
| 46 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 402 | $0.20 | $2.00 | $2.00 | $0.86 | $1.50 | $2.25 | $2.20 |
| 47 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 1,050 | $0.70 | $3.00 | $3.00 | $1.50 | $2.00 | $3.25 | $3.30 |
| 48 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 1,050 | $0.70 | $3.00 | $3.00 | $1.50 | $2.00 | $3.25 | $3.30 |
| 49 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 14 | $4.00 | $25.00 | $25.00 | $16.25 | $10.00 | $20.00 | $22.00 |
| 50 | Pavement surface preparation for marking (6") (678-7002) | LF | 804 | $0.20 | $0.50 | $1.00 | $6.00 | $1.00 | $1.25 | $1.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.