Coppell Construction Co., Inc.: TxDOT bid record

Coppell Construction Co., Inc. submitted 73 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 04 NOV 2026, and was the low bidder on 9 of them (12%). When it was not low, its total sat a median +19% above the low bid.

Owner
Texas DOT
Low bid volume
$31,929,595
Latest bid
04 NOV 2026
Data through
19 NOV 2026
73Bids
9Low bids
12Win rate, percent
+19%Median gap to the low bid when not low, 64 bids

By year

YearBidsLow bidsWin rate
2020300%
20217229%
2022700%
20236117%
20246117%
202523313%
202621210%
Coppell Construction Co., Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Abilene District16319%
Fort Worth District1200%
Childress District10220%
Amarillo District9111%
Wichita Falls District9111%
Brownwood District400%
Paris District300%
Odessa District300%
Dallas District200%
Lubbock District2150%
Loving100%
San Angelo District100%
Coppell Construction Co., Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF5125 (49%)$1.00$1.00
Biodegradable erosion control logs (remove)506-7046LF4425 (57%)$1.12$1.40
Guardrail end treatment (install)544-7001EACH6321 (33%)$3,275.00$3,245.00
Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI)658-7019EACH4516 (36%)$30.00$35.00
Metal beam guard fence trans (thrie-beam)540-7005EACH3916 (41%)$2,281.00$2,140.00
Reflectorized pavement marker type II-A-A672-7004EACH3615 (42%)$10.00$5.00
Metal W-beam guard fence (timber post)540-7001LF3315 (45%)$26.00$27.00
Metal W-beam guard fence (steel post)540-7002LF2914 (48%)$31.00$33.00
Class C concrete (cap)(HPC)420-7023CY2514 (56%)$1,430.00$1,500.00
Barricades, signs and traffic handling502-7001MO7213 (18%)$12,250$5,000.00
Remove metal beam guard fence542-7001LF3613 (36%)$3.00$3.00
Pavement surface preparation for marking (6")678-7002LF3013 (43%)$1.00$0.18
Coppell Construction Co., Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Coppell Construction Co., Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00223826Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)4 of 16$832,395+19%
03 NOV 2026A00223831Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)4 of 15$912,076+15%
03 NOV 2026A00211505Amarillo DistrictBridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .)1 of 8$5,800,486Low, 2.0% under the second
13 OCT 2026A00224304Odessa DistrictBRIDGE REPAIR, IH0020 (VARIOUS to VARIOUS)3 of 5$921,400+51%
07 OCT 2026A00191892Odessa DistrictBridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .)4 of 7$9,324,743+38%
07 OCT 2026A00218294Fort Worth DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0114 (VARIOUS LOCATIONS WITHIN to Jack & Wise Counties)3 of 7$1,383,818+33%
06 OCT 2026A00220460Brownwood DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0016 (DISTRICT-WIDE to DISTRICT-WIDE)8 of 11$1,306,824+80%
03 SEP 2026A00207389Childress DistrictBridge Replacement, FM 1547 (@ Buck Creek to .)1 of 7$3,017,334Low, 14% under the second
06 AUG 2026A00214454Fort Worth DistrictBridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .)5 of 8$1,140,751+19%
05 AUG 2026A00065091Fort Worth DistrictBridge Replacement, DENNIS RD (DENNIS ROAD AT PATRICK CREEK to .)4 of 10$1,783,475+16%
03 JUN 2026A00210173Lubbock DistrictBridge Maintenance, US 87 (1.95 mi south of FM 145 to On US 87)4 of 9$3,041,557+11%
02 JUN 2026A00200068Childress DistrictBridge Replacement, SH 70 (@ Quitaque River to .)5 of 9$4,044,923+19%
08 APR 2026A00194074Abilene DistrictBridge Replacement, CR 305 (ALKALI CRK TRIB to .)6 of 7$2,418,193+29%
08 APR 2026A00037264Fort Worth DistrictBridge Replacement, OLD GRANBURY RD (OLD GRANBURY RD OVER WALNUT CREEK to .)8 of 8$945,897+49%
07 APR 2026A00061686Abilene DistrictBridge Replacement, COUNTY ROAD 412 (CR 412 to AT COTTONWOOD CRK TRIB)5 of 6$4,172,547+32%
05 MAR 2026A00195344Paris DistrictBridge Replacement, FM 816 (At Loring Creek Relief to .)12 of 12$3,038,489+46%
04 MAR 2026A00188550Amarillo DistrictRehabilitate Bridge, N HUGHES (N HUGHES ST @ BNSF RR to .)5 of 6$7,389,017+63%
05 FEB 2026A00065079Fort Worth DistrictBridge Replacement, COUNTY ROAD 351 (CR 351 @ BELL BRANCH to .)11 of 12$875,581+40%
04 FEB 2026A00188551Amarillo DistrictBridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .)4 of 7$2,529,275+27%
04 FEB 2026A00036817Fort Worth DistrictBridge Replacement, COUNTY ROAD 218 (CR 218 OVER DUFFAU CREEK to .)8 of 9$1,510,353+55%
04 FEB 2026A00032669Fort Worth DistrictBridge Replacement, CR 6010 (ROBERTS RD. AT PANTHER CREEK to .)6 of 9$1,068,061+22%
03 DEC 2025A00207372Childress DistrictBridge Replacement, COUNTY ROAD 384 (@ Duck Creek to .)4 of 5$1,320,787+30%
03 DEC 2025A00045322Abilene DistrictBridge Replacement, FM 604 (AT JIM NED CREEK to .)8 of 9$4,677,220+73%
06 NOV 2025A00036755Abilene DistrictBridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .)1 of 8$1,728,544Low, 8.0% under the second
09 OCT 2025A00194081Abilene DistrictBridge Replacement, CR 314 (AT DRAW to .)4 of 8$1,044,657+14%
Coppell Construction Co., Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.