TxDOT contract A00032669 bid tabulation
Bridge Replacement, CR 6010 (ROBERTS RD. AT PANTHER CREEK to .). Let by Texas DOT on February 4, 2026, Wise, Fort Worth District. 9 bids received; low bid $875,772 by THK Construction LLC, -14% against the engineer's estimate of $1,013,533.
- Owner
- Texas DOT
- Letting
- 04 FEB 2026
- Pay items
- 48
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | THK Construction LLC | $875,772 | Low | -14% |
| 2 | Hodges and Son Construction Company, Inc. | $875,953 | 0.0% | -14% |
| 3 | Blacksmith Ventures LLC | $947,250 | +8.0% | -7.0% |
| 4 | Skyline Bridge LLC | $966,060 | +10% | -5.0% |
| 5 | Garret Shields Infrastructure | $974,364 | +11% | -4.0% |
| 6 | Coppell Construction Co., Inc. | $1,068,061 | +22% | +5.0% |
| 7 | Tucan Contracting, LLC | $1,145,255 | +31% | +13% |
| 8 | Ed Bell Construction Company | $1,364,934 | +56% | +35% |
| 9 | Earth Builders, L.P. | $1,526,753 | +74% | +51% |
Engineer's estimate: $1,013,533.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. THK Construction LLC | 2. Hodges and Son Construction Company, Inc. | 3. Blacksmith Ventures LLC | 4. Skyline Bridge LLC | 5. Garret Shields Infrastructure | 6. Coppell Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 3.90 | $10,000 | $7,000.00 | $4,000.00 | $2,000.00 | $4,500.00 | $1,000.00 | $5,000.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 228 | $30.00 | $20.00 | $15.00 | $25.00 | $22.00 | $40.00 | $40.00 |
| 3 | Embankment (final)(DC)(type B) (132-7004) | CY | 426 | $40.00 | $20.00 | $20.00 | $25.00 | $45.00 | $40.00 | $50.00 |
| 4 | Compost manuf topsoil (4") (161-7002) | SY | 778 | $1.50 | $6.95 | $3.50 | $5.00 | $5.00 | $4.00 | $10.00 |
| 5 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 778 | $1.00 | $3.77 | $3.50 | $5.00 | $2.00 | $2.50 | $1.50 |
| 6 | Hydro mulch seed (temporary_warm) (164-7021) | SY | 389 | $2.50 | $5.38 | $1.00 | $5.00 | $2.00 | $5.00 | $1.50 |
| 7 | Hydro mulch seed (temporary_cool) (164-7022) | SY | 389 | $2.50 | $5.38 | $1.00 | $5.00 | $2.00 | $5.00 | $1.50 |
| 8 | Vegetative watering (168-7001) | TGL | 28 | $40.00 | $10.00 | $1.00 | $1.00 | $1.00 | $50.00 | $50.00 |
| 9 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 738 | $40.00 | $40.00 | $45.00 | $90.00 | $50.00 | $20.00 | $26.00 |
| 10 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 142 | $11.00 | $60.88 | $20.00 | $6.00 | $40.00 | $12.00 | $15.00 |
| 11 | Asphalt (CRS-2P) (316-7012) | GAL | 319 | $15.00 | $30.10 | $20.00 | $7.00 | $35.00 | $8.00 | $26.00 |
| 12 | Aggregate (type-B, GR-4)(sac-B) (316-7173) | CY | 7 | $350.00 | $1,720.00 | $1,900.00 | $300.00 | $2,100.00 | $500.00 | $2,220.00 |
| 13 | D-GR HMA type-C sac-B PG70-28 (341-7028) | TON | 82 | $300.00 | $416.03 | $300.00 | $200.00 | $410.00 | $260.00 | $390.00 |
| 14 | Tack coat (341-7082) | GAL | 71 | $5.00 | $5.38 | $8.00 | $6.00 | $10.00 | $10.00 | $22.00 |
| 15 | Cem stabil BKFL (400-7010) | CY | 68 | $217.00 | $300.00 | $300.00 | $300.00 | $325.00 | $200.00 | $260.00 |
| 16 | Drilled shaft (36 in) (416-7006) | LF | 378 | $240.00 | $287.28 | $210.00 | $250.00 | $275.00 | $420.00 | $300.00 |
| 17 | Core hole (416-7049) | EACH | 2 | $2,500.00 | $440.00 | $400.00 | $2,500.00 | $200.00 | $500.00 | $400.00 |
| 18 | Class C concrete (abutment) (420-7012) | CY | 31.60 | $1,800.00 | $1,100.00 | $1,200.00 | $3,000.00 | $1,300.00 | $2,000.00 | $1,400.00 |
| 19 | Reinforced concrete slab (422-7001) | SF | 1,950 | $25.00 | $37.00 | $34.00 | $30.00 | $31.00 | $20.00 | $37.50 |
| 20 | Approach slab (422-7013) | CY | 44.70 | $500.00 | $800.00 | $850.00 | $30.00 | $850.00 | $250.00 | $920.00 |
| 21 | Prestressed concrete girder (TX28) (425-7001) | LF | 297.93 | $250.00 | $333.02 | $290.00 | $280.00 | $325.00 | $300.00 | $300.00 |
| 22 | Riprap (mow strip)(4 in) (432-7013) | CY | 17 | $885.00 | $800.00 | $750.00 | $500.00 | $750.00 | $700.00 | $700.00 |
| 23 | Riprap (stone protection)(30 in) (432-7047) | CY | 771 | $230.00 | $160.00 | $190.00 | $225.00 | $180.00 | $150.00 | $230.00 |
| 24 | Rail (type T631) (450-7020) | LF | 182 | $100.00 | $98.23 | $90.00 | $250.00 | $94.00 | $150.00 | $87.25 |
| 25 | Armor joint (sealed) (454-7003) | LF | 46 | $140.00 | $150.00 | $200.00 | $100.00 | $225.00 | $500.00 | $170.00 |
| 26 | Removing structure (bridge slab) (496-7013) | EACH | 1 | $12,000 | $10,000 | $15,000 | $15,000 | $9,500.00 | $17,500 | $30,000 |
| 27 | Removing structure (abutment) (496-7014) | EACH | 2 | $22,000 | $5,000.00 | $8,000.00 | $5,000.00 | $5,000.00 | $10,000 | $15,000 |
| 28 | Mobilization (500-7001) | LS | 1 | $93,000 | $90,000 | $78,000 | $75,000 | $90,000 | $100,000 | $100,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,000 | $2,292.98 | $6,000.00 | $2,500.00 | $4,000.00 | $5,000.00 | $10,000 |
| 30 | Portable changeable message sign (503-7002) | EACH | 2 | $5,260.00 | $10,000 | $10,000 | $9,000.00 | $8,000.00 | $1,000.00 | $10,000 |
| 31 | Rock filter dams (install) (type 2) (506-7002) | LF | 50 | $50.00 | $50.00 | $1.00 | $1.00 | $50.00 | $30.00 | $64.00 |
| 32 | Rock filter dams (remove) (506-7011) | LF | 50 | $20.00 | $1.00 | $1.00 | $1.00 | $10.00 | $5.00 | $20.00 |
| 33 | Temporary sediment control fence (install) (506-7039) | LF | 964 | $3.00 | $3.77 | $1.00 | $6.00 | $3.75 | $5.00 | $5.00 |
| 34 | Temporary sediment control fence (remove) (506-7041) | LF | 964 | $1.00 | $1.08 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 200 | $8.00 | $4.14 | $1.00 | $200.00 | $12.00 | $5.00 | $9.00 |
| 36 | Biodegradable erosion control logs (remove) (506-7046) | LF | 200 | $4.00 | $1.08 | $1.00 | $1.00 | $4.00 | $1.00 | $1.00 |
| 37 | Metal W-beam guard fence (timber post) (540-7001) | LF | 100 | $25.00 | $25.00 | $25.00 | $35.00 | $27.00 | $40.00 | $24.00 |
| 38 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,332.50 | $3,100.00 | $3,400.00 | $3,500.00 | $3,500.00 | $3,100.00 |
| 39 | Wire fence (type C) (552-7003) | LF | 501 | $28.00 | $25.00 | $20.00 | $15.00 | $24.00 | $30.00 | $17.00 |
| 40 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $120.00 | $250.00 | $50.00 | $1.00 | $150.00 | $100.00 | $99.00 |
| 41 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 2 | $30.00 | $19.35 | $20.00 | $100.00 | $35.00 | $60.00 | $18.00 |
| 42 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 8 | $45.00 | $48.38 | $50.00 | $100.00 | $55.00 | $25.00 | $45.00 |
| 43 | Pavement sler 6" (666-7347) | LF | 484 | $0.25 | $1.62 | $1.50 | $5.00 | $2.00 | $2.80 | $1.50 |
| 44 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 780 | $1.25 | $2.69 | $2.50 | $3.00 | $3.00 | $2.90 | $2.50 |
| 45 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 780 | $1.25 | $2.69 | $2.50 | $3.00 | $3.00 | $0.10 | $2.50 |
| 46 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 10 | $10.00 | $26.88 | $25.00 | $25.00 | $30.00 | $1,400.00 | $25.00 |
| 47 | Pavement surface preparation for marking (6") (678-7002) | LF | 484 | $0.50 | $1.08 | $1.00 | $5.00 | $2.00 | $2.00 | $1.00 |
| 48 | Relocate existing truss bridge (4005-7001) | LS | 1 | $101,540 | $10,000 | $55,000 | $20,000 | $80,000 | $110,000 | $64,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 4, 2026. Compiled by Mirage Metrics.