TxDOT contract A00200068 bid tabulation
Bridge Replacement, SH 70 (@ Quitaque River to .). Let by Texas DOT on June 2, 2026, Motley, Childress District. 9 bids received; low bid $3,403,214 by Skyline Bridge LLC, +2.2% against the engineer's estimate of $3,331,357.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 63
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Skyline Bridge LLC | $3,403,214 | Low | +2.0% |
| 2 | Tucan Contracting, LLC | $3,678,460 | +8.0% | +10% |
| 3 | Hodges and Son Construction Company, Inc. | $3,932,668 | +16% | +18% |
| 4 | Altus Construction LLC | $3,960,162 | +16% | +19% |
| 5 | Coppell Construction Co., Inc. | $4,044,923 | +19% | +21% |
| 6 | Gilvin-Terrill, LTD. | $4,553,977 | +34% | +37% |
| 7 | Earth Builders, L.P. | $4,869,671 | +43% | +46% |
| 8 | J. Lee Milligan, Inc. | $5,374,971 | +58% | +61% |
| 9 | L A Fuller & Sons Construction, LTD. | $6,005,898 | +76% | +80% |
Engineer's estimate: $3,331,357.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Skyline Bridge LLC | 2. Tucan Contracting, LLC | 3. Hodges and Son Construction Company, Inc. | 4. Altus Construction LLC | 5. Coppell Construction Co., Inc. | 6. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 30 | $6,528.00 | $2,750.00 | $1,080.00 | $1,500.00 | $13,069 | $3,000.00 | $1,000.00 |
| 2 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 1,100 | $18.50 | $12.00 | $19.42 | $15.00 | $18.69 | $18.25 | $20.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 428 | $8.63 | $19.00 | $27.00 | $30.00 | $9.82 | $27.00 | $50.00 |
| 4 | Embankment (final)(DC)(type A) (132-7002) | CY | 158 | $24.20 | $65.00 | $27.00 | $35.00 | $36.29 | $23.00 | $50.00 |
| 5 | Drill seed (permanent_rural_sand) (164-7041) | ACRE | 0.40 | $1,327.00 | $5,800.00 | $1,235.28 | $8,000.00 | $1,317.23 | $3,500.00 | $3,500.00 |
| 6 | Drill seed (temporary_warm) (164-7045) | ACRE | 0.20 | $525.00 | $10,000 | $749.68 | $8,000.00 | $427.52 | $3,500.00 | $3,500.00 |
| 7 | Drill seed (temporary_cool) (164-7046) | ACRE | 0.20 | $641.00 | $10,000 | $985.21 | $8,000.00 | $584.97 | $3,500.00 | $3,500.00 |
| 8 | Vegetative watering (168-7001) | TGL | 16 | $8.27 | $1.00 | $54.00 | $1.00 | $6.90 | $50.00 | $120.00 |
| 9 | FL BS (compacted in place)(type A GR 1-2) (10") (247-7090) | SY | 1,100 | $21.00 | $55.00 | $43.20 | $50.00 | $26.37 | $41.00 | $50.00 |
| 10 | Prime coat (MC-30) (310-7004) | GAL | 330 | $5.15 | $40.00 | $29.16 | $6.00 | $4.09 | $40.00 | $25.00 |
| 11 | Asphalt (CRS-2P) (316-7012) | GAL | 880 | $10.00 | $30.00 | $21.60 | $12.00 | $4.32 | $40.00 | $15.00 |
| 12 | Aggregate (type-L, GR-4)(sac-A) (316-7124) | CY | 16 | $110.50 | $1,900.00 | $1,505.52 | $1,200.00 | $116.94 | $400.00 | $650.00 |
| 13 | Planing asphalt concrete pavement(4") (354-7053) | SY | 646 | $3.47 | $30.00 | $32.38 | $20.00 | $33.47 | $15.50 | $15.00 |
| 14 | Temporary special shoring (403-7001) | SF | 1,215 | $30.00 | $24.00 | $21.60 | $24.00 | $22.60 | $75.00 | $75.00 |
| 15 | Drilled shaft (18 in) (416-7002) | LF | 120 | $165.00 | $250.00 | $513.00 | $200.00 | $282.73 | $150.00 | $150.00 |
| 16 | Drilled shaft (36 in) (416-7006) | LF | 873 | $288.00 | $270.00 | $378.00 | $400.00 | $459.06 | $270.00 | $374.94 |
| 17 | Class C concrete (abutment) (420-7012) | CY | 51 | $1,395.00 | $1,425.00 | $1,296.00 | $1,900.00 | $1,275.80 | $1,505.00 | $2,300.00 |
| 18 | Class C concrete (cap) (420-7022) | CY | 64.40 | $1,668.00 | $2,000.00 | $1,620.00 | $1,800.00 | $1,994.77 | $1,350.00 | $2,300.00 |
| 19 | Class C concrete (column) (420-7038) | CY | 33.10 | $3,600.00 | $2,350.00 | $1,944.00 | $1,800.00 | $1,235.46 | $1,800.00 | $2,300.00 |
| 20 | Class C concrete(pile encasement) (420-7059) | LF | 174 | $685.00 | $432.00 | $965.00 | $698.11 | $600.00 | $500.00 | |
| 21 | Reinforced concrete slab (422-7001) | SF | 18,005 | $22.00 | $24.00 | $32.40 | $32.50 | $36.10 | $32.00 | $45.00 |
| 22 | Approach slab (422-7013) | CY | 58 | $740.00 | $950.00 | $972.00 | $1,200.00 | $1,041.04 | $1,300.00 | $2,300.00 |
| 23 | Prestressed concrete girder (TX40) (425-7003) | LF | 3,482.50 | $200.00 | $230.00 | $220.48 | $240.00 | $207.71 | $260.00 | $210.00 |
| 24 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 9 | $203.00 | $750.00 | $324.00 | $600.00 | $171.19 | $250.00 | $1,000.00 |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 86 | $635.00 | $600.00 | $702.00 | $700.00 | $575.90 | $750.00 | $750.00 |
| 26 | Riprap (stone protection)(24 in) (432-7045) | CY | 525 | $196.50 | $185.00 | $216.00 | $190.00 | $31.66 | $366.00 | $350.00 |
| 27 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 4,270 | $30.00 | $8.00 | $44.28 | $8.00 | $5.41 | $6.00 | $55.00 |
| 28 | Rail (type SSTR) (450-7024) | LF | 1,060 | $72.00 | $98.00 | $162.00 | $120.00 | $51.60 | $135.00 | $125.00 |
| 29 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 110 | $228.00 | $255.00 | $216.00 | $200.00 | $194.70 | $300.00 | $300.00 |
| 30 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $151,000 | $60,000 | $86,400 | $190,000 | $70,085 | $80,000 | $200,000 |
| 31 | Mobilization (500-7001) | LS | 1 | $330,049 | $300,000 | $270,000 | $345,000 | $394,039 | $400,000 | $460,000 |
| 32 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $3,500.00 | $2,400.00 | $2,160.00 | $3,500.00 | $13,201 | $14,000 | $3,200.00 |
| 33 | TMA (stationary) (505-7001) | DAY | 69 | $38.00 | $250.00 | $216.00 | $20.00 | $181.90 | $480.00 | $850.00 |
| 34 | TMA (mobile operation) (505-7002) | HR | 27 | $45.00 | $50.00 | $32.40 | $40.00 | $41.58 | $350.00 | $95.00 |
| 35 | Rock filter dams (install) (type 1) (506-7001) | LF | 150 | $38.30 | $48.00 | $37.80 | $1.00 | $32.26 | $65.00 | $65.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 150 | $13.40 | $10.00 | $5.40 | $1.00 | $11.02 | $25.00 | $25.00 |
| 37 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 250 | $8.08 | $13.00 | $6.48 | $5.00 | $6.25 | $8.50 | $8.50 |
| 38 | One-way traffic control (port traffic signal) (510-7003) | MO | 10 | $4,685.00 | $5,000.00 | $4,320.00 | $8,000.00 | $7,136.07 | $3,450.00 | $5,000.00 |
| 39 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 800 | $38.00 | $100.00 | $124.20 | $145.00 | $46.28 | $46.00 | $65.00 |
| 40 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 800 | $7.67 | $30.00 | $21.60 | $15.00 | $28.00 | $12.00 | $20.00 |
| 41 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 800 | $13.05 | $38.00 | $21.60 | $65.00 | $52.45 | $33.00 | $30.00 |
| 42 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,550 | $29.00 | $31.50 | $39.64 | $30.00 | $25.99 | $34.00 | $30.00 |
| 43 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,172.00 | $2,225.00 | $3,289.22 | $2,500.00 | $2,052.92 | $2,500.00 | $2,275.00 |
| 44 | Remove metal beam guard fence (542-7001) | LF | 1,850 | $2.70 | $5.00 | $3.50 | $2.00 | $3.12 | $2.00 | $3.00 |
| 45 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,185.00 | $3,465.00 | $3,976.39 | $3,600.00 | $3,404.21 | $4,500.00 | $3,300.00 |
| 46 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $256.00 | $250.00 | $364.37 | $500.00 | $343.02 | $200.00 | $300.00 |
| 47 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $1,453.00 | $500.00 | $2,160.00 | $2,000.00 | $1,585.16 | $2,500.00 | $2,500.00 |
| 48 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $972.00 | $800.00 | $1,080.00 | $1,000.00 | $841.96 | $2,000.00 | $2,500.00 |
| 49 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $9,173.00 | $9,831.50 | $7,560.00 | $10,000 | $7,490.04 | $10,000 | $2,500.00 |
| 50 | Wire fence (type C) (552-7003) | LF | 1,665 | $22.00 | $21.00 | $8.64 | $20.00 | $23.39 | $35.00 | $25.00 |
| 51 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 20 | $31.00 | $24.00 | $40.07 | $40.00 | $19.49 | $30.00 | $45.00 |
| 52 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 3,360 | $0.80 | $1.06 | $1.03 | $1.00 | $1.04 | $1.00 | $1.00 |
| 53 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 24 | $10.15 | $21.20 | $18.77 | $25.00 | $20.79 | $20.00 | $20.00 |
| 54 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 10,800 | $0.87 | $1.06 | $1.03 | $1.00 | $1.04 | $1.00 | $1.00 |
| 55 | Pavement sler 6" (666-7347) | LF | 1,125 | $0.21 | $2.39 | $2.39 | $2.50 | $2.34 | $2.25 | $2.25 |
| 56 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,680 | $0.47 | $5.30 | $1.83 | $5.00 | $5.20 | $5.00 | $5.00 |
| 57 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 210 | $0.49 | $5.30 | $0.64 | $5.00 | $5.20 | $5.00 | $5.00 |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 250 | $0.50 | $5.30 | $1.83 | $5.00 | $5.20 | $5.00 | $5.00 |
| 59 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 126 | $3.91 | $10.60 | $5.75 | $10.00 | $10.39 | $10.00 | $10.00 |
| 60 | Eliminating existing PM & markers (6") (677-7002) | LF | 14,160 | $0.34 | $1.06 | $0.72 | $1.00 | $1.04 | $1.00 | $1.00 |
| 61 | Eliminating existing PM & markers (24") (677-7008) | LF | 24 | $2.81 | $5.83 | $5.08 | $6.00 | $5.72 | $5.50 | $5.50 |
| 62 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,125 | $0.10 | $2.39 | $2.35 | $2.50 | $2.34 | $2.25 | $2.25 |
| 63 | Flowable fill backfill (7040-7014) | CY | 136 | $294.69 | $225.00 | $216.00 | $220.00 | $203.73 | $305.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.