J. Lee Milligan, Inc.: TxDOT bid record
J. Lee Milligan, Inc. submitted 116 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 03 SEP 2026, and was the low bidder on 24 of them (21%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $317,373,878
- Latest bid
- 03 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 13 | 3 | 23% |
| 2021 | 32 | 7 | 22% |
| 2022 | 14 | 1 | 7% |
| 2023 | 13 | 4 | 31% |
| 2024 | 14 | 3 | 21% |
| 2025 | 13 | 2 | 15% |
| 2026 | 17 | 4 | 24% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Amarillo District | 76 | 20 | 26% |
| Childress District | 29 | 4 | 14% |
| Lubbock District | 9 | 0 | 0% |
| Ochiltree | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (mobile operation) | 505-7002 | HR | 62 | 29 (47%) | $90.00 | $78.00 |
| Prime coat (MC-30) | 310-7004 | GAL | 62 | 22 (35%) | $5.53 | $6.42 |
| Guardrail end treatment (remove) | 544-7003 | EACH | 54 | 21 (39%) | $320.00 | $275.00 |
| Remove metal beam guard fence | 542-7001 | LF | 63 | 19 (30%) | $3.20 | $3.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 54 | 15 (28%) | $742.83 | $643.00 |
| Cement | 275-7001 | TON | 32 | 15 (47%) | $232.50 | $230.00 |
| Tack coat | 3077-6075 | GAL | 39 | 14 (36%) | $5.25 | $4.17 |
| Remove delin & object marker assms | 658-7078 | EACH | 34 | 14 (41%) | $16.00 | $24.00 |
| Excavation (roadway) | 110-7001 | CY | 56 | 13 (23%) | $21.48 | $20.00 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 46 | 13 (28%) | $163.50 | $108.13 |
| Emuls asphalt (erosion control)(multi) | 314-7018 | GAL | 36 | 12 (33%) | $4.90 | $5.75 |
| Drill seeding (temporary)(warm or cool) | 164-6053 | ACRE | 35 | 12 (34%) | $485.00 | $521.73 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gilvin-Terrill, LTD. | 72 | 30 of 72 |
| RK Hall, LLC | 64 | 39 of 64 |
| Duininck, Inc. | 49 | 36 of 49 |
| L A Fuller & Sons Construction, LTD. | 30 | 22 of 30 |
| Kiewit Infrastructure South Co. | 27 | 11 of 27 |
| A. L. Helmcamp, Inc. | 21 | 17 of 21 |
| Earth Builders, L.P. | 18 | 14 of 18 |
| Zack Burkett Co. | 9 | 8 of 9 |
| Big Creek Sand & Gravel, Inc. | 8 | 8 of 8 |
| Hodges and Son Construction Company, Inc. | 8 | 6 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 SEP 2026 | A00184830 | Amarillo District | Bridge Replacement, IH 40 (IH 40 AT SH 207 to .) | 5 of 7 | $12,984,816 | +31% |
| 03 SEP 2026 | A00207389 | Childress District | Bridge Replacement, FM 1547 (@ Buck Creek to .) | 7 of 7 | $5,691,985 | +89% |
| 06 AUG 2026 | A00193006 | Amarillo District | Surfacing/Roadway Restoration, US 87 (AMARILLO CREEK to 11 TH STREET IN AMARILLO) | 1 of 3 | $30,085,056 | Low, 3.0% under the second |
| 06 AUG 2026 | A00128671 | Childress District | Rehabilitate Existing Roadway, SH 256 (FM 2361, East to US 287) | 1 of 3 | $9,477,781 | Low, 40% under the second |
| 06 AUG 2026 | A00120927 | Lubbock District | Surfacing/Roadway Restoration, US 60 (5TH STREET IN FRIONA to WALNUT AVE IN FRIONA) | 2 of 5 | $10,064,052 | +3.0% |
| 05 AUG 2026 | A00128458 | Amarillo District | Construct New Road, SL 335 (NORTH OF FM 2186 to NORTH OF ARDEN ROAD) | 1 of 5 | $42,220,204 | Low, 5.0% under the second |
| 05 AUG 2026 | A00223089 | Amarillo District | FLEXIBLE BASE, US0054 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 4 of 4 | $1,381,073 | +12% |
| 29 JUL 2026 | A00222994 | Amarillo District | HOT MIX, IH0027 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 2 of 2 | $676,375 | +8.0% |
| 03 JUN 2026 | A00076951 | Childress District | Highway Improvement, SH 70 (8 Miles North of US 82, South to US 82) | 2 of 6 | $4,088,032 | +2.0% |
| 02 JUN 2026 | A00200068 | Childress District | Bridge Replacement, SH 70 (@ Quitaque River to .) | 8 of 9 | $5,374,971 | +58% |
| 07 MAY 2026 | A00183655 | Lubbock District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 179 (South of US 62 to LP 88 (FM 1585)) | 4 of 6 | $12,730,908 | +32% |
| 06 MAY 2026 | A00219763 | Amarillo District | MILL AND INLAY, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 1 of 1 | $6,531,750 | Low |
| 07 APR 2026 | A00209966 | Amarillo District | Preventive Maintenance, RM 1061 (COULTER ST to BI 40-D) | 5 of 6 | $8,892,413 | +19% |
| 05 FEB 2026 | A00077453 | Childress District | Highway Improvement, SH 6 (882' South of US 70, South to Knox C/L) | 7 of 7 | $8,772,061 | +29% |
| 04 FEB 2026 | A00188551 | Amarillo District | Bridge Replacement, IRWIN RD (IRWIN RD @ EAST AMARILLO CREEK to .) | 5 of 7 | $2,769,350 | +39% |
| 07 JAN 2026 | A00208588 | Childress District | Widen Road - Add Shoulders, FM 104 (US 70, North to 10 Miles) | 4 of 8 | $6,993,552 | +11% |
| 06 JAN 2026 | A00190019 | Childress District | Highway Improvement, US 83 (FM 1038, South to King C/L) | 8 of 9 | $56,600,784 | +22% |
| 02 DEC 2025 | A00214744 | Lubbock District | ROADWAY WIDENING, FM0145 (Intersection of FM145 & SH194 (Hart) to Castro/Swisher County Line) | 2 of 5 | $2,377,155 | +4.0% |
| 02 DEC 2025 | A00206578 | Amarillo District | Hazard Elimination & Safety, US 385 (US 87 to SH 354 IN CHANNING) | 1 of 6 | $15,925,814 | Low, 11% under the second |
| 06 NOV 2025 | A00203773 | Childress District | Highway Improvement, US 287 (Hall C/L, East to 2100' West of FM 164) | 5 of 8 | $5,724,844 | +10% |
| 05 NOV 2025 | A00133631 | Childress District | Install/Upgrade Drainage Structure(S), FM 3257 (1.44 Miles North of US 287, North to 1.88 Miles North of US 287) | 3 of 6 | $1,955,763 | +10% |
| 05 SEP 2025 | A00127834 | Amarillo District | Highway Improvement, SH 207 (SH 15 IN SPEARMAN to HUTCHINSON COUNTY LINE) | 2 of 5 | $12,947,164 | +4.0% |
| 07 AUG 2025 | A00216392 | Amarillo District | FLEXIBLE BASE, IH0027 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS) | 4 of 4 | $2,182,010 | +27% |
| 23 JUL 2025 | A00216181 | Amarillo District | HOT MIX, IH0027 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS) | 2 of 2 | $658,500 | +5.0% |
| 01 JUL 2025 | A00183588 | Childress District | Bridge Replacement, FM 94 (@ Draw to .) | 7 of 7 | $3,386,966 | +84% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.