TxDOT contract A00076951 bid tabulation
Highway Improvement, SH 70 (8 Miles North of US 82, South to US 82). Let by Texas DOT on June 3, 2026, Dickens, Childress District. 6 bids received; low bid $4,016,029 by A. L. Helmcamp, Inc., +7.6% against the engineer's estimate of $3,732,460.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 41
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. L. Helmcamp, Inc. | $4,016,029 | Low | +8.0% |
| 2 | J. Lee Milligan, Inc. | $4,088,032 | +2.0% | +10% |
| 3 | Zack Burkett Co. | $4,187,184 | +4.0% | +12% |
| 4 | Duininck, Inc. | $4,431,424 | +10% | +19% |
| 5 | Overland Corporation | $4,690,151 | +17% | +26% |
| 6 | Gilvin-Terrill, LTD. | $4,970,395 | +24% | +33% |
Engineer's estimate: $3,732,460.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. L. Helmcamp, Inc. | 2. J. Lee Milligan, Inc. | 3. Zack Burkett Co. | 4. Duininck, Inc. | 5. Overland Corporation | 6. Gilvin-Terrill, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type B) (132-7003) | CY | 72 | $29.05 | $100.00 | $75.00 | $50.00 | $160.00 | $165.00 | $100.00 |
| 2 | Backfill (type A) (134-7001) | STA | 356 | $170.00 | $145.00 | $310.00 | $290.00 | $300.00 | $210.00 | $300.00 |
| 3 | Drill seed (permanent_rural_sand) (164-7041) | ACRE | 17 | $2,400.00 | $660.00 | $695.00 | $769.93 | $660.00 | $565.00 | $700.00 |
| 4 | Vegetative watering (168-7001) | TGL | 1,335 | $20.88 | $10.00 | $30.00 | $33.00 | $29.00 | $2.50 | $20.00 |
| 5 | Emuls asphalt (erosion control)(SS-1H) (314-7009) | GAL | 15,857 | $4.78 | $3.90 | $4.00 | $3.50 | $3.75 | $4.00 | $5.00 |
| 6 | D-GR HMA type D sac-A PG70-28 (341-7053) | TON | 20,174 | $115.00 | $154.00 | $136.40 | $156.70 | $162.50 | $174.60 | $185.00 |
| 7 | Tack coat (341-7082) | GAL | 18,339 | $5.20 | $3.90 | $5.00 | $5.30 | $2.50 | $4.55 | $5.00 |
| 8 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 4,356 | $5.45 | $3.25 | $6.00 | $4.50 | $7.40 | $5.50 | $10.00 |
| 9 | Riprap (mow strip)(4 in) (432-7013) | CY | 105 | $797.50 | $660.00 | $670.00 | $743.75 | $635.00 | $702.00 | $800.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $370,002 | $280,000 | $439,000 | $250,000 | $400,000 | $463,340 | $450,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $6,875.00 | $8,700.00 | $35,000 | $5,164.60 | $24,000 | $22,900 | $10,000 |
| 12 | TMA (stationary) (505-7001) | DAY | 65 | $250.00 | $200.00 | $375.00 | $250.00 | $200.00 | $100.00 | $400.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 4 | $300.00 | $150.00 | $895.00 | $0.01 | $1,000.00 | $100.00 | $400.00 |
| 14 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 2,820 | $8.30 | $5.00 | $8.50 | $5.65 | $4.85 | $8.00 | $4.75 |
| 15 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 68,576 | $0.18 | $0.29 | $0.30 | $0.27 | $0.24 | $0.17 | $0.29 |
| 16 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 34,288 | $0.19 | $0.29 | $0.30 | $0.30 | $0.24 | $0.17 | $0.29 |
| 17 | Metal W-beam guard fence (steel post) (540-7002) | LF | 750 | $36.50 | $35.00 | $36.00 | $39.27 | $33.50 | $33.00 | $33.00 |
| 18 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $3,100.00 | $3,200.00 | $3,200.00 | $3,570.00 | $3,100.00 | $3,000.00 | $2,400.00 |
| 19 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 150 | $88.00 | $80.00 | $85.00 | $89.25 | $76.50 | $75.00 | $88.00 |
| 20 | Metal beam guard fence (long span system) (540-7027) | EACH | 6 | $1,075.00 | $1,500.00 | $1,525.00 | $1,695.75 | $1,500.00 | $1,425.00 | $1,400.00 |
| 21 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 4 | $582.50 | $740.00 | $750.00 | $833.00 | $715.00 | $700.00 | $675.00 |
| 22 | Remove metal beam guard fence (542-7001) | LF | 800 | $5.00 | $2.00 | $2.15 | $2.38 | $2.05 | $2.00 | $3.00 |
| 23 | Guardrail end treatment (install) (544-7001) | EACH | 24 | $3,600.00 | $3,400.00 | $3,425.00 | $3,808.00 | $3,300.00 | $3,200.00 | $3,300.00 |
| 24 | Guardrail end treatment (remove) (544-7003) | EACH | 24 | $250.00 | $220.00 | $215.00 | $238.00 | $205.00 | $200.00 | $300.00 |
| 25 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 40 | $47.50 | $32.00 | $32.20 | $35.70 | $30.50 | $30.00 | $31.00 |
| 26 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 196 | $1.50 | $0.80 | $1.45 | $1.45 | $1.55 | $1.10 | $1.00 |
| 27 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,431 | $1.25 | $0.80 | $1.50 | $1.45 | $1.55 | $1.10 | $1.00 |
| 28 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 100 | $1.27 | $2.10 | $1.10 | $1.19 | $2.05 | $2.00 | $2.00 |
| 29 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 130 | $1.58 | $2.10 | $1.10 | $1.19 | $2.05 | $2.00 | $2.00 |
| 30 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 24 | $11.00 | $12.00 | $17.15 | $19.04 | $11.00 | $11.00 | $11.00 |
| 31 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $175.00 | $185.00 | $250.00 | $273.70 | $180.00 | $175.00 | $175.00 |
| 32 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $225.00 | $190.00 | $350.00 | $386.75 | $185.00 | $180.00 | $180.00 |
| 33 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 12 | $35.50 | $110.00 | $53.50 | $59.50 | $100.00 | $100.00 | $100.00 |
| 34 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 4 | $53.48 | $110.00 | $64.25 | $71.40 | $100.00 | $100.00 | $100.00 |
| 35 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 72,313 | $3.00 | $0.55 | $0.65 | $0.71 | $0.52 | $0.51 | $0.51 |
| 36 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 5,878 | $3.00 | $0.55 | $0.65 | $0.71 | $0.53 | $0.52 | $0.52 |
| 37 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 43,930 | $3.00 | $0.55 | $0.65 | $0.71 | $0.52 | $0.51 | $0.51 |
| 38 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 80 | $18.00 | $16.00 | $16.10 | $17.85 | $15.50 | $15.00 | $15.00 |
| 39 | Reflectorized pavement marker type I-C (672-7002) | EACH | 6 | $5.86 | $5.30 | $10.71 | $11.90 | $5.10 | $5.00 | $5.00 |
| 40 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,538 | $6.00 | $4.20 | $5.25 | $5.83 | $3.95 | $3.90 | $3.90 |
| 41 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 80 | $4.00 | $25.00 | $21.40 | $23.80 | $4.05 | $4.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.