TxDOT contract A00203773 bid tabulation
Highway Improvement, US 287 (Hall C/L, East to 2100' West of FM 164). Let by Texas DOT on November 6, 2025, Childress, Childress District. 8 bids received; low bid $5,183,756 by RK Hall, LLC, -26% against the engineer's estimate of $6,986,326.
- Owner
- Texas DOT
- Letting
- 06 NOV 2025
- Pay items
- 52
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | RK Hall, LLC | $5,183,756 | Low | -26% |
| 2 | Zack Burkett Co. | $5,516,668 | +6.0% | -21% |
| 3 | Overland Corporation | $5,564,391 | +7.0% | -20% |
| 4 | Duininck, Inc. | $5,664,486 | +9.0% | -19% |
| 5 | J. Lee Milligan, Inc. | $5,724,844 | +10% | -18% |
| 6 | A. L. Helmcamp, Inc. | $5,941,987 | +15% | -15% |
| 7 | Gilvin-Terrill, LTD. | $6,354,177 | +23% | -9.0% |
| 8 | Kiewit Infrastructure South Co. | $7,548,471 | +46% | +8.0% |
Engineer's estimate: $6,986,326.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. RK Hall, LLC | 2. Zack Burkett Co. | 3. Overland Corporation | 4. Duininck, Inc. | 5. J. Lee Milligan, Inc. | 6. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 292 | $10.00 | $20.00 | $11.48 | $25.00 | $15.50 | $19.00 | $35.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 12 | $31.00 | $100.00 | $50.00 | $1,000.00 | $105.00 | $255.00 | $460.00 |
| 3 | Backfill (type A or B) (134-7004) | STA | 489 | $237.00 | $200.00 | $155.00 | $175.00 | $210.00 | $186.00 | $230.00 |
| 4 | Drill seed (permanent_rural_sand) (164-7041) | ACRE | 23 | $810.00 | $575.00 | $655.50 | $570.00 | $590.00 | $620.00 | $600.00 |
| 5 | Vegetative watering (168-7001) | TGL | 1,774 | $30.27 | $33.00 | $20.00 | $25.00 | $29.50 | $35.00 | $15.00 |
| 6 | Emuls asphalt (erosion control)(CSS-1H) (314-7011) | GAL | 21,804 | $4.80 | $4.30 | $5.10 | $3.50 | $3.55 | $3.75 | $4.50 |
| 7 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 22,603 | $184.50 | $141.47 | $126.10 | $146.00 | $151.20 | $134.00 | $160.10 |
| 8 | Tack coat (344-7077) | GAL | 21,060 | $6.00 | $4.80 | $4.60 | $4.25 | $2.30 | $4.90 | $5.00 |
| 9 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 3,378 | $9.61 | $5.84 | $9.19 | $8.25 | $8.20 | $6.80 | $3.00 |
| 10 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 7,600 | $7.27 | $5.21 | $9.19 | $6.25 | $5.35 | $5.50 | $3.50 |
| 11 | Planing asphalt concrete pavement(4") (354-7053) | SY | 2,031 | $9.57 | $15.41 | $9.19 | $22.50 | $13.50 | $19.65 | $3.60 |
| 12 | Riprap (mow strip)(4 in) (432-7013) | CY | 48.85 | $760.00 | $850.50 | $747.50 | $650.00 | $740.00 | $710.00 | $900.00 |
| 13 | Polyester polymer concrete overlay (2") (439-7017) | SY | 2,031 | $376.00 | $276.15 | $327.75 | $245.50 | $270.00 | $311.00 | $300.00 |
| 14 | Retrofit rail (type SSTR) (451-7024) | LF | 770 | $225.00 | $288.75 | $497.34 | $300.00 | $160.00 | $220.00 | $340.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $635,121 | $175,000 | $473,340 | $532,000 | $545,000 | $567,500 | $450,000 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $3,250.00 | $12,500 | $18,960 | $15,000 | $22,000 | $30,000 | $15,000 |
| 17 | Portable changeable message sign (503-7002) | EACH | 1 | $8,060.00 | $2,662.86 | $0.01 | $5,400.00 | $10,500 | $25,000 | $20,000 |
| 18 | TMA (stationary) (505-7001) | DAY | 60 | $247.43 | $523.83 | $275.00 | $360.00 | $260.00 | $475.00 | $250.00 |
| 19 | TMA (mobile operation) (505-7003) | DAY | 4 | $200.00 | $795.53 | $0.01 | $360.00 | $930.00 | $980.00 | $600.00 |
| 20 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 3,060 | $11.50 | $4.99 | $5.46 | $4.75 | $4.90 | $8.00 | $5.00 |
| 21 | Biodegradable erosion control logs (remove) (506-7046) | LF | 3,060 | $1.25 | $1.05 | $1.15 | $1.00 | $1.05 | $2.75 | $1.00 |
| 22 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 1,300 | $39.50 | $54.00 | $64.40 | $56.00 | $58.00 | $109.00 | $50.00 |
| 23 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 3,900 | $23.20 | $8.00 | $11.50 | $10.00 | $10.50 | $13.00 | $15.00 |
| 24 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 1,300 | $38.40 | $17.00 | $28.75 | $25.00 | $26.00 | $23.00 | $20.00 |
| 25 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 77,130 | $0.18 | $0.13 | $0.28 | $0.12 | $0.25 | $0.30 | $0.22 |
| 26 | Metal W-beam guard fence (steel post) (540-7002) | LF | 675 | $40.00 | $29.40 | $40.25 | $35.00 | $36.00 | $38.20 | $30.00 |
| 27 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $3,222.50 | $2,530.37 | $3,220.00 | $2,800.00 | $2,900.00 | $3,055.00 | $2,900.00 |
| 28 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,980.00 | $1,443.75 | $1,725.00 | $1,500.00 | $1,500.00 | $1,640.00 | $1,600.00 |
| 29 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 8 | $582.50 | $1,155.00 | $1,150.00 | $1,000.00 | $1,000.00 | $1,100.00 | $950.00 |
| 30 | Remove metal beam guard fence (542-7001) | LF | 1,425 | $4.30 | $3.15 | $3.45 | $3.00 | $3.10 | $3.30 | $3.00 |
| 31 | Remove terminal anchor section (542-7002) | EACH | 4 | $430.00 | $367.50 | $345.00 | $300.00 | $310.00 | $325.00 | $300.00 |
| 32 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $4,035.00 | $3,360.00 | $4,025.00 | $3,500.00 | $3,600.00 | $3,800.00 | $3,500.00 |
| 33 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $330.00 | $367.50 | $345.00 | $300.00 | $310.00 | $325.00 | $300.00 |
| 34 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 3 | $2,858.44 | $3,937.50 | $2,300.00 | $2,000.00 | $2,100.00 | $2,200.00 | $800.00 |
| 35 | Crash cushion attenuator (remove) (545-7004) | EACH | 1 | $1,500.00 | $1,260.00 | $1,725.00 | $1,500.00 | $1,500.00 | $1,640.00 | $600.00 |
| 36 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 1 | $11,000 | $10,763 | $11,500 | $10,000 | $10,500 | $11,000 | $6,500.00 |
| 37 | Replace existing aluminum signs(type A) (636-7004) | SF | 258.25 | $55.00 | $42.00 | $40.25 | $35.00 | $46.50 | $38.25 | $50.00 |
| 38 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $33.00 | $35.70 | $34.50 | $30.00 | $31.00 | $32.75 | $16.00 |
| 39 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 9 | $52.50 | $48.30 | $40.25 | $35.00 | $36.00 | $38.25 | $26.00 |
| 40 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 6 | $24.75 | $35.70 | $34.50 | $30.00 | $31.00 | $32.75 | $16.00 |
| 41 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037) | EACH | 9 | $17.90 | $48.30 | $40.25 | $35.00 | $36.00 | $38.25 | $26.00 |
| 42 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,653 | $2.90 | $2.11 | $1.40 | $1.64 | $1.55 | $1.45 | $1.50 |
| 43 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 4,805 | $1.40 | $1.00 | $1.15 | $0.80 | $0.83 | $1.10 | $0.84 |
| 44 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 192 | $66.95 | $44.36 | $46.00 | $24.00 | $25.00 | $43.65 | $25.00 |
| 45 | Reflectorized pavement marking type II (W) 4" (solid) (666-7171) | LF | 5,600 | $1.93 | $0.53 | $1.90 | $0.33 | $0.34 | $1.80 | $0.35 |
| 46 | Reflectorized pavement marking type II (Y) 4" (solid) (666-7210) | LF | 2,800 | $1.56 | $0.53 | $1.90 | $0.33 | $0.34 | $1.80 | $0.35 |
| 47 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 48,700 | $0.83 | $0.67 | $0.77 | $0.53 | $0.55 | $0.75 | $0.56 |
| 48 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 48,700 | $2.02 | $0.67 | $0.77 | $0.53 | $0.55 | $0.75 | $0.56 |
| 49 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 48,700 | $1.05 | $0.67 | $0.77 | $0.53 | $0.55 | $0.75 | $0.56 |
| 50 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 850 | $13.75 | $5.51 | $6.90 | $3.65 | $3.75 | $6.55 | $4.00 |
| 51 | Eliminating existing PM & markers (4") (677-7001) | LF | 8,400 | $1.20 | $0.63 | $1.32 | $1.00 | $1.05 | $1.25 | $1.00 |
| 52 | Eliminating existing PM & markers (6") (677-7002) | LF | 2,800 | $0.77 | $0.79 | $1.32 | $1.00 | $1.05 | $1.25 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.