TxDOT letting results, November 6, 2025
36 contracts let by Texas DOT on November 6, 2025, $232,639,220 in low bids, a median of 5 bidders per contract. On the 36 with an engineer's estimate, the low bid came in under it 33 times; median low bid -19% against the estimate.
- Owner
- Texas DOT
- Contracts
- 36
- Low bids, total
- $232,639,220
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00062085 | Construct Bridge, SL 360 (AT COURTYARD DRIVE to .) | Austin District | 8 | Webber, LLC | $68,389,116 | $68,761,807 | +1.0% | -1.0% | TxDOT |
| A00187840 | Widen Road - Add Lanes And Shoulders, SH 115 (FM 874 to 3 MI S ANDREWS C/L) | Odessa District | 1 of 6 | Jones Bros. Dirt & Paving Contractors, Inc. | $28,204,481 | -21% | TxDOT | ||
| A00208898 | Seal Coat, US 87 (NEW MEXICO STATE LINE to 3.6 MILES N OF FM 3110) | Amarillo District | 1 | Missouri Petroleum Products Company LLC | $17,475,909 | -9.0% | TxDOT | ||
| A00197443 | Seal Coat, FM 3363 (IH 20 FRONTAGE ROAD E. to IH 20 FRONTAGE ROAD) | Brownwood District | 4 | Northeastern Pavers, LLC | $12,031,352 | $12,886,763 | +7.0% | -23% | TxDOT |
| A00059355 | Highway Improvement, SH 19 (US 80, S to IH 20, IN CANTON) | Tyler District | 8 of 9 | Big Creek Construction, LTD. | $11,187,838 | $11,747,064 | +5.0% | -25% | TxDOT |
| A00060109 | Install Raised Median, FM 1938 (FM 1709 to STARNES RD) | Fort Worth District | 9 | Ragle Construction, Inc. | $9,907,252 | $10,302,389 | +4.0% | -13% | TxDOT |
| A00213506 | Seal Coat, SL 11 (0.3 mi N of BU 287 J to BU 287 J (frontage roads only)) | Wichita Falls District | 4 | Ronald R. Wagner & Co., LP | $9,871,512 | $10,023,079 | +2.0% | -15% | TxDOT |
| A00200365 | Resurface Roadway, SH 7 (FM 2713 to San Augustine C/L) | Lufkin District | 4 | Clark Construction of Texas, Inc. | $9,316,843 | $9,577,819 | +3.0% | -11% | TxDOT |
| A00194003 | Rehabilitate Existing Roadway, FM 1827 (FM 75 to FM 545) | Dallas District | 5 | D. L. Lennon Incorporated - Contractor | $8,652,246 | $9,657,531 | +12% | -29% | TxDOT |
| A00066969 | Rehabilitate Existing Roadway, FM 1777 (FM 6 to CR 677) | Dallas District | 5 | D. L. Lennon Incorporated - Contractor | $6,601,558 | $8,194,616 | +24% | -33% | TxDOT |
| A00203773 | Highway Improvement, US 287 (Hall C/L, East to 2100' West of FM 164) | Childress District | 8 | RK Hall, LLC | $5,183,756 | $5,516,668 | +6.0% | -26% | TxDOT |
| A00196627 | Surfacing/Roadway Restoration, US 90 (TRINITY RIVER BRIDGE, EAST to 0.08 MILES EAST OF SH 146 N.) | Beaumont District | 4 | Cornerstone Paving and Construction, L.L.C. | $4,088,177 | $4,088,457 | 0.0% | -36% | TxDOT |
| A00060555 | Surfacing/Roadway Restoration, FM 2204 (US 259 (KILGORE BYPASS), E to FM 2011) | Tyler District | 5 | Madden Contracting Company, LLC. | $3,494,062 | $3,511,213 | 0.0% | -12% | TxDOT |
| A00184978 | Bridge Replacement, CLARK SCHOOL (SPRING CREEK to STR# B001-40-002&B001-40-001 BRIGGS BLVD) | Yoakum District | 9 | Presidio Contracting, LLC | $2,877,575 | $2,898,669 | +1.0% | -22% | TxDOT |
| A00217935 | THERMOPLASTIC PAVEMENT MARKINGS, SH0006 (Various to Various) | Bryan District | 7 | Stripe Lines, Inc. | $2,845,805 | $2,957,325 | +4.0% | -40% | TxDOT |
| A00217009 | TRAFFIC CONTROL SERVICES, SH0006 (FOR VARIOUS MAINTENANCE SECTIONS to ACROSS THE WACO DISTRICT) | Waco District | 2 | Awp Safety | $2,726,105 | $2,874,300 | +5.0% | -7.0% | TxDOT |
| A00193385 | Traffic Signal Improvements, SH 342 (at SL 12 (Ledbetter) to in the City of Dallas) | Dallas District | 8 | Elecnor Belco Electric, Inc. | $2,607,221 | $3,493,240 | +34% | -37% | TxDOT |
| A00214360 | Landscape Development, IH 69 (Chimney Rock Road to Newcastle Drive) | Houston District | 5 | Green Sage Services LLC | $2,411,103 | $2,428,607 | +1.0% | -4.0% | TxDOT |
| A00216803 | LANDSCAPE MAINTENANCE, SH0288 (SH 288 to SH 288) | Houston District | 4 | Apex Landscape & Irrigation, LLC | $2,238,142 | $2,446,748 | +9.0% | -24% | TxDOT |
| A00206360 | Construct Pedestrian Infrastructure, FM 436 (Lamar St to SH 95) | Waco District | 7 | Garret Shields Infrastructure | $2,132,111 | $2,149,742 | +1.0% | -19% | TxDOT |
| A00215111 | AGGREGATE, FM0535 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 2 | Touchstone Resources, LLC | $2,088,750 | $2,753,750 | +32% | -3.0% | TxDOT |
| A00192965 | Intersection Improvements With Right And/Or Left Turn Lanes, SH 21 (0.14 Mi E of IH 45 to 1.17 Mi E of IH 45) | Bryan District | 8 | Big Creek Construction, LTD. | $2,014,433 | $2,378,582 | +18% | -15% | TxDOT |
| A00196905 | Preventive Maintenance, Various (Various to Various) | Paris District | 5 | Stripe-A-Zone, LLC | $1,997,710 | $2,181,933 | +9.0% | -42% | TxDOT |
| A00193148 | Hazard Elimination & Safety, RM 3237 (0.305 MI W of Lone Man Mountain Rd to 0.379 MI E of Lone Man Mountain Rd) | Austin District | 7 | Dean Word Company, LTD. | $1,989,311 | $2,153,984 | +8.0% | -37% | TxDOT |
| A00216051 | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | Odessa District | 4 | Ragle Construction, Inc. | $1,760,245 | $1,808,049 | +3.0% | +11% | TxDOT |
| A00216896 | VEGETATION MANAGEMENT, US0081 (Various Locations In to Wise, Jack, Parker, and Palo Pinto) | Fort Worth District | 7 | Central North Construction, LLC | $1,748,008 | $1,823,041 | +4.0% | +1.0% | TxDOT |
| A00036755 | Bridge Replacement, COUNTY ROAD 309 (AT CLEAR FORK BRAZOS RIVER to .) | Abilene District | 8 | Coppell Construction Co., Inc. | $1,728,544 | $1,872,743 | +8.0% | -24% | TxDOT |
| A00218031 | DE-ICING SALT, IH0020 (West TxDOT Region to West TxDOT Region) | Maintenance Division District | 2 | NSG Logistics, LLC | $1,377,945 | $1,597,263 | +16% | -1.0% | TxDOT |
| A00217818 | PAVEMENT MARKINGS, IH0410 (VARIOUS LOCATIONS to DISTRICTWIDE) | San Antonio District | 3 | TRP Infrastructure Services, LLC | $1,296,560 | $1,407,500 | +9.0% | -35% | TxDOT |
| A00216895 | VEGETATION MANAGEMENT, US0067 (Various Locations In to Erath, Hood, Somervell, and Johnson) | Fort Worth District | 7 | Central North Construction, LLC | $1,187,971 | $1,210,424 | +2.0% | +1.0% | TxDOT |
| A00208022 | Install/Rehabilitate Its, Various (Various location in to the Lubbock District) | Lubbock District | 4 | Elecnor Belco Electric, Inc. | $1,007,926 | $1,319,636 | +31% | -10% | TxDOT |
| A00134792 | Rehabilitate Bridge, COUNTY ROAD 213 (CR 213 AT MIXON CREEK #1 to STR# AA04-37-001) | Yoakum District | 4 | Cekra Inc. | $747,400 | $1,052,536 | +41% | -10% | TxDOT |
| A00216856 | MISCELLANEOUS CONCRETE REPAIR, IH0020 (Various Locations In to Fort Worth District) | Fort Worth District | 3 | Nortex Concrete Lift & Stabilization, Inc. | $727,450 | $993,200 | +37% | -27% | TxDOT |
| A00210040 | Preventive Maintenance, Various (Various Locations in Lee, Bastrop, & to Caldwell Counties.) | Austin District | 6 | D. I. J. Construction, Inc. | $546,003 | $593,725 | +9.0% | -31% | TxDOT |
| A00217918 | Total Maintenance, SH0016 (30.06477492 to -99.1212750) | Maintenance Division District | 4 | Texway Wastewater Services, LLC | $150,000 | $203,920 | +36% | -19% | TxDOT |
| A00217003 | WIM Parts, IH0035 (STATEWIDE to STATEWIDE) | Maintenance Division District | 1 | International Road Dynamics Corporation | $28,800 | -7.0% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.