TxDOT contract A00059355 bid tabulation
Highway Improvement, SH 19 (US 80, S to IH 20, IN CANTON). Let by Texas DOT on November 6, 2025, Van Zandt, Tyler District. 9 bids received; low bid $11,187,838 by Big Creek Construction, LTD., -25% against the engineer's estimate of $14,999,624.
- Owner
- Texas DOT
- Letting
- 06 NOV 2025
- Pay items
- 133
- Data through
- 19 NOV 2026
8 of the 9 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $11,187,838 | Low | -25% |
| 2 | Baker & Company Construction, LLC | $11,747,064 | +5.0% | -22% |
| 3 | A. L. Helmcamp, Inc. | $12,759,024 | +14% | -15% |
| 4 | East Texas Bridge, Inc. | $12,879,798 | +15% | -14% |
| 6 | Reynolds & Kay, LTD. | $13,302,016 | +19% | -11% |
| 7 | Texas Materials Group, Inc. | $14,086,787 | +26% | -6.0% |
| 8 | Grey Sky Construction LLC | $15,539,298 | +39% | +4.0% |
| 9 | True Roads Construction, LLC | $16,288,371 | +46% | +9.0% |
Engineer's estimate: $14,999,624.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Baker & Company Construction, LLC | 3. A. L. Helmcamp, Inc. | 4. East Texas Bridge, Inc. | 5. Reynolds & Kay, LTD. | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 395.90 | $2,000.00 | $1,500.00 | $930.00 | $1,082.00 | $2,200.00 | $1,315.00 | $1,400.00 |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 3,557 | $12.00 | $15.00 | $15.00 | $15.00 | $9.00 | $9.00 | $16.41 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 891 | $25.00 | $25.00 | $28.00 | $35.00 | $18.00 | $20.00 | $27.00 |
| 4 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 12,574 | $12.00 | $8.00 | $8.30 | $7.00 | $11.00 | $13.00 | $10.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 25,152 | $15.00 | $17.00 | $4.80 | $30.00 | $14.00 | $15.00 | $18.00 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 9,579 | $25.00 | $17.00 | $23.50 | $11.00 | $17.00 | $12.00 | $30.00 |
| 7 | Backfill (type A) (134-7001) | STA | 395.90 | $300.00 | $250.00 | $179.00 | $200.00 | $315.00 | $200.00 | $300.00 |
| 8 | Furn & place topsoil (4") (160-7002) | SY | 126,919 | $3.00 | $0.75 | $0.50 | $0.75 | $2.35 | $3.20 | $3.25 |
| 9 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 63,463 | $0.21 | $0.16 | $0.15 | $0.15 | $0.16 | $0.25 | $0.14 |
| 10 | Bonded fiber MTRX seed (temporary)(warm) (164-7074) | SY | 63,463 | $0.58 | $0.55 | $0.70 | $0.58 | $0.60 | $0.62 | $0.52 |
| 11 | Bonded fiber MTRX seed (temporary)(cool) (164-7075) | SY | 63,463 | $0.58 | $0.55 | $0.70 | $0.56 | $0.58 | $0.62 | $0.52 |
| 12 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 126,919 | $0.58 | $0.55 | $0.80 | $0.57 | $0.60 | $0.63 | $0.55 |
| 13 | Vegetative watering (168-7001) | TGL | 1,397 | $15.00 | $15.00 | $10.00 | $15.00 | $8.00 | $15.00 | $41.00 |
| 14 | FL BS (compacted in place)(type A GR 1-2) (12") (247-7113) | SY | 19,692 | $50.00 | $35.00 | $35.00 | $44.00 | $40.00 | $43.00 | $41.00 |
| 15 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 223.31 | $300.00 | $325.00 | $330.00 | $315.00 | $365.00 | $360.00 | $296.21 |
| 16 | Lime TRT (existing material)(8") (260-7007) | SY | 12,406 | $4.50 | $5.00 | $4.90 | $5.00 | $5.00 | $8.00 | $7.51 |
| 17 | Cement (275-7001) | TON | 223.31 | $300.00 | $250.00 | $300.00 | $222.00 | $255.00 | $245.00 | $244.14 |
| 18 | Cement TRT (existing material)(8") (275-7003) | SY | 12,406 | $4.50 | $5.00 | $8.30 | $5.00 | $4.00 | $5.75 | $4.63 |
| 19 | Emuls asphalt (erosion control)(CSS-1) (314-7010) | GAL | 2,105 | $8.00 | $5.00 | $7.00 | $9.00 | $3.75 | $4.00 | $9.75 |
| 20 | Asphalt (AC-20XP, AC-10-2TR, or AC-20-5TR) (316-7068) | GAL | 87,545 | $5.00 | $3.75 | $8.75 | $4.00 | $4.75 | $4.15 | $3.50 |
| 21 | Aggregate (type-PD, GR-4)(sac-A) (316-7148) | CY | 2,084 | $180.00 | $180.00 | $208.00 | $190.00 | $195.00 | $180.00 | $155.00 |
| 22 | SP mixes SP-B PG64-22 (344-7001) | TON | 1,862 | $160.00 | $150.00 | $142.00 | $187.00 | $165.00 | $148.00 | $145.00 |
| 23 | SP mixes SP-C PG70-22 (344-7019) | TON | 17,169 | $165.00 | $125.00 | $147.50 | $150.00 | $162.00 | $158.00 | $150.00 |
| 24 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 7,323 | $165.00 | $130.00 | $148.50 | $160.00 | $165.00 | $150.00 | $155.00 |
| 25 | Tack coat (344-7077) | GAL | 23,364 | $5.00 | $3.50 | $3.70 | $5.50 | $5.00 | $1.90 | $4.45 |
| 26 | Flexible pavement structure repair(6") (351-7005) | SY | 1,200 | $72.00 | $70.00 | $84.00 | $90.00 | $70.00 | $70.00 | $75.00 |
| 27 | Flexible pavement structure repair(8") (351-7007) | SY | 3,500 | $100.00 | $90.00 | $92.00 | $100.00 | $95.00 | $83.00 | $93.00 |
| 28 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 175,342 | $3.60 | $2.00 | $1.80 | $2.30 | $2.45 | $4.65 | $2.30 |
| 29 | Cut & restore asphalt paving (400-7008) | SY | 38 | $150.00 | $200.00 | $204.00 | $310.00 | $125.00 | $525.00 | $270.00 |
| 30 | Flowable backfill (401-7001) | CY | 10 | $400.00 | $350.00 | $520.00 | $370.00 | $300.00 | $350.00 | $420.00 |
| 31 | Trench excavation protection (402-7001) | LF | 257 | $10.00 | $25.00 | $80.00 | $10.00 | $8.00 | $5.00 | $1.10 |
| 32 | Temporary special shoring (403-7001) | SF | 332 | $40.00 | $50.00 | $6.70 | $49.00 | $70.00 | $80.00 | $105.00 |
| 33 | Riprap (mow strip)(4 in) (432-7013) | CY | 367 | $675.00 | $650.00 | $632.00 | $610.00 | $650.00 | $835.00 | $629.00 |
| 34 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 63 | $250.00 | $200.00 | $206.00 | $250.00 | $200.00 | $200.00 | $275.00 |
| 35 | Riprap (stone protection)(24 in) (432-7045) | CY | 451.11 | $250.00 | $175.00 | $143.00 | $300.00 | $205.00 | $210.00 | $245.00 |
| 36 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 184 | $55.00 | $65.00 | $176.00 | $55.00 | $75.00 | $70.00 | $175.00 |
| 37 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 20 | $55.00 | $65.00 | $193.00 | $53.00 | $82.00 | $75.00 | $190.00 |
| 38 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 70 | $410.00 | $350.00 | $525.00 | $370.00 | $285.00 | $400.00 | $380.00 |
| 39 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 8 | $1,000.00 | $650.00 | $440.00 | $430.00 | $800.00 | $1,600.00 | $435.00 |
| 40 | Concrete box culvert (3 FT X 3 FT)(extend) (462-7057) | LF | 23 | $1,000.00 | $500.00 | $495.00 | $480.00 | $800.00 | $1,200.00 | $490.00 |
| 41 | Concrete box culvert (4 FT X 3 FT)(extend) (462-7059) | LF | 16 | $1,100.00 | $600.00 | $550.00 | $530.00 | $1,000.00 | $1,300.00 | $545.00 |
| 42 | Concrete box culvert (4 FT X 4 FT)(extend) (462-7060) | LF | 14 | $1,100.00 | $700.00 | $605.00 | $580.00 | $1,000.00 | $1,050.00 | $600.00 |
| 43 | Concrete box culvert (6 FT X 6 FT)(extend) (462-7069) | LF | 12 | $1,200.00 | $1,000.00 | $850.00 | $820.00 | $1,000.00 | $1,300.00 | $845.00 |
| 44 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,323 | $65.00 | $60.00 | $57.00 | $58.00 | $57.00 | $61.00 | $60.00 |
| 45 | RC pipe (CL III)(24 in) (464-7005) | LF | 8 | $110.00 | $100.00 | $167.00 | $79.00 | $85.00 | $250.00 | $80.00 |
| 46 | RC pipe (CL III)(30 in) (464-7007) | LF | 36 | $120.00 | $125.00 | $125.00 | $120.00 | $125.00 | $200.00 | $125.00 |
| 47 | RC pipe (CL III)(36 in) (464-7009) | LF | 70 | $135.00 | $150.00 | $156.00 | $140.00 | $165.00 | $210.00 | $145.00 |
| 48 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 4 | $15,000 | $7,000.00 | $7,150.00 | $6,900.00 | $9,000.00 | $9,000.00 | $7,110.00 |
| 49 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 1 | $18,000 | $8,000.00 | $8,525.00 | $8,200.00 | $12,000 | $12,000 | $8,475.00 |
| 50 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 2 | $15,000 | $9,000.00 | $8,250.00 | $7,900.00 | $8,000.00 | $12,000 | $8,200.00 |
| 51 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 4 | $17,500 | $10,000 | $8,800.00 | $8,500.00 | $11,000 | $13,000 | $8,750.00 |
| 52 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $25,000 | $13,000 | $14,025 | $14,000 | $12,000 | $16,000 | $13,800 |
| 53 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 1 | $30,000 | $14,000 | $14,273 | $14,000 | $17,000 | $19,000 | $14,000 |
| 54 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 2 | $37,500 | $20,000 | $21,450 | $21,000 | $26,000 | $27,000 | $21,300 |
| 55 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 1 | $45,000 | $22,000 | $23,925 | $23,000 | $30,000 | $30,000 | $23,750 |
| 56 | Wingwall (PW - 1) (HW=12 FT) (466-7182) | EACH | 1 | $57,500 | $30,000 | $31,405 | $30,000 | $45,000 | $45,000 | $31,200 |
| 57 | Wingwall (PW - 1) (HW=13 FT) (466-7183) | EACH | 1 | $65,000 | $35,000 | $38,225 | $37,000 | $55,000 | $52,000 | $38,000 |
| 58 | Set (type I)(S= 3 FT)(HW= 4 FT)(4:1)(C) (467-7045) | EACH | 3 | $12,000 | $10,000 | $10,450 | $10,000 | $11,000 | $15,000 | $10,000 |
| 59 | Set (type I)(S= 3 FT)(HW= 5 FT)(4:1)(C) (467-7049) | EACH | 1 | $15,000 | $12,500 | $13,750 | $13,000 | $17,000 | $24,000 | $13,600 |
| 60 | Set (type I)(S= 3 FT)(HW= 6 FT)(4:1)(C) (467-7053) | EACH | 1 | $18,500 | $16,000 | $16,800 | $16,000 | $18,500 | $29,000 | $16,650 |
| 61 | Set (type I)(S= 4 FT)(HW= 5 FT)(4:1)(C) (467-7076) | EACH | 2 | $16,000 | $12,500 | $13,600 | $13,000 | $18,000 | $24,000 | $13,535 |
| 62 | Set (type I)(S= 4 FT)(HW= 6 FT)(4:1)(C) (467-7080) | EACH | 1 | $20,000 | $17,000 | $18,125 | $18,000 | $22,000 | $31,000 | $18,000 |
| 63 | Set (type I)(S= 4 FT)(HW= 7 FT)(3:1)(C) (467-7083) | EACH | 2 | $25,000 | $18,000 | $19,085 | $19,000 | $26,000 | $35,500 | $18,750 |
| 64 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 112 | $850.00 | $1,000.00 | $860.00 | $1,100.00 | $925.00 | $1,225.00 | $1,060.00 |
| 65 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 2 | $1,500.00 | $1,275.00 | $1,725.00 | $1,400.00 | $1,150.00 | $1,800.00 | $1,350.00 |
| 66 | Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346) | EACH | 2 | $2,100.00 | $1,700.00 | $2,220.00 | $1,700.00 | $2,000.00 | $2,300.00 | $1,750.00 |
| 67 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 7 | $4,900.00 | $3,500.00 | $3,210.00 | $3,700.00 | $3,500.00 | $3,500.00 | $3,800.00 |
| 68 | Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378) | EACH | 4 | $5,000.00 | $7,000.00 | $5,830.00 | $7,400.00 | $6,600.00 | $7,400.00 | $7,600.00 |
| 69 | Clean existing culverts (480-7001) | EACH | 15 | $2,500.00 | $3,000.00 | $1,245.00 | $2,200.00 | $3,000.00 | $1,800.00 | $3,800.00 |
| 70 | Removing structure (box culvert) (496-7008) | LF | 69 | $250.00 | $65.00 | $55.00 | $450.00 | $75.00 | $160.00 | $135.00 |
| 71 | Removing structure (pipe) (496-7037) | EACH | 49 | $525.00 | $500.00 | $380.00 | $530.00 | $550.00 | $800.00 | $16.00 |
| 72 | Mobilization (500-7001) | LS | 1 | $1,334,149 | $956,000 | $390,000 | $950,000 | $500,000 | $1,000,000 | $1,408,007 |
| 73 | Barricades, signs and traffic handling (502-7001) | MO | 17 | $10,000 | $5,000.00 | $13,330 | $14,950 | $10,000 | $3,000.00 | $35,004 |
| 74 | Portable changeable message sign (503-7002) | EACH | 2 | $18,342 | $12,500 | $16,000 | $22,000 | $20,000 | $13,000 | $21,000 |
| 75 | TMA (stationary) (505-7001) | DAY | 275 | $250.00 | $100.00 | $290.00 | $250.00 | $350.00 | $150.00 | $1.00 |
| 76 | TMA (mobile operation) (505-7003) | DAY | 275 | $250.00 | $125.00 | $525.00 | $10.00 | $150.00 | $150.00 | $1.00 |
| 77 | Rock filter dams (install) (type 1) (506-7001) | LF | 620 | $38.00 | $35.00 | $45.00 | $36.00 | $38.00 | $42.00 | $50.00 |
| 78 | Rock filter dams (install) (type 2) (506-7002) | LF | 760 | $40.00 | $40.00 | $47.00 | $40.00 | $42.00 | $43.00 | $58.00 |
| 79 | Rock filter dams (remove) (506-7011) | LF | 1,380 | $11.00 | $10.00 | $13.50 | $11.00 | $10.00 | $20.00 | $18.00 |
| 80 | Earthwork (erosion & sediment control, in vehicle) (506-7029) | CY | 1,000 | $50.00 | $25.00 | $8.00 | $15.00 | $25.00 | $15.00 | $33.00 |
| 81 | Backhoe work (erosion & sediment control) (506-7030) | HR | 150 | $55.00 | $100.00 | $141.00 | $115.00 | $75.00 | $64.00 | $105.00 |
| 82 | Temporary sediment control fence (install) (506-7039) | LF | 2,235 | $4.00 | $5.00 | $3.30 | $4.00 | $4.30 | $4.75 | $5.80 |
| 83 | Temporary sediment control fence (remove) (506-7041) | LF | 2,235 | $1.00 | $1.00 | $1.10 | $0.60 | $0.55 | $0.65 | $1.00 |
| 84 | Trackhoe work (erosion & sediment control) (506-7051) | HR | 150 | $55.00 | $100.00 | $141.00 | $130.00 | $125.00 | $123.00 | $105.00 |
| 85 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 180 | $30.00 | $65.00 | $142.00 | $100.00 | $100.00 | $150.00 | $103.00 |
| 86 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 180 | $10.00 | $50.00 | $37.00 | $60.00 | $15.00 | $85.00 | $13.00 |
| 87 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 180 | $12.00 | $60.00 | $50.50 | $70.00 | $20.00 | $85.00 | $35.00 |
| 88 | Intersections (ACP) (530-7002) | SY | 1,577 | $70.00 | $50.00 | $70.00 | $60.00 | $40.00 | $65.00 | $90.00 |
| 89 | Driveways (concrete) (hes) (530-7007) | SY | 875 | $105.00 | $210.00 | $220.00 | $215.00 | $105.00 | $144.00 | $215.00 |
| 90 | Driveways (ACP) (530-7010) | SY | 8,095 | $60.00 | $30.00 | $48.00 | $45.00 | $48.00 | $45.00 | $88.00 |
| 91 | Turnouts (ACP) (530-7018) | SY | 457 | $105.00 | $50.00 | $127.00 | $72.00 | $48.00 | $80.00 | $88.00 |
| 92 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 57,490 | $0.30 | $0.25 | $0.21 | $0.18 | $0.30 | $0.20 | $0.31 |
| 93 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 39,592 | $0.34 | $0.25 | $0.21 | $0.18 | $0.30 | $0.20 | $0.33 |
| 94 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,725 | $35.00 | $30.00 | $26.00 | $31.00 | $27.00 | $28.00 | $31.00 |
| 95 | Remove metal beam guard fence (542-7001) | LF | 2,420 | $4.50 | $2.00 | $2.15 | $2.50 | $2.20 | $2.25 | $2.70 |
| 96 | Guardrail end treatment (install) (544-7001) | EACH | 36 | $3,400.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 | $3,300.00 | $3,225.00 |
| 97 | Guardrail end treatment (remove) (544-7003) | EACH | 22 | $375.00 | $250.00 | $214.00 | $260.00 | $220.00 | $230.00 | $270.00 |
| 98 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 4 | $1,300.00 | $2,500.00 | $2,675.00 | $1,000.00 | $1,650.00 | $1,100.00 | $1,575.00 |
| 99 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $1,000.00 | $1,000.00 | $860.00 | $1,000.00 | $550.00 | $400.00 | $1,126.00 |
| 100 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 4 | $15,000 | $8,500.00 | $9,100.00 | $9,000.00 | $9,100.00 | $8,000.00 | $7,820.00 |
| 101 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 9 | $750.00 | $600.00 | $535.00 | $580.00 | $785.00 | $700.00 | $545.00 |
| 102 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 49 | $320.00 | $250.00 | $295.00 | $250.00 | $375.00 | $250.00 | $300.00 |
| 103 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 7 | $425.00 | $275.00 | $320.00 | $280.00 | $425.00 | $300.00 | $328.00 |
| 104 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 63 | $820.00 | $800.00 | $860.00 | $790.00 | $950.00 | $875.00 | $875.00 |
| 105 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $985.00 | $800.00 | $965.00 | $790.00 | $1,100.00 | $1,050.00 | $985.00 |
| 106 | Remove SM RD SN sup&AM (644-7073) | EACH | 66 | $85.00 | $100.00 | $107.00 | $110.00 | $100.00 | $125.00 | $109.00 |
| 107 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 58 | $32.00 | $25.00 | $30.00 | $26.00 | $30.00 | $27.00 | $27.00 |
| 108 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 50 | $92.00 | $80.00 | $70.00 | $75.00 | $95.00 | $65.00 | $49.00 |
| 109 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 9,910 | $0.50 | $0.25 | $0.30 | $0.26 | $0.28 | $0.30 | $0.39 |
| 110 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 158,862 | $0.50 | $0.20 | $0.21 | $0.21 | $0.22 | $0.25 | $0.22 |
| 111 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 410 | $5.00 | $3.00 | $2.70 | $2.63 | $2.75 | $2.75 | $3.30 |
| 112 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 156,272 | $0.50 | $0.20 | $0.21 | $0.21 | $0.22 | $0.25 | $0.22 |
| 113 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,578 | $3.00 | $1.50 | $2.50 | $1.00 | $1.75 | $1.15 | $1.35 |
| 114 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,968 | $3.00 | $1.50 | $2.75 | $1.00 | $1.75 | $1.15 | $1.35 |
| 115 | Work zone pavement marking SHT terminal remove (W)(6") (662-7122) | LF | 4,733 | $2.00 | $1.00 | $2.65 | $0.70 | $2.35 | $1.50 | $1.09 |
| 116 | Work zone pavement marking SHT terminal remove (Y)(6") (662-7123) | LF | 35,161 | $2.50 | $1.00 | $2.00 | $0.70 | $2.35 | $1.50 | $1.20 |
| 117 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 205 | $7.00 | $8.00 | $8.00 | $8.00 | $8.25 | $8.50 | $8.50 |
| 118 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 6 | $52.55 | $100.00 | $107.00 | $105.00 | $110.00 | $114.00 | $80.00 |
| 119 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 4,955 | $1.00 | $0.31 | $0.35 | $0.32 | $0.33 | $0.35 | $0.27 |
| 120 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 680 | $1.50 | $1.00 | $1.10 | $1.05 | $1.10 | $1.15 | $1.05 |
| 121 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 79,431 | $0.85 | $0.25 | $0.25 | $0.23 | $0.24 | $0.25 | $0.27 |
| 122 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 75 | $0.80 | $1.00 | $1.10 | $1.05 | $1.10 | $1.15 | $1.07 |
| 123 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 1,620 | $1.00 | $0.31 | $0.35 | $0.32 | $0.33 | $0.35 | $0.27 |
| 124 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 77,861 | $0.85 | $0.25 | $0.25 | $0.23 | $0.24 | $0.25 | $0.27 |
| 125 | Prefabricated PM type B (W)(arrow) (668-7023) | EACH | 4 | $775.00 | $250.00 | $268.00 | $260.00 | $275.00 | $285.00 | $509.00 |
| 126 | Prefabricated PM type B (W)(LN RDCT arrow) (668-7029) | EACH | 4 | $1,200.00 | $350.00 | $375.00 | $370.00 | $385.00 | $400.00 | $1,071.00 |
| 127 | Reflectorized pavement marker type I-A (672-7001) | EACH | 64 | $5.00 | $5.50 | $5.50 | $5.25 | $5.50 | $5.50 | $4.00 |
| 128 | Reflectorized pavement marker type I-C (672-7002) | EACH | 268 | $6.50 | $5.50 | $5.50 | $5.25 | $5.50 | $5.50 | $4.00 |
| 129 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 993 | $6.80 | $5.50 | $5.50 | $5.25 | $5.50 | $5.50 | $4.00 |
| 130 | Full - width mowing (730-7019) | CYC | 4 | $5,000.00 | $5,000.00 | $4,000.00 | $5,000.00 | $8,000.00 | $4,500.00 | $4,500.00 |
| 131 | Litter removal (734-7002) | CYC | 6 | $3,000.00 | $3,500.00 | $2,385.00 | $4,000.00 | $5,000.00 | $1,100.00 | $3,000.00 |
| 132 | Driftwood removal (735-7060) | CY | 20 | $5,000.00 | $250.00 | $99.00 | $100.00 | $300.00 | $100.00 | $133.00 |
| 133 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 0 | $65.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.