True Roads Construction, LLC: TxDOT bid record
True Roads Construction, LLC submitted 43 bids on Texas DOT contracts in the data, from 07 MAR 2023 to 09 DEC 2025, and was the low bidder on 9 of them (21%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $26,880,950
- Latest bid
- 09 DEC 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 18 | 4 | 22% |
| 2024 | 5 | 1 | 20% |
| 2025 | 20 | 4 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 22 | 4 | 18% |
| Atlanta District | 11 | 3 | 27% |
| Lufkin District | 6 | 1 | 17% |
| Paris District | 2 | 1 | 50% |
| Dallas District | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 40 | 15 (38%) | $1.10 | $1.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 41 | 9 (22%) | $3,000.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 28 | 9 (32%) | $200.00 | $230.00 |
| Preparing row | 100-7002 | STA | 28 | 8 (29%) | $2,450.00 | $2,750.00 |
| Rail (type T223) | 450-7008 | LF | 11 | 8 (73%) | $125.00 | $160.00 |
| Portable changeable message sign | 503-7001 | DAY | 19 | 7 (37%) | $100.00 | $100.00 |
| TMA (mobile operation) | 505-7003 | DAY | 12 | 7 (58%) | $162.50 | $291.17 |
| Excavation (roadway) | 110-7001 | CY | 26 | 5 (19%) | $18.50 | $20.00 |
| Vegetative watering | 168-7001 | MG | 19 | 5 (26%) | $40.00 | $29.97 |
| Bonded fiber MTRX seed (temporary)(cool) | 164-7075 | SY | 19 | 5 (26%) | $1.00 | $0.71 |
| Trackhoe work (erosion & sediment control) | 506-7051 | HR | 12 | 5 (42%) | $100.00 | $125.00 |
| Embankment (final)(ord comp)(type C) | 132-6005 | CY | 7 | 5 (71%) | $28.00 | $28.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 29 | 6 of 29 |
| THK Construction LLC | 19 | 16 of 19 |
| Highway 19 Construction LLC | 17 | 8 of 17 |
| Hodges and Son Construction Company, Inc. | 17 | 3 of 17 |
| Longview Bridge and Road, LTD. | 16 | 8 of 16 |
| Cross Plus Construction, LLC | 9 | 2 of 9 |
| Reynolds & Kay, LTD. | 9 | 2 of 9 |
| Garret Shields Infrastructure | 9 | 8 of 9 |
| Baker & Company Construction, LLC | 8 | 6 of 8 |
| 3LW Civil LLC | 8 | 6 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 DEC 2025 | A00218248 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to the Tyler District) | 8 of 8 | $933,051 | +112% |
| 02 DEC 2025 | A00058984 | Atlanta District | Surfacing/Roadway Restoration, US 82 (SH 8 to FM 1398W) | 1 of 5 | $10,382,445 | Low, 5.0% under the second |
| 06 NOV 2025 | A00059355 | Tyler District | Highway Improvement, SH 19 (US 80, S to IH 20, IN CANTON) | 9 of 9 | $16,288,371 | +46% |
| 09 OCT 2025 | A00196394 | Atlanta District | Bridge Replacement, FM 71 (At Lacy Creek to .) | 5 of 7 | $1,503,897 | +13% |
| 08 OCT 2025 | A00196501 | Atlanta District | Intersection Improvements With Right And/Or Left Turn Lanes, SH 49 (At FM 2348 to .) | 4 of 5 | $1,150,630 | +5.0% |
| 05 SEP 2025 | A00063821 | Tyler District | Bridge Replacement, IH 20 (.955 MI W OF SABINE RIVER to .842 MI E OF SABINE RIVER) | 3 of 10 | $38,685,254 | +5.0% |
| 08 AUG 2025 | A00196862 | Tyler District | Hazard Elimination & Safety, FM 855 (US 175 to US 69) | 7 of 13 | $5,455,084 | +33% |
| 07 AUG 2025 | A00043462 | Atlanta District | State Park Improvements, Various (At Daingerfield State Park to .) | 4 of 5 | $500,564 | +103% |
| 07 AUG 2025 | A00049652 | Tyler District | Widen Road - Add Lanes, FM 2275 (FM 3272 IN WHITE OAK, E to FM 1845 (PINE TREE RD) IN LONGVIEW) | 2 of 4 | $23,813,256 | +4.0% |
| 07 AUG 2025 | A00185701 | Lufkin District | Bridge Replacement, COUNTY ROAD 3689 (CR 3689 at Cypress Creek to .) | 4 of 8 | $1,965,519 | +21% |
| 07 AUG 2025 | A00184659 | Tyler District | Hazard Elimination & Safety, US 259 (BU 259 to FM 850) | 1 of 4 | $2,495,224 | Low, 8.0% under the second |
| 02 JUL 2025 | A00058519 | Tyler District | Widen Road - Add Lanes, SL 485 (US 271, IN S GLADEWATER, NORTHERLY to US 80 IN EAST GLADEWATER) | 3 of 6 | $32,718,172 | +3.0% |
| 02 JUL 2025 | A00140933 | Lufkin District | Bridge Replacement, COUNTY ROAD 4700 (CR 4700 AT LEE CREEK to .) | 5 of 6 | $1,527,374 | +8.0% |
| 02 JUL 2025 | A00192923 | Atlanta District | Hazard Elimination & Safety, SH 43 (Rusk CL to Harrison CL) | 5 of 11 | $2,960,788 | +27% |
| 01 JUL 2025 | A00193092 | Tyler District | Hazard Elimination & Safety, FM 1990 (0.1 mi N of Gum Cr to CR 2137) | 7 of 10 | $2,380,503 | +45% |
| 05 JUN 2025 | A00185669 | Lufkin District | Bridge Replacement, OLD BERRING RD (at Long King Creek to .) | 1 of 8 | $1,653,086 | Low, 6.0% under the second |
| 04 JUN 2025 | A00184204 | Atlanta District | Bridge Replacement, CARGILL RD E (At Eight Mile Creek to .) | 1 of 6 | $1,320,898 | Low, 16% under the second |
| 01 MAY 2025 | A00200563 | Atlanta District | Hazard Elimination & Safety, DELIA ST (Page Road to 0.1 Mi. S. of Page Road) | 3 of 6 | $1,046,208 | +26% |
| 01 MAY 2025 | A00184614 | Tyler District | Hazard Elimination & Safety, YOUNG (Mobberly Ave to MLK Blvd) | 7 of 13 | $816,179 | +32% |
| 01 MAY 2025 | A00061563 | Lufkin District | Bridge Replacement, SH 7 (AT MORRAL CREEK to .) | 5 of 8 | $7,372,316 | +18% |
| 06 MAR 2024 | 03243210 | Dallas District | CR Bridge replacement from CR NW 1410 AT MILL CREEK | 5 of 5 | $4,185,506 | +24% |
| 06 MAR 2024 | 03243222 | Atlanta District | FM 993 Replace bridge and approaches from AT WEST GREASY CREEK | 2 of 4 | $1,939,812 | +8.0% |
| 06 MAR 2024 | 03243231 | Tyler District | CS Hazard elimination & safety from YOUNG ST to HUGHES ST | 2 of 3 | $498,277 | +13% |
| 02 FEB 2024 | 02243217 | Dallas District | FM 1391 Bridge replacement from FM 1391 AT CEDAR CREEK | 3 of 10 | $5,796,576 | +6.0% |
| 05 JAN 2024 | 01243216 | Tyler District | US 69 Rehabilitate existing roadway from RAINS C/L to FM 779 | 1 of 6 | $6,350,678 | Low, 22% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.