TxDOT contract A00185669 bid tabulation
Bridge Replacement, OLD BERRING RD (at Long King Creek to .). Let by Texas DOT on June 5, 2025, Polk, Lufkin District. 8 bids received; low bid $1,653,086 by True Roads Construction, LLC, -14% against the engineer's estimate of $1,912,209.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 56
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | True Roads Construction, LLC | $1,653,086 | Low | -14% |
| 2 | THK Construction LLC | $1,750,520 | +6.0% | -8.0% |
| 3 | Skyline Bridge LLC | $1,853,190 | +12% | -3.0% |
| 4 | STX Civil | $1,856,686 | +12% | -3.0% |
| 5 | East Texas Bridge, Inc. | $1,974,330 | +19% | +3.0% |
| 6 | Hodges and Son Construction Company, Inc. | $1,976,212 | +20% | +3.0% |
| 7 | Longview Bridge and Road, LTD. | $1,981,358 | +20% | +4.0% |
| 8 | Isi Contracting, Inc. | $2,579,857 | +56% | +35% |
Engineer's estimate: $1,912,209.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. True Roads Construction, LLC | 2. THK Construction LLC | 3. Skyline Bridge LLC | 4. STX Civil | 5. East Texas Bridge, Inc. | 6. Hodges and Son Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 7.93 | $2,000.00 | $2,300.00 | $2,000.00 | $5,500.00 | $3,000.00 | $5,000.00 | $6,500.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 938 | $20.00 | $25.00 | $20.00 | $22.00 | $30.00 | $25.00 | $25.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 628 | $30.00 | $30.00 | $20.00 | $42.00 | $20.00 | $35.00 | $25.00 |
| 4 | Spec excavation work (hyd excavator) (158-7002) | HR | 2 | $150.00 | $430.00 | $150.00 | $500.00 | $160.00 | $150.00 | $20.00 |
| 5 | Furn & place topsoil (4") (160-7002) | SY | 2,526 | $4.00 | $5.00 | $3.50 | $4.50 | $4.00 | $4.00 | $4.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 1,250 | $2.50 | $0.10 | $0.71 | $1.00 | $1.00 | $0.80 | $1.00 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 1,250 | $2.50 | $0.10 | $0.74 | $1.00 | $1.00 | $0.80 | $1.00 |
| 8 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 2,499 | $2.50 | $5.50 | $1.24 | $1.50 | $1.00 | $1.35 | $2.00 |
| 9 | Vegetative watering (168-7001) | TGL | 103.20 | $10.00 | $26.00 | $10.00 | $1.00 | $50.00 | $25.00 | $1.00 |
| 10 | Soil ret BLKT(SL_mod_sand_wldlfe) (169-7026) | SY | 999 | $5.00 | $5.50 | $2.07 | $2.50 | $8.00 | $2.50 | $3.00 |
| 11 | FL BS (compacted in place)(type D GR 1-2) (6") (247-7056) | SY | 1,564 | $45.00 | $28.00 | $57.50 | $70.00 | $60.00 | $25.00 | $45.00 |
| 12 | Cem stabil BKFL (400-7010) | CY | 156.30 | $350.00 | $325.00 | $350.00 | $325.00 | $220.00 | $350.00 | $250.00 |
| 13 | Drilled shaft (30 in) (416-7005) | LF | 765 | $350.00 | $360.00 | $333.96 | $275.00 | $300.00 | $375.00 | $290.00 |
| 14 | Class C concrete (abutment) (420-7012) | CY | 54.40 | $1,200.00 | $1,425.00 | $1,100.00 | $1,350.00 | $1,000.00 | $1,500.00 | $1,600.00 |
| 15 | Class C concrete (cap) (420-7022) | CY | 17.80 | $2,000.00 | $1,575.00 | $1,500.00 | $1,800.00 | $1,200.00 | $1,500.00 | $1,800.00 |
| 16 | Class C concrete (column) (420-7038) | CY | 10.90 | $2,000.00 | $2,100.00 | $2,500.00 | $2,200.00 | $1,500.00 | $1,500.00 | $2,400.00 |
| 17 | Class C concrete (rac-R) (420-7055) | CY | 21 | $2,600.00 | $1,475.00 | $1,000.00 | $1,500.00 | $1,750.00 | $1,000.00 | $1,500.00 |
| 18 | Reinforced concrete slab (box beam) (422-7005) | SF | 4,690 | $35.00 | $21.00 | $21.00 | $30.00 | $28.00 | $30.00 | $30.00 |
| 19 | Shear key (422-7020) | CY | 16 | $1,000.00 | $700.00 | $800.00 | $900.00 | $700.00 | $1,000.00 | $800.00 |
| 20 | Prestressed concrete box beam (4B20) (425-7026) | LF | 712 | $325.00 | $290.00 | $286.00 | $290.00 | $405.00 | $295.00 | $400.00 |
| 21 | Prestressed concrete box beam (5B20) (425-7027) | LF | 356 | $350.00 | $290.00 | $286.00 | $350.00 | $430.00 | $295.00 | $400.00 |
| 22 | Riprap (concrete)(5 in) (432-7002) | CY | 4.40 | $1,000.00 | $1,100.00 | $1,300.00 | $2,000.00 | $800.00 | $1,000.00 | $850.00 |
| 23 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 42 | $300.00 | $240.00 | $184.00 | $220.00 | $190.00 | $230.00 | $250.00 |
| 24 | Riprap (stone protection)(18 in) (432-7043) | CY | 969 | $225.00 | $190.00 | $184.00 | $200.00 | $210.00 | $240.00 | $190.00 |
| 25 | Rail (type T223) (450-7008) | LF | 272 | $200.00 | $160.00 | $170.00 | $165.00 | $210.00 | $185.00 | $160.00 |
| 26 | Rail (type T631LS) (450-7021) | LF | 249 | $80.00 | $70.00 | $75.89 | $75.00 | $55.00 | $75.00 | $70.00 |
| 27 | Type A joint (454-7001) | LF | 52 | $50.00 | $30.00 | $20.00 | $125.00 | $70.00 | $100.00 | $100.00 |
| 28 | RC pipe (CL III)(36 in) (464-7009) | LF | 120 | $220.00 | $160.00 | $185.00 | $275.00 | $290.00 | $200.00 | $150.00 |
| 29 | Headwall (CH - FW - 45) (diameter= 36 in) (466-7054) | EACH | 2 | $10,000 | $14,500 | $30,000 | $15,000 | $20,000 | $20,000 | $15,000 |
| 30 | Clean existing culverts (480-7001) | EACH | 1 | $2,500.00 | $8,000.00 | $4,000.00 | $12,000 | $3,500.00 | $10,000 | $10,000 |
| 31 | Removing structure (pipe) (496-7007) | LF | 28 | $75.00 | $75.00 | $20.00 | $20.00 | $25.00 | $100.00 | $4,000.00 |
| 32 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $20,000 | $16,000 | $57,500 | $20,000 | $17,500 | $30,000 | $30,000 |
| 33 | Mobilization (500-7001) | LS | 1 | $175,000 | $140,000 | $160,000 | $165,000 | $155,000 | $195,000 | $185,000 |
| 34 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $2,000.00 | $1,000.00 | $969.16 | $2,000.00 | $2,800.00 | $5,000.00 | $2,000.00 |
| 35 | Rock filter dams (install) (type 2) (506-7002) | LF | 438 | $50.00 | $44.00 | $42.12 | $65.00 | $40.00 | $60.00 | $1.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 438 | $15.00 | $12.00 | $10.80 | $10.00 | $5.00 | $14.00 | $1.00 |
| 37 | Construction exits (install) (type 1) (506-7020) | SY | 167 | $30.00 | $38.00 | $42.12 | $20.00 | $25.00 | $75.00 | $1.00 |
| 38 | Construction exits (remove) (506-7024) | SY | 167 | $10.00 | $10.00 | $10.80 | $5.00 | $10.00 | $17.00 | $1.00 |
| 39 | Construction perimeter fence (506-7034) | LF | 669 | $5.50 | $5.00 | $12.00 | $1.00 | $7.00 | $1.00 | |
| 40 | Temporary sediment control fence (install) (506-7039) | LF | 1,495 | $4.00 | $4.75 | $4.32 | $4.00 | $5.00 | $6.00 | $1.00 |
| 41 | Temporary sediment control fence (remove) (506-7041) | LF | 1,495 | $1.00 | $1.20 | $1.08 | $1.50 | $1.00 | $1.35 | $1.00 |
| 42 | Driveways (base) (530-7015) | SY | 80 | $46.00 | $50.00 | $75.00 | $40.00 | $60.00 | $75.00 | |
| 43 | Metal W-beam guard fence (timber post) (540-7001) | LF | 331 | $35.00 | $27.50 | $27.00 | $29.00 | $30.00 | $28.00 | $26.00 |
| 44 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,500.00 | $1,900.00 | $1,863.00 | $2,000.00 | $2,100.00 | $2,000.00 | $1,800.00 |
| 45 | Downstream anchor terminal section (540-7015) | EACH | 3 | $1,500.00 | $1,550.00 | $1,539.00 | $1,750.00 | $1,300.00 | $1,600.00 | $1,500.00 |
| 46 | Remove metal beam guard fence (542-7001) | LF | 125 | $10.00 | $3.30 | $10.00 | $5.00 | $1.00 | $3.00 | $2.00 |
| 47 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,500.00 | $3,400.00 | $3,375.00 | $3,600.00 | $3,000.00 | $3,500.00 | $3,200.00 |
| 48 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $500.00 | $385.00 | $100.00 | $800.00 | $250.00 | $300.00 | $500.00 |
| 49 | Wire fence (type A) (552-7001) | LF | 97 | $50.00 | $36.00 | $40.00 | $50.00 | $30.00 | $50.00 | $25.00 |
| 50 | Wire fence (type C) (552-7003) | LF | 130 | $36.00 | $40.00 | $50.00 | $25.00 | $50.00 | $25.00 | |
| 51 | Wire fence (water gap) (552-7010) | LF | 60 | $50.00 | $64.00 | $75.00 | $200.00 | $25.00 | $100.00 | $80.00 |
| 52 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $110.00 | $250.00 | $200.00 | $1.00 | $150.00 | $50.00 | |
| 53 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 4 | $40.00 | $47.00 | $46.44 | $50.00 | $35.00 | $50.00 | $45.00 |
| 54 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $30.00 | $42.00 | $41.04 | $35.00 | $60.00 | $50.00 | $40.00 |
| 55 | Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061) | EACH | 4 | $125.00 | $88.00 | $86.40 | $50.00 | $95.00 | $100.00 | $500.00 |
| 56 | Install object marker assembly (OM-3L)(TWT)GND (658-7066) | EACH | 2 | $200.00 | $330.00 | $426.60 | $50.00 | $400.00 | $300.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.