TxDOT contract A00192923 bid tabulation
Hazard Elimination & Safety, SH 43 (Rusk CL to Harrison CL). Let by Texas DOT on July 2, 2025, Panola, Atlanta District. 11 bids received; low bid $2,328,377 by H. V. Caver, Inc., -35% against the engineer's estimate of $3,577,550.
- Owner
- Texas DOT
- Letting
- 02 JUL 2025
- Pay items
- 47
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | H. V. Caver, Inc. | $2,328,377 | Low | -35% |
| 2 | THK Construction LLC | $2,620,762 | +13% | -27% |
| 3 | Baker & Company Construction, LLC | $2,738,626 | +18% | -23% |
| 4 | Garret Shields Infrastructure | $2,864,700 | +23% | -20% |
| 5 | True Roads Construction, LLC | $2,960,788 | +27% | -17% |
| 6 | East Texas Bridge, Inc. | $3,134,764 | +35% | -12% |
| 7 | Highway 19 Construction LLC | $3,187,735 | +37% | -11% |
| 8 | Grey Sky Construction LLC | $3,351,270 | +44% | -6.0% |
| 9 | Longview Bridge and Road, LTD. | $3,499,143 | +50% | -2.0% |
| 10 | STX Civil | $3,539,501 | +52% | -1.0% |
| 11 | L. S. Equipment Co., Inc. | $3,860,110 | +66% | +8.0% |
Engineer's estimate: $3,577,550.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. H. V. Caver, Inc. | 2. THK Construction LLC | 3. Baker & Company Construction, LLC | 4. Garret Shields Infrastructure | 5. True Roads Construction, LLC | 6. East Texas Bridge, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 381.91 | $3,000.00 | $2,050.00 | $2,000.00 | $2,340.00 | $2,100.00 | $2,775.00 | $3,300.00 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 187 | $24.75 | $20.00 | $45.40 | $50.00 | $55.00 | $15.00 | |
| 3 | Removing concrete (riprap) (104-7006) | SY | 62 | $65.00 | $25.00 | $30.00 | $68.50 | $50.00 | $64.00 | $25.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 81 | $24.75 | $50.00 | $105.00 | $50.00 | $50.00 | $25.00 | |
| 5 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 429.25 | $66.00 | $35.00 | $20.00 | $31.00 | $50.00 | $40.00 | $35.00 |
| 6 | Blading (150-7001) | STA | 131.75 | $200.00 | $100.00 | $200.00 | $473.00 | $100.00 | $225.00 | $300.00 |
| 7 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 104,276 | $0.15 | $0.10 | $0.13 | $0.15 | $0.15 | $0.12 | $0.12 |
| 8 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 303,621 | $0.55 | $0.52 | $0.62 | $0.80 | $0.55 | $0.62 | $0.57 |
| 9 | Vegetative watering (168-7001) | TGL | 5,523.18 | $7.00 | $0.01 | $10.00 | $1.00 | $20.00 | $13.00 | $4.00 |
| 10 | Cut & restore asphalt paving (400-7008) | SY | 396 | $120.00 | $150.00 | $150.00 | $176.00 | $150.00 | $90.00 | $100.00 |
| 11 | Class C concrete (collar) (420-7061) | EACH | 33 | $900.00 | $800.00 | $1,000.00 | $2,875.00 | $1,000.00 | $1,925.00 | $1,500.00 |
| 12 | Riprap (concrete)(4 in) (432-7001) | CY | 7 | $600.00 | $1,000.00 | $1,100.00 | $600.00 | $1,125.00 | $1,000.00 | |
| 13 | Riprap (mow strip)(4 in) (432-7013) | CY | 40 | $397.65 | $800.00 | $715.00 | $600.00 | $855.00 | $800.00 | |
| 14 | RC pipe (CL III)(18 in) (464-7003) | LF | 2,236 | $60.00 | $47.17 | $75.00 | $49.00 | $60.00 | $68.00 | $60.00 |
| 15 | RC pipe (CL III)(24 in) (464-7005) | LF | 286 | $90.00 | $81.68 | $100.00 | $82.00 | $80.00 | $90.00 | $80.00 |
| 16 | RC pipe (CL III)(30 in) (464-7007) | LF | 50 | $125.00 | $110.07 | $160.00 | $245.00 | $150.00 | $135.00 | $120.00 |
| 17 | RC pipe (CL III)(36 in) (464-7009) | LF | 26 | $200.00 | $154.53 | $200.00 | $269.00 | $200.00 | $220.00 | $175.00 |
| 18 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 504 | $900.00 | $720.00 | $900.00 | $804.00 | $1,200.00 | $925.00 | $875.00 |
| 19 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 47 | $1,500.00 | $1,175.00 | $1,200.00 | $1,257.00 | $1,200.00 | $1,350.00 | $1,375.00 |
| 20 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 2 | $3,500.00 | $2,130.00 | $3,000.00 | $2,850.00 | $2,000.00 | $2,550.00 | $2,500.00 |
| 21 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 2 | $6,600.00 | $5,945.15 | $3,000.00 | $5,993.00 | $6,000.00 | $5,850.00 | $6,000.00 |
| 22 | Clean existing culverts (480-7001) | EACH | 126 | $2,500.00 | $1,050.00 | $1,000.00 | $505.00 | $500.00 | $1,175.00 | $800.00 |
| 23 | Removing structure (headwall) (496-7006) | EACH | 47 | $200.00 | $250.00 | $1,077.00 | $500.00 | $255.00 | $500.00 | |
| 24 | Removing structure (pipe) (496-7007) | LF | 2,206 | $25.00 | $20.00 | $10.00 | $7.70 | $10.00 | $20.00 | $20.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $193,000 | $250,000 | $192,845 | $300,000 | $175,000 | $275,000 | |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $3,699.87 | $1,370.43 | $2,382.00 | $5,000.00 | $3,000.00 | $5,000.00 | |
| 27 | TMA (stationary) (505-7001) | DAY | 190 | $200.00 | $250.00 | $362.50 | $300.00 | $100.00 | $300.00 | |
| 28 | Temporary sediment control fence (install) (506-7039) | LF | 2,710 | $4.75 | $3.50 | $6.21 | $3.85 | $5.00 | $4.20 | $4.00 |
| 29 | Temporary sediment control fence (remove) (506-7041) | LF | 2,710 | $2.00 | $0.60 | $1.61 | $1.10 | $1.00 | $0.70 | $0.65 |
| 30 | Driveways (concrete) (type 2) (530-7009) | SY | 81 | $153.38 | $100.00 | $248.00 | $120.00 | $130.00 | $135.00 | |
| 31 | Metal W-beam guard fence (timber post) (540-7001) | LF | 325 | $22.00 | $28.40 | $24.00 | $40.00 | $30.00 | $28.00 | |
| 32 | Remove metal beam guard fence (542-7001) | LF | 325 | $4.00 | $3.21 | $4.50 | $5.00 | $3.60 | $3.25 | |
| 33 | Remove terminal anchor section (542-7002) | EACH | 1 | $400.00 | $160.50 | $440.00 | $500.00 | $180.00 | $165.00 | |
| 34 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $2,800.00 | $3,210.00 | $2,940.00 | $3,500.00 | $3,600.00 | $3,300.00 | |
| 35 | Guardrail end treatment (remove) (544-7003) | EACH | 3 | $400.00 | $214.00 | $440.00 | $500.00 | $240.00 | $220.00 | |
| 36 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 242 | $340.00 | $287.50 | $307.09 | $316.00 | $300.00 | $275.00 | $325.00 |
| 37 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 9 | $450.00 | $335.00 | $344.54 | $355.00 | $300.00 | $325.00 | $355.00 |
| 38 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 19 | $850.00 | $745.00 | $853.86 | $878.00 | $600.00 | $1,055.00 | $900.00 |
| 39 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 3 | $392.00 | $419.44 | $431.00 | $600.00 | $900.00 | $450.00 | |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 11 | $490.00 | $524.30 | $539.00 | $700.00 | $1,100.00 | $550.00 | |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 7 | $1,100.00 | $481.00 | $514.67 | $529.00 | $700.00 | $1,295.00 | $550.00 |
| 42 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 5 | $1,100.00 | $634.00 | $678.38 | $697.00 | $1,000.00 | $1,350.00 | $700.00 |
| 43 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $764.00 | $817.48 | $840.00 | $1,000.00 | $1,750.00 | $850.00 | |
| 44 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 86 | $600.00 | $416.00 | $445.12 | $458.00 | $450.00 | $600.00 | $465.00 |
| 45 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 11 | $800.00 | $355.00 | $379.85 | $390.00 | $500.00 | $780.00 | $400.00 |
| 46 | Remove SM RD SN sup&AM (644-7073) | EACH | 121 | $160.00 | $99.00 | $105.93 | $109.00 | $100.00 | $130.00 | $125.00 |
| 47 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 7 | $32.00 | $48.15 | $35.00 | $50.00 | $55.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.