L. S. Equipment Co., Inc.: TxDOT bid record
L. S. Equipment Co., Inc. submitted 34 bids on Texas DOT contracts in the data, from 25 MAR 2020 to 05 AUG 2026, and was the low bidder on 5 of them (15%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $33,836,476
- Latest bid
- 05 AUG 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2022 | 8 | 1 | 13% |
| 2023 | 3 | 2 | 67% |
| 2024 | 1 | 0 | 0% |
| 2025 | 8 | 1 | 13% |
| 2026 | 7 | 1 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 15 | 3 | 20% |
| Atlanta District | 10 | 1 | 10% |
| Lufkin District | 9 | 1 | 11% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 34 | 11 (32%) | $4,000.00 | $5,000.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 27 | 8 (30%) | $5.50 | $5.00 |
| Preparing row | 100-7002 | STA | 25 | 7 (28%) | $1,800.00 | $2,750.00 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 19 | 7 (37%) | $1.40 | $1.41 |
| RC pipe (CL III)(24 in) | 464-7005 | LF | 19 | 7 (37%) | $90.00 | $108.13 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 10 | 7 (70%) | $1.50 | $3.00 |
| Bond fiber MTRX seed (permanent)(rural)(sand) | 164-6054 | SY | 10 | 7 (70%) | $0.75 | $0.78 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 30 | 6 (20%) | $1.00 | $1.00 |
| TMA (stationary) | 505-7001 | DAY | 29 | 6 (21%) | $250.00 | $230.00 |
| Rock filter dams (remove) | 506-7011 | LF | 26 | 6 (23%) | $10.25 | $12.00 |
| RC pipe (CL III)(18 in) | 464-7003 | LF | 22 | 6 (27%) | $64.00 | $82.44 |
| Cement | 275-7001 | TON | 20 | 6 (30%) | $222.50 | $230.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| East Texas Bridge, Inc. | 25 | 17 of 25 |
| Longview Bridge and Road, LTD. | 20 | 13 of 20 |
| A. L. Helmcamp, Inc. | 12 | 4 of 12 |
| Drewery Construction Company, Incorporated | 10 | 7 of 10 |
| Pinto Construction Co., Inc. | 8 | 6 of 8 |
| Reynolds & Kay, LTD. | 8 | 3 of 8 |
| THK Construction LLC | 7 | 6 of 7 |
| Baker & Company Construction, LLC | 7 | 4 of 7 |
| Highway 19 Construction LLC | 6 | 3 of 6 |
| Madden Contracting Company, LLC. | 5 | 5 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 AUG 2026 | A00196231 | Atlanta District | Rehabilitate Existing Roadway, SH 11 (0.1 Mi. E. of US 259 to Cass C/L) | 6 of 7 | $12,846,198 | +19% |
| 01 JUL 2026 | A00206568 | Lufkin District | Hazard Elimination & Safety, FM 3016 (FM 228 to CR 1685) | 1 of 5 | $3,814,102 | Low, 1.0% under the second |
| 01 JUL 2026 | A00206280 | Atlanta District | Widen Road - Add Shoulders, FM 123 (US 79 to FM 31S) | 3 of 4 | $2,695,990 | +10% |
| 03 JUN 2026 | A00206565 | Lufkin District | Hazard Elimination & Safety, FM 227 (FM 2544 to 3.3 MILES EAST OF FM 2544) | 3 of 9 | $4,944,496 | +11% |
| 06 MAY 2026 | A00193119 | Lufkin District | Hazard Elimination & Safety, FM 2259 (SH 7 to 2.55 MI S OF SH 7) | 7 of 9 | $6,166,004 | +22% |
| 07 APR 2026 | A00060559 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, FM 1251 (CR 394 (1.5 MI E OF FM 3135), E to PANOLA C/L (1 MI E OF FM 3231)) | 5 of 8 | $9,760,584 | +12% |
| 06 JAN 2026 | A00184512 | Tyler District | Hazard Elimination & Safety, SH 64 (CR 4133 to SL 571) | 5 of 5 | $15,103,709 | +11% |
| 08 OCT 2025 | A00208073 | Atlanta District | Rehabilitate Existing Roadway, SH 49 (0.1 MI. E. OF SH 155 to Marion C/L) | 1 of 9 | $11,029,939 | Low, 15% under the second |
| 08 OCT 2025 | A00196501 | Atlanta District | Intersection Improvements With Right And/Or Left Turn Lanes, SH 49 (At FM 2348 to .) | 5 of 5 | $1,229,347 | +12% |
| 08 AUG 2025 | A00064662 | Lufkin District | Highway Improvement, FM 2076 (END OF PAVEMENT to FM 229) | 4 of 6 | $10,716,479 | +8.0% |
| 08 AUG 2025 | A00196862 | Tyler District | Hazard Elimination & Safety, FM 855 (US 175 to US 69) | 4 of 13 | $4,986,544 | +22% |
| 07 AUG 2025 | A00184659 | Tyler District | Hazard Elimination & Safety, US 259 (BU 259 to FM 850) | 3 of 4 | $2,996,013 | +20% |
| 02 JUL 2025 | A00192923 | Atlanta District | Hazard Elimination & Safety, SH 43 (Rusk CL to Harrison CL) | 11 of 11 | $3,860,110 | +66% |
| 07 FEB 2025 | A00064408 | Tyler District | Roadway Rehabilitation/Reconstruction With No Added Capacity, US 79 (RUSK C/L, SW to .16 MI E OF SH110 IN NW SUMMERFIELD) | 5 of 7 | $5,575,648 | +31% |
| 07 JAN 2025 | A00178004 | Lufkin District | Hazard Elimination & Safety, FM 947 (2.961 mi W of FM 2695 to FM 2695) | 3 of 4 | $6,482,419 | +24% |
| 04 DEC 2024 | A00196488 | Atlanta District | Widen Road - Add Shoulders, FM 994 (FM 1766 to SH 77) | 6 of 6 | $2,667,259 | +101% |
| 02 JUN 2023 | 06233203 | Tyler District | FM 3231 Rehabilitate existing roadway from SH 43 to TO .11 MI S. OF CR 2581 | 1 of 3 | $15,996,366 | Low, 2.0% under the second |
| 02 JUN 2023 | 06233235 | Tyler District | PW State park improvements from VARIOUS LOCATION WITHIN to OLD SABINE BOTTOM WMA | 7 of 8 | $1,744,956 | +104% |
| 01 JUN 2023 | 06233040 | Tyler District | SH 110 Install traffic signal from AT LP 49 | 1 of 2 | $787,821 | Low, 2.0% under the second |
| 01 DEC 2022 | 12223024 | Tyler District | VA State park improvements from VARIOUS LOCATIONS IN to TYLER STATE PARK | 2 of 5 | $995,447 | +8.0% |
| 03 AUG 2022 | 08223037 | Tyler District | SH 64 Intersection improvements with right and/or left from AT CR 289 (WOLFE LN) | 1 of 4 | $2,208,247 | Low, 0.0% under the second |
| 04 MAR 2022 | 03223216 | Atlanta District | CR Replace bridge and approaches from ON CR 2116 AT HAGGERTY CREEK | 10 of 10 | $989,803 | +106% |
| 03 MAR 2022 | 03223006 | Tyler District | CS Bridge replacement from AT UPRR AND SABINE ST to STR #001, IN LONGVIEW | 3 of 4 | $9,785,099 | +5.0% |
| 04 FEB 2022 | 02223218 | Atlanta District | US 259 Resurface existing 4-lane highway from MEDDLIN CREEK to 0.5 MI.S. OF FM 450 | 3 of 4 | $2,039,324 | +3.0% |
| 07 JAN 2022 | 01223212 | Lufkin District | SH 21 Bridge replacement from SH 21 AT CARRIZO CREEK | 2 of 6 | $2,565,699 | +3.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.