TxDOT letting results, December 4, 2024
32 contracts let by Texas DOT on December 4, 2024, $116,102,655 in low bids, a median of 5 bidders per contract. On the 32 with an engineer's estimate, the low bid came in under it 32 times; median low bid -21% against the estimate.
- Owner
- Texas DOT
- Contracts
- 32
- Low bids, total
- $116,102,655
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00124675 | Surfacing/Roadway Restoration, US 84 (EAST LITTLEFIELD CITY LIMITS to HOCKLEY COUNTY LINE) | Lubbock District | 6 | A. L. Helmcamp, Inc. | $25,868,924 | $29,205,229 | +13% | -15% | TxDOT |
| A00187662 | Seal Coat, FM 2493 (Toll 49 to FM 346) | Tyler District | 4 | Ronald R. Wagner & Co., LP | $24,103,696 | $24,248,175 | +1.0% | -3.0% | TxDOT |
| A00208065 | Seal Coat, US 83 (RM 2291 to Menard city limits) | San Angelo District | 3 | Ronald R. Wagner & Co., LP | $11,252,314 | $11,493,224 | +2.0% | -2.0% | TxDOT |
| A00209504 | Seal Coat, SH 171 (Parker County Line to US 377) | Fort Worth District | 4 | Ronald R. Wagner & Co., LP | $9,721,843 | $10,887,003 | +12% | -9.0% | TxDOT |
| A00137832 | Seal Coat, US 90 (INTERSECTION OF US 67/90 to 7.3 MI S OF US 67/90) | El Paso District | 2 | Cox Paving of Texas, Inc. | $6,055,675 | $6,090,235 | +1.0% | -4.0% | TxDOT |
| A00186948 | Preventive Maintenance, SH 351 (JONES COUNTY to 4.5 MILES EAST OF FM 604) | Abilene District | 9 | Foutsco Paving Company, LLC | $5,659,269 | $5,728,329 | +1.0% | -23% | TxDOT |
| A00058845 | Preventive Maintenance, Various (DISTRICTWIDE to .) | El Paso District | 4 | Centerline Technologies, LLC | $3,964,118 | $4,492,765 | +13% | -12% | TxDOT |
| A00129303 | Highway Improvement, Various (VARIOUS LOCATIONS DISTRICTWIDE to .) | Lufkin District | 6 | Centerline Technologies, LLC | $3,846,146 | $3,877,178 | +1.0% | -18% | TxDOT |
| A00190745 | Hazard Elimination & Safety, US 80 (Buffalo Creek Relief to FM 548) | Dallas District | 12 | Ed Bell Construction Company | $3,495,000 | $3,518,597 | +1.0% | -23% | TxDOT |
| A00188283 | Bridge Replacement, COUNTY ROAD 189 (AT SANDIES CREEK to STR # AA01-89-001) | Yoakum District | 7 | Trevway, Inc. | $2,979,227 | $3,199,583 | +7.0% | -13% | TxDOT |
| A00196903 | Preventive Maintenance, Various (Various to Various) | Paris District | 7 | Centerline Technologies, LLC | $2,803,367 | $2,939,942 | +5.0% | -34% | TxDOT |
| A00195662 | Highway Improvement, Various (DISTRICT WIDE to .) | Amarillo District | 5 | Centerline Technologies, LLC | $1,520,328 | $1,671,913 | +10% | -24% | TxDOT |
| A00212230 | BASE FAILURE PAVEMENT REPAIR, SH0036 (VARIOUS ROADWAYS to ACROSS BOSQUE, CORYELL AND HAMILTON CO.) | Waco District | 4 | Big Creek Construction, LTD. | $1,449,375 | $2,098,881 | +45% | -8.0% | TxDOT |
| A00212214 | BASE FAILURE PAVEMENT REPAIR, SH0022 (Various locations to In Hill, Limestone, & Falls County) | Waco District | 3 | Big Creek Construction, LTD. | $1,448,925 | $1,865,571 | +29% | -8.0% | TxDOT |
| A00212213 | BASE FAILURE PAVEMENT REPAIR, US0084 (Various locations to in McLennan County) | Waco District | 3 | Big Creek Construction, LTD. | $1,423,275 | $1,481,812 | +4.0% | -13% | TxDOT |
| A00196488 | Widen Road - Add Shoulders, FM 994 (FM 1766 to SH 77) | Atlanta District | 6 | H. V. Caver, Inc. | $1,327,254 | $1,537,134 | +16% | -41% | TxDOT |
| A00193458 | Hazard Elimination & Safety, FM 1314 (SL 494 to Old Houston Road) | Houston District | 6 | Creacom, Inc. | $1,308,619 | $1,326,076 | +1.0% | -24% | TxDOT |
| A00212007 | METAL BEAM GUARD FENCE REPAIR, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | El Paso District | 5 | Ross Sa Enterprise LLC | $1,234,611 | $1,510,135 | +22% | -24% | TxDOT |
| A00181880 | LIMESTONE ROCK ASPHALT, US0077 (Various locations to Across the Waco District) | Waco District | 2 | Vulcan Construction Materials, LLC | $1,057,040 | $1,068,784 | +1.0% | -6.0% | TxDOT |
| A00207797 | Bridge Maintenance, Various (Various Locations to Various Locations) | Fort Worth District | 11 | 12Twelve Road and Bridge LLC | $896,116 | $984,150 | +10% | -38% | TxDOT |
| A00212119 | Travel Information Center, SL0025 (Langtry Travel Information Center to Langtry Travel Information Center) | Maintenance Division District | 4 | Relmco, Inc. | $874,350 | $1,190,863 | +36% | -2.0% | TxDOT |
| A00207113 | MOWING HIGHWAY RIGHT OF WAY, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County) | Houston District | 4 | Dominion Engineering Management Services (Dems), LLC | $845,281 | $1,219,740 | +44% | -10% | TxDOT |
| A00197898 | Bridge Maintenance, US 290 (AT IH 35 to .) | Austin District | 5 | Aad Contracting Inc. | $768,495 | $822,520 | +7.0% | -4.0% | TxDOT |
| A00204595 | Install/Upgrade Roadway Lighting, IH 45 (North of SH 275 (Harborside Dr) to South of Virginia Point Road) | Houston District | 8 | Sice, Inc. | $709,917 | $776,200 | +9.0% | -48% | TxDOT |
| A00206015 | Surfacing/Roadway Restoration, SL 8 (SH 249 to East of Ella Blvd) | Houston District | 4 | Professional Traffic Control LLC | $405,811 | $459,161 | +13% | -21% | TxDOT |
| A00212619 | ASPHALTIC PATCHING MATERIAL, SH0046 (RDC to RDC) | Maintenance Division District | 3 | Waller County Asphalt Inc. | $212,500 | $272,340 | +28% | -26% | TxDOT |
| A00212614 | HYDRAULIC CEMENT, US0084 (RDC to RDC) | Maintenance Division District | 7 | Aka-Materials | $159,800 | $173,400 | +9.0% | -22% | TxDOT |
| A00212615 | HYDRAULIC CEMENT, SL0007 (RDC to RDC) | Maintenance Division District | 6 | Aka-Materials | $151,980 | $153,000 | +1.0% | -26% | TxDOT |
| A00212618 | ASPHALTIC PATCHING MATERIAL, SL0007 (RDC to RDC) | Maintenance Division District | 5 | Waller County Asphalt Inc. | $150,000 | $188,400 | +26% | -26% | TxDOT |
| A00193189 | Hazard Elimination & Safety, Various (Various Locations to in Wise Co) | Fort Worth District | 7 | Marcom'S Mowing Service, LLC | $149,400 | $164,750 | +10% | -47% | TxDOT |
| A00212616 | HYDRAULIC CEMENT, SH0046 (RDC to RDC) | Maintenance Division District | 5 | Touchstone Resources, LLC | $135,000 | $141,000 | +4.0% | -25% | TxDOT |
| A00212617 | ASPHALTIC PATCHING MATERIAL, US0084 (RDC to RDC) | Maintenance Division District | 5 | Waller County Asphalt Inc. | $125,000 | $161,000 | +29% | -26% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.