Relmco, Inc.: TxDOT bid record
Relmco, Inc. submitted 139 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 19 NOV 2026, and was the low bidder on 61 of them (44%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $248,642,059
- Latest bid
- 19 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 25 | 12 | 48% |
| 2021 | 21 | 7 | 33% |
| 2022 | 20 | 11 | 55% |
| 2023 | 10 | 5 | 50% |
| 2024 | 19 | 13 | 68% |
| 2025 | 20 | 6 | 30% |
| 2026 | 24 | 7 | 29% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 34 | 15 | 44% |
| San Angelo District | 25 | 11 | 44% |
| Austin District | 21 | 7 | 33% |
| Laredo District | 18 | 7 | 39% |
| Corpus Christi District | 13 | 10 | 77% |
| Odessa District | 10 | 4 | 40% |
| Yoakum District | 9 | 2 | 22% |
| El Paso District | 6 | 3 | 50% |
| Edwards | 2 | 1 | 50% |
| Maintenance Division District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Riprap (mow strip)(4 in) | 432-7013 | CY | 64 | 43 (67%) | $495.00 | $643.00 |
| Remove metal beam guard fence | 542-7001 | LF | 55 | 22 (40%) | $2.69 | $3.00 |
| Flowable backfill | 401-7001 | CY | 38 | 22 (58%) | $210.00 | $350.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 73 | 21 (29%) | $3,300.00 | $3,245.00 |
| Excavation (roadway) | 110-7001 | CY | 59 | 20 (34%) | $15.00 | $20.00 |
| TMA (stationary) | 505-7001 | DAY | 103 | 17 (17%) | $250.00 | $230.00 |
| Crash cushion attenuator (remove) | 545-7004 | EACH | 52 | 17 (33%) | $800.00 | $1,000.00 |
| Cem stabil BKFL | 400-7010 | CY | 44 | 17 (39%) | $165.00 | $200.00 |
| Riprap (concrete)(4 in) | 432-7001 | CY | 30 | 17 (57%) | $494.25 | $650.00 |
| Riprap (concrete)(5 in) | 432-7002 | CY | 38 | 15 (39%) | $500.00 | $640.65 |
| Reinforced concrete slab | 422-7001 | SF | 28 | 15 (54%) | $24.04 | $27.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 42 | 14 (33%) | $2,248.95 | $2,140.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Acme Bridge Company, Inc. | 31 | 7 of 31 |
| SCR Civil Construction, LLC | 28 | 3 of 28 |
| FNH Construction, LLC | 22 | 2 of 22 |
| Salinas Construction Technologies, LTD. | 20 | 8 of 20 |
| Dan Williams Company | 18 | 4 of 18 |
| Ragle Construction, Inc. | 17 | 4 of 17 |
| CK Newberry, LLC | 17 | 4 of 17 |
| Hunter Industries, LTD. | 16 | 5 of 16 |
| Built Right Construction of Oklahoma, LLC | 16 | 1 of 16 |
| Angel Brothers Holdings Corp. | 15 | 2 of 15 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 NOV 2026 | A00224304 | Odessa District | BRIDGE REPAIR, IH0020 (VARIOUS to VARIOUS) | 1 of 4 | $669,750 | Low, 5.0% under the second |
| 17 NOV 2026 | A00224111 | San Antonio District | ROCK/RIPRAP, IH0010 (Various Locations throughout to San Antonio District) | 1 of 2 | $207,100 | Low, 80% under the second |
| 04 NOV 2026 | A00209029 | Corpus Christi District | Removal And/Or Replacement And/Or Disposal, IH 37 (1.20 Mi W of SH 358 to @ old UPRR overpass) | 1 of 4 | $849,655 | Low, 15% under the second |
| 03 NOV 2026 | A00211095 | Odessa District | Bridge Maintenance, US 90 (AT 19.6 MI E OF SH 349 to .) | 2 of 7 | $2,978,677 | +3.0% |
| 07 OCT 2026 | A00191892 | Odessa District | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | 1 of 7 | $6,768,348 | Low, 21% under the second |
| 06 OCT 2026 | A00220834 | Laredo District | BRIDGE PREVENTATIVE MAINTENANCE, IH0035 (Various to Various) | 3 of 8 | $1,545,379 | +24% |
| 29 SEP 2026 | A00223850 | San Angelo District | CULVERT REPAIR, FM 2169 (FM 2169 AT SOUTH LLANO RIVER CROSSING to FM 2169 AT SOUTH LLANO RIVER CROSSING) | 2 of 5 | $250,575 | +9.0% |
| 10 SEP 2026 | A00221261 | San Angelo District | BRIDGE PREVENTATIVE MAINTENANCE, US0377 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT) | 8 of 10 | $785,109 | +74% |
| 03 SEP 2026 | A00221262 | San Angelo District | BRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT) | 4 of 11 | $1,478,786 | +7.0% |
| 06 AUG 2026 | A00140254 | San Angelo District | Construct Rest Area, IH 10 (IH 10 Approx 3 miles Pecos County Line to .) | 2 of 6 | $16,617,786 | +21% |
| 05 AUG 2026 | A00136503 | Laredo District | Bridge Replacement, US 83 (1.80 MILES SOUTH OF UVALDE COUNTY LINE to .) | 1 of 10 | $13,786,607 | Low, 5.0% under the second |
| 02 JUL 2026 | A00186990 | San Antonio District | Rehabilitate Bridge, AUGUSTA (On Augusta St. to At San Antonio River) | 3 of 7 | $3,848,184 | +16% |
| 03 JUN 2026 | A00208955 | Corpus Christi District | Bridge Maintenance, Various (@Various Locations to In Corpus Christi District) | 1 of 9 | $478,473 | Low, 4.0% under the second |
| 02 JUN 2026 | A00196825 | Corpus Christi District | Bridge Maintenance, Various (at Various Locations to in Goliad and Karnes Counties) | 8 of 14 | $258,460 | +46% |
| 02 JUN 2026 | A00196419 | San Antonio District | Bridge Maintenance, Various (Various Locations Districtwide to .) | 2 of 5 | $4,955,889 | +9.0% |
| 06 MAY 2026 | A00139927 | San Angelo District | Bridge Replacement, FM 72 (At Spring Creek Bridge to -) | 3 of 10 | $4,940,157 | +12% |
| 08 APR 2026 | A00200988 | San Antonio District | Install/Upgrade Drainage Structure(S), IH 35 (Various Locations On IH 35 to Near Downtown) | 1 of 2 | $32,786,223 | Low, 22% under the second |
| 04 FEB 2026 | A00203603 | Yoakum District | Bridge Maintenance, Various (DISTRICTWIDE to ALL COUNTIES) | 6 of 12 | $2,745,965 | +17% |
| 15 JAN 2026 | A00218389 | San Angelo District | BRIDGE PREVENTATIVE MAINTENANCE, US0377 (VARIOUS LOCATIONS IN THE SAN ANGELO DIST to VARIOUS LOCATIONS IN THE SAN ANGELO DIST) | 5 of 10 | $539,955 | +48% |
| 14 JAN 2026 | A00214341 | San Antonio District | EROSION REPAIR, FM0466 (AT CORDELL CREEK to AT CORDELL CREEK) | 5 of 8 | $82,895 | +42% |
| 07 JAN 2026 | A00130902 | Austin District | Hazard Elimination & Safety, RM 150 (AT Onion Creek Double Crossings to .) | 2 of 10 | $1,048,948 | +5.0% |
| 07 JAN 2026 | A00211280 | Laredo District | State Park Improvements, Various (CHAPARRAL WMA DR. to .) | 8 of 8 | $964,589 | +35% |
| 07 JAN 2026 | A00187815 | Odessa District | Bridge Maintenance, Various (Districtwide to .) | 6 of 12 | $2,252,384 | +36% |
| 06 JAN 2026 | A00214748 | Odessa District | Bridge Maintenance, Various (Districtwide to .) | 4 of 12 | $719,890 | +44% |
| 16 DEC 2025 | A00218605 | Odessa District | BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS to VARIOUS) | 9 of 10 | $1,115,985 | +123% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.