TxDOT contract A00223850 bid tabulation
CULVERT REPAIR, FM 2169 (FM 2169 AT SOUTH LLANO RIVER CROSSING to FM 2169 AT SOUTH LLANO RIVER CROSSING). Let by Texas DOT on September 29, 2026, Kimble, San Angelo District. 5 bids received; low bid $229,995 by MPB, Inc., -46% against the engineer's estimate of $428,414.
- Owner
- Texas DOT
- Letting
- 29 SEP 2026
- Pay items
- 24
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | MPB, Inc. | $229,995 | Low | -46% |
| 2 | Relmco, Inc. | $250,575 | +9.0% | -42% |
| 3 | The Truesdell Corporation | $311,311 | +35% | -27% |
| 4 | Scott Tucker Construction Company, LLC | $398,810 | +73% | -7.0% |
| 5 | Texas Road Construction, LLC | $520,920 | +126% | +22% |
Engineer's estimate: $428,414.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. MPB, Inc. | 2. Relmco, Inc. | 3. The Truesdell Corporation | 4. Scott Tucker Construction Company, LLC | 5. Texas Road Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7003) | SY | 2 | $25.00 | $195.00 | $100.00 | $1,300.00 | $409.00 | $1,650.00 |
| 2 | Removing concrete (riprap) (104-7007) | CY | 55 | $250.00 | $39.00 | $50.00 | $275.00 | $220.00 | $375.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 10 | $45.00 | $16.75 | $50.00 | $350.00 | $198.00 | $450.00 |
| 4 | Embankment (final)(OC)(type A) (132-7001) | CY | 760 | $60.00 | $56.00 | $85.00 | $25.00 | $68.00 | $195.00 |
| 5 | Flowable backfill (401-7001) | CY | 40 | $400.00 | $270.00 | $10.00 | $650.00 | $433.00 | $850.00 |
| 6 | Riprap (mow strip)(4 in) (432-7013) | CY | 2 | $800.00 | $1,300.00 | $1,500.00 | $1,600.00 | $1,598.00 | $1,850.00 |
| 7 | Riprap (stone protection)(36 in) (432-7048) | CY | 430 | $500.00 | $268.00 | $225.00 | $295.00 | $490.00 | $485.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $50,000 | $24,000 | $35,000 | $56,629 | $39,000 | $50,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $15,000 | $1,500.00 | $4,500.00 | $4,500.00 | $6,409.00 | $2,500.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 20 | $350.00 | $1.00 | $250.00 | $1.00 | $430.00 | $1.00 |
| 11 | Temporary sediment control fence (install) (506-7039) | LF | 110 | $10.00 | $5.00 | $10.00 | $15.00 | $5.00 | $1.00 |
| 12 | Temporary sediment control fence (remove) (506-7041) | LF | 110 | $2.00 | $1.00 | $5.00 | $15.00 | $2.00 | $1.00 |
| 13 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 25 | $5.00 | $5.00 | $15.00 | $10.00 | $4.00 | $1.00 |
| 14 | Biodegradable erosion control logs (remove) (506-7046) | LF | 25 | $10.00 | $1.00 | $5.00 | $10.00 | $2.00 | $1.00 |
| 15 | Concrete curb (type I) (529-7001) | LF | 10 | $90.00 | $175.00 | $75.00 | $850.00 | $173.00 | $420.00 |
| 16 | Metal W-beam guard fence (steel post) (540-7002) | LF | 12.50 | $35.00 | $60.00 | $100.00 | $100.00 | $52.00 | $150.00 |
| 17 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,500.00 | $1,800.00 | $1,500.00 | $2,500.00 | $1,932.00 | $8,500.00 |
| 18 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 1 | $600.00 | $1,000.00 | $3,500.00 | $2,500.00 | $1,969.00 | $8,000.00 |
| 19 | Remove metal beam guard fence (542-7001) | LF | 12.50 | $2.50 | $1.00 | $50.00 | $75.00 | $18.00 | $500.00 |
| 20 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $200.00 | $75.00 | $300.00 | $750.00 | $697.00 | $530.00 |
| 21 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 1 | $200.00 | $75.00 | $300.00 | $750.00 | $305.00 | $4,500.00 |
| 22 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $850.00 | $1,000.00 | $750.00 | $500.00 | $1,002.00 | $950.00 |
| 23 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 2 | $850.00 | $1,000.00 | $750.00 | $500.00 | $963.00 | $900.00 |
| 24 | Bridge joint repair (concrete) (785-7001) | LF | 80 | $500.00 | $235.00 | $250.00 | $330.00 | $353.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 29, 2026. Compiled by Mirage Metrics.