Texas Road Construction, LLC: TxDOT bid record
Texas Road Construction, LLC submitted 54 bids on Texas DOT contracts in the data, from 13 OCT 2020 to 12 NOV 2026, and was the low bidder on 6 of them (11%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $922,287
- Latest bid
- 12 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 1 | 25% |
| 2023 | 7 | 0 | 0% |
| 2024 | 6 | 1 | 17% |
| 2025 | 13 | 2 | 15% |
| 2026 | 18 | 2 | 11% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| San Antonio District | 13 | 1 | 8% |
| Fort Worth District | 8 | 1 | 13% |
| Tyler District | 7 | 0 | 0% |
| Dallas District | 5 | 1 | 20% |
| Atlanta District | 4 | 1 | 25% |
| Houston District | 2 | 0 | 0% |
| San Angelo District | 2 | 0 | 0% |
| Yoakum District | 2 | 1 | 50% |
| Lufkin District | 2 | 0 | 0% |
| Waco District | 2 | 1 | 50% |
| Pharr District | 2 | 0 | 0% |
| Austin District | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 43 | 21 (49%) | $2,000.00 | $5,000.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 34 | 21 (62%) | $1.00 | $1.40 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 20 | 14 (70%) | $1.00 | $6.00 |
| TMA (stationary) | 505-7001 | DAY | 12 | 8 (67%) | $200.00 | $230.00 |
| Construction exits (remove) | 506-7024 | SY | 15 | 7 (47%) | $2.00 | $10.00 |
| Biodegradable erosion control logs (install) (8") | 506-7043 | LF | 12 | 6 (50%) | $1.00 | $6.00 |
| Wildflower seeding | 180-7001 | ACRE | 16 | 5 (31%) | $1,050.00 | $1,638.25 |
| Tree trimming / brush removal(channels) | 752-7003 | ACRE | 7 | 5 (71%) | $1,500.00 | $2,500.00 |
| Compost manuf topsoil (4") | 161-7002 | SY | 15 | 4 (27%) | $5.00 | $2.30 |
| Landscape establish | 193-7001 | MO | 11 | 4 (36%) | $1,500.00 | $2,500.00 |
| Tree removal (4" - 12" diameter) | 752-7005 | EACH | 9 | 4 (44%) | $300.00 | $150.00 |
| Irrig sys oper and maintenance | 193-7007 | MO | 12 | 3 (25%) | $1,000.00 | $1,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tight Line Construction, LLC | 28 | 19 of 28 |
| Central North Construction, LLC | 16 | 10 of 16 |
| BK Field Operations LLC | 10 | 9 of 10 |
| Diamond R Contracting, LLC | 10 | 8 of 10 |
| Rare Earth Landscape Solutions LLC | 9 | 6 of 9 |
| Green Sage Services LLC | 8 | 4 of 8 |
| Apex Landscape & Irrigation, LLC | 8 | 8 of 8 |
| Garret Shields Infrastructure | 7 | 3 of 7 |
| C. Green Scaping, L.P. | 6 | 4 of 6 |
| Aad Contracting Inc. | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | A00219681 | Dallas District | BRIDGE SCOUR REPAIR, IH0035W (VARIOUS ROADWAYS IN THE to DENTON COUNTY MAINTENANCE SECTION) | 3 of 6 | $567,220 | +15% |
| 29 SEP 2026 | A00223850 | San Angelo District | CULVERT REPAIR, FM 2169 (FM 2169 AT SOUTH LLANO RIVER CROSSING to FM 2169 AT SOUTH LLANO RIVER CROSSING) | 5 of 5 | $520,920 | +126% |
| 09 SEP 2026 | A00219985 | Dallas District | EROSION REPAIR, FM1378 (FM 1378 to AT SLOAN CREEK) | 1 of 3 | $79,718 | Low, 3.0% under the second |
| 02 SEP 2026 | A00212599 | Pharr District | Landscape Development, PR 100 (PR 100 (WB) to PR 100 (EB)) | 3 of 5 | $104,307 | +12% |
| 06 AUG 2026 | A00217764 | Austin District | Landscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704) | 5 of 8 | $336,390 | +50% |
| 06 AUG 2026 | A00213982 | Lufkin District | Landscape Development, Various (Various Locations Districtwide to .) | 2 of 5 | $455,750 | +1.0% |
| 05 AUG 2026 | A00207273 | Atlanta District | Landscape Development, Various (Various locations to Various locations) | 4 of 4 | $196,605 | +65% |
| 05 AUG 2026 | A00191479 | Pharr District | Landscape Development, BU 77X (E. Washington Ave. to E. Jefferson Ave.) | 2 of 6 | $260,304 | +8.0% |
| 22 JUL 2026 | A00220027 | San Antonio District | EROSION REPAIR, FM2673 (FM 2673 to AT DRAW) | 3 of 4 | $101,271 | +74% |
| 22 JUL 2026 | A00219576 | San Antonio District | EROSION REPAIR, UA0090 (US90A to at Darst Creek) | 2 of 4 | $210,688 | +20% |
| 02 JUL 2026 | A00217109 | Fort Worth District | Landscape Development, IH 20 (Mikus Road to East of Mikus Road) | 7 of 7 | $473,845 | +63% |
| 02 JUL 2026 | A00217103 | Fort Worth District | Landscape Development, FM 156 (FM 156/ S Blue Mound Road to End of Median) | 4 of 7 | $251,531 | +58% |
| 02 JUL 2026 | A00215672 | Tyler District | Landscape Development, Various (Kaufman C/L to Harrison C/L) | 3 of 6 | $302,093 | +38% |
| 03 JUN 2026 | A00217765 | Austin District | Landscape Development, Various (Various locations Districtwide to .) | 3 of 6 | $465,239 | +9.0% |
| 07 APR 2026 | A00217861 | Houston District | Landscape Development, SH 242 (IH 45 to IH 69) | 6 of 7 | $2,171,850 | +43% |
| 18 MAR 2026 | A00214342 | San Antonio District | EROSION REPAIR, FM3175 (AT W PRONG ATASCOSA RIVER to AT W PRONG ATASCOSA RIVER) | 4 of 7 | $121,279 | +68% |
| 18 MAR 2026 | A00218464 | San Antonio District | EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK) | 4 of 7 | $74,346 | +54% |
| 14 JAN 2026 | A00214341 | San Antonio District | EROSION REPAIR, FM0466 (AT CORDELL CREEK to AT CORDELL CREEK) | 1 of 8 | $58,581 | Low, 2.0% under the second |
| 17 DEC 2025 | A00214344 | San Antonio District | EROSION REPAIR, FM0775 (AT ELM CREEK to AT ELM CREEK) | 5 of 5 | $59,334 | +78% |
| 17 DEC 2025 | A00214340 | San Antonio District | EROSION REPAIR, FM2439 (AT UNNAMED DRAW to AT UNNAMED DRAW) | 6 of 6 | $57,858 | +104% |
| 05 SEP 2025 | A00211554 | Tyler District | Landscape Development, Various (VARIOUS LOCATIONS ALONG to US 79) | 4 of 7 | $160,808 | +35% |
| 04 SEP 2025 | A00211512 | Tyler District | Landscape Development, Various (VARIOUS LOCATION ON SH 31 to AND FM 315) | 4 of 5 | $74,132 | +38% |
| 02 JUL 2025 | A00212521 | Fort Worth District | Landscape Development, FM 916 (IH 35W to South Bois D Arc Street) | 1 of 4 | $332,370 | Low, 9.0% under the second |
| 02 JUL 2025 | A00208137 | Waco District | Landscape Development, US 84 (@ Poage Dr to @ Poage Dr) | 1 of 3 | $165,755 | Low, 0.0% under the second |
| 01 JUL 2025 | A00207270 | Atlanta District | Landscape Development, Various (Various locations to Various locations) | 2 of 4 | $136,879 | +4.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.