TxDOT contract A00218464 bid tabulation
EROSION REPAIR, FM2438 (AT MILL CREEK to AT MILL CREEK). Let by Texas DOT on March 18, 2026, Guadalupe, San Antonio District. 7 bids received; low bid $48,346 by BK Field Operations LLC, -1.1% against the engineer's estimate of $48,908.
- Owner
- Texas DOT
- Letting
- 18 MAR 2026
- Pay items
- 23
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BK Field Operations LLC | $48,346 | Low | -1.0% |
| 2 | Aad Contracting Inc. | $63,916 | +32% | +31% |
| 3 | Diamond R Contracting, LLC | $70,503 | +46% | +44% |
| 4 | Texas Road Construction, LLC | $74,346 | +54% | +52% |
| 5 | Garret Shields Infrastructure | $99,657 | +106% | +104% |
| 6 | Salinas Construction Technologies, LTD. | $132,477 | +174% | +171% |
| 7 | Shalom Services Corporation | $155,957 | +223% | +219% |
Engineer's estimate: $48,908.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. BK Field Operations LLC | 2. Aad Contracting Inc. | 3. Diamond R Contracting, LLC | 4. Texas Road Construction, LLC | 5. Garret Shields Infrastructure | 6. Salinas Construction Technologies, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 8 | $38.77 | $200.00 | $20.00 | $500.00 | $100.00 | $50.00 | $114.26 |
| 2 | Removing concrete (miscellaneous) (104-7046) | SY | 4 | $100.00 | $200.00 | $25.00 | $500.00 | $100.00 | $50.00 | $254.97 |
| 3 | Excavation (channel) (110-7002) | CY | 8 | $164.57 | $100.00 | $19.00 | $500.00 | $125.00 | $50.00 | $137.14 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 28 | $48.45 | $1.00 | $55.00 | $2.00 | $65.00 | $50.00 | $78.84 |
| 5 | Compost manuf topsoil (4") (161-7002) | SY | 250 | $1.00 | $1.00 | $7.00 | $2.00 | $4.00 | $5.00 | $27.04 |
| 6 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 250 | $1.00 | $2.00 | $1.50 | $1.00 | $5.00 | $2.50 | $1.80 |
| 7 | Soil ret BLKT(SL_mod_clay_short) (169-7001) | SY | 250 | $2.86 | $5.00 | $2.50 | $1.00 | $5.00 | $1.00 | $15.69 |
| 8 | Flowable backfill (401-7001) | CY | 15 | $56.88 | $250.00 | $250.00 | $200.00 | $300.00 | $300.00 | $313.22 |
| 9 | Concrete structure repair (epoxy mortar) (429-7002) | SF | 14 | $69.32 | $100.00 | $95.00 | $200.00 | $100.00 | $150.00 | $188.19 |
| 10 | Riprap (concrete)(5 in) (432-7002) | CY | 49 | $470.91 | $500.00 | $195.00 | $500.00 | $1,000.00 | $700.00 | $607.57 |
| 11 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 1 | $358.72 | $500.00 | $180.00 | $1,000.00 | $200.00 | $300.00 | $1,393.98 |
| 12 | Mobilization (500-7001) | LS | 1 | $4,600.00 | $3,000.00 | $10,000 | $1.00 | $7,000.00 | $10,000 | $26,446 |
| 13 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $1,438.00 | $1.00 | $7,000.00 | $2,500.00 | $500.00 | $10,000 | $1,699.30 |
| 14 | TMA (stationary) (505-7001) | DAY | 22 | $50.00 | $1.00 | $150.00 | $1.00 | $1.00 | $300.00 | $174.64 |
| 15 | Construction exits (install) (type 1) (506-7020) | SY | 112 | $1.71 | $1.00 | $6.00 | $1.00 | $1.00 | $10.00 | $33.17 |
| 16 | Construction exits (remove) (506-7024) | SY | 112 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $10.71 |
| 17 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 50 | $1.28 | $1.00 | $1.99 | $10.00 | $1.00 | $5.00 | $16.87 |
| 18 | Biodegradable erosion control logs (remove) (506-7046) | LF | 50 | $1.28 | $1.00 | $0.10 | $10.00 | $1.00 | $1.00 | $7.18 |
| 19 | Driftwood removal (735-7061) | LS | 1 | $3,500.25 | $2,000.00 | $5,000.00 | $5,000.00 | $1,000.00 | $2,000.00 | $5,518.77 |
| 20 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.20 | $20,000 | $12,000 | $10,000 | $25,000 | $1,000.00 | $10,000 | $27,589 |
| 21 | Stump removal (752-7004) | EACH | 5 | $35.02 | $120.00 | $300.00 | $1,000.00 | $100.00 | $500.00 | $1,537.50 |
| 22 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 3 | $300.00 | $240.00 | $100.00 | $1,000.00 | $300.00 | $500.00 | $1,839.28 |
| 23 | CNC crack repair (discrete)(inject) (780-7002) | LF | 78 | $18.84 | $50.00 | $95.00 | $50.00 | $10.00 | $100.00 | $173.87 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 18, 2026. Compiled by Mirage Metrics.